Assetz 66 & Shibui

3 & 4 BHK apartments by Apg Environment Homes Private Limited · Whitefield, Bengaluru

Bengaluru Urban District Whitefield, Whitefield, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Apg Environment Homes Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Assetz 66 & Shibui

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Assetz 66 & Shibui is a residential project by Apg Environment Homes Private Limited in Bengaluru Urban District Whitefield, Bengaluru with 96 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2028.

Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Assetz 66 & Shibui buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Apg Environment Homes Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Assetz 66 & Shibui buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 21 Oct 2026
Home types
3 BHK, 4 BHK
Carpet area
1,388 – 2,321 sq ft
Towers
1
Floors
13
Total homes
96
Land
1.82 acres
Possession (RERA)
Jun 2028
Built (RERA update)
74%

Assetz 66 & Shibui RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/300124/006601
Registered on
30 Jan 2024
Promised completion
30 Jun 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
77 of 96 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Tower A132102

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Assetz 66 & Shibui is a residential project by Apg Environment Homes Private Limited in Whitefield, Bengaluru Urban District, with 96 homes in a single 13-storey tower. The project is registered with Karnataka RERA and is expected to be completed on 30 June 2028.

Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
75.4% of land
Water and power
Water source filed with RERA: BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
ICICI Bank, Kumara Park,Bangalore
Project cost declared to RERA
₹156 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation
  • Air Conditioning And incerntion

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz 66 & Shibui location and address

Address
Sy. No. 3/3 (Old Sy. No. 3/1A1 and 3/1A1a) , K R Puram Hobli, Bengaluru East Taluk, Bengaluru Urban District Whitefield Village , Bengaluru East , Bengaluru Urban, Karnataka - 560066
Village (RERA)
Bengaluru Urban District Whitefield
Locality
WhitefieldAlso known as ITPL
PIN code
560066
City
Bengaluru
State
Karnataka
Coordinates
12.97327, 77.75043

Distances to landmarks

Not found in public records yet: landmarks

About Whitefield

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)2.11 kmapprox. 9 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)9.31 kmapprox. 38 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16.41 kmapprox. 66 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)16.57 kmapprox. 67 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)19.61 kmapprox. 79 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)25.78 kmapprox. 104 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 45Schools and colleges23 schools, 2 colleges, 20 kindergartens
  • 18Hospitals and clinics7 hospitals, 11 clinics

Nearest schools and colleges

  • Maple Bear Canadian Pre-School · 0.09 km
  • Greenwood High Pre-school · 0.13 km
  • Cottolengo Special School · 0.25 km

Nearest hospitals and clinics

  • Tata MD · 0.06 km
  • MS Clinic, Diagnostic & Scan Center · 0.35 km
  • Cure N Care Homoeopathic clinic · 0.4 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kadugodi Tree Park (ಕಾಡುಗೋಡಿ ಟ್ರೀ ಪಾರ್ಕ್)Open now — nearest operating metro station1.43 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station2.83 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Pattandur Agrahara Lake, 445 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Assetz 66 & Shibui floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure23 pages

Approved layout plan2 files

Home typeCarpet areaHomes
3 BHK1,388 sq ft48
4 BHK2,023 – 2,321 sq ft48

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz 66 & Shibui possession date and construction status

  • Whole project (promoter’s RERA update)74%

    as on · 77 of 96 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
3 BHK50455
4 BHK523220

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 1 Jan 2024Project start date given to RERA
  2. 30 Jan 2024Registered with Karnataka RERA
  3. 30 Jun 2028Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Sep 2027 — about 9 months before the completion date on RERA (30 Jun 2028).

At the pace between the 4 quarterly filings we have (66% → 74% in 9 months), it would be around Mar 2029 — about 8 months after the RERA date.

0%25%50%75%100%20252026202720282029RERA date66%67%70%74%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202674%77 of 102
Q1 2026-27to 30 Jun 202615 Jul 202670%75 of 102
Q4 2025-26to 31 Mar 202615 Apr 202667%68 of 102
Q3 2025-26to 31 Dec 202531 Mar 202666%63 of 102
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 74% ÷ 33 months (1 Jan 2024 to 30 Sep 2026) = 2.2% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 26 ÷ 2.2 = 11.6 months → Sep 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (74% − 66%) ÷ 9 months = 0.9% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

20 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · dated 2024-01-08Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDeputy Commissioner, Bengluru · No. 43844 · dated 2023-02-07Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
District Magistratescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 14 of the KTCP Actscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring propertiesscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 21 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · dated 8 Jan 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz 66 & Shibui RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Apg Environment Homes Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
U45209KA2020PTC132787

From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Apg Environment Homes Private Limited’s RERA record

Apg Environment Homes Private Limited delivery record

As on 21 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jan 2024

As on 21 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 74% built, 77 of 102 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 70% built, 75 of 102 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 67% built, 68 of 102 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 31 Mar 2026Quarterly update filed for Q3 2025-26: 66% built, 63 of 102 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 30 Jan 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/300124/006601); completion date 30 Jun 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 8 Jan 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 1 Jan 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Assetz 66 & Shibui FAQs

What is Assetz 66 & Shibui?

It is a residential project by Apg Environment Homes Private Limited in Whitefield, Bengaluru East taluk, with 96 homes in one tower.

How many homes and what types are in Assetz 66 & Shibui?

The project has 96 homes: 48 units of 4 BHK with carpet area from 2,023 to 2,321 sq ft, and 48 units of 3 BHK with carpet area of 1,388 sq ft.

What is the expected completion date for Assetz 66 & Shibui?

The project is expected to be completed on 30 June 2028 as per the RERA record.

How much construction is complete in Assetz 66 & Shibui?

As of Q2 2026-27 (quarter ended 30 September 2026), the project is 74% complete.

How many homes are booked in Assetz 66 & Shibui?

As of Q2 2026-27, 77 homes are booked out of the project's 96 homes.

Where is Assetz 66 & Shibui located?

The project is in Whitefield, Bengaluru East taluk, Bengaluru Urban District, PIN code 560066.

What is the RERA registration number for Assetz 66 & Shibui?

The project's RERA registration number is PRM/KA/RERA/1251/446/PR/300124/006601, registered on 30 January 2024.

Are there any RERA complaints on Assetz 66 & Shibui?

There are no RERA complaints on this project and no complaints against the builder across all projects on record.

Who is the escrow bank for Assetz 66 & Shibui?

ICICI Bank is the escrow bank for this project.

How many storeys does the tower in Assetz 66 & Shibui have?

The single tower in the project has 13 storeys.

Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Assetz 66 & Shibui

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Apg Environment Homes Private Limited? Review the builder.

Reviews of Apg Environment Homes Private Limited by verified buyers

No verified reviews of Apg Environment Homes Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Orchid PlatinumGoyal Hariyana Constructions0.6 km250Dec 202885%0Not collected
Ample WhiteAmple Infracon LLP0.6 km37May 202955%0Not collected
Reflections 66House Of Colors Developers Private Limited0.7 km66Dec 203018%0Not collected
Ranka AmberDra Realty Private Limited0.7 km20Jul 202913%0Not collected
Prestige Pine ForestPrestige Estates Projects Ltd0.9 km316Dec 202832%0Not collected
Brigade AvalonBrigade Enterprises Ltd0.9 km206Mar 203047%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/300124/006601.

  • RERA record last checked: 21 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Whitefield