Brigade Group: projects, delivery record and RERA complaints

Bengalurubrigadegroup.com (opens in a new tab)

  • Builder record
  • CIN on record

16 projects

in Bengaluru on Karnataka RERA

Overview

Updated on 4 Oct 2026
Founded
1986
Headquarters
Bengaluru
Bengaluru projects
16
Delivered on time
4 of 10
RERA complaints
44
Court cases listed
3

Brigade Enterprises Limited (CIN L85110KA1995PLC019126) is a listed Bengaluru developer, founded in 1986 and based at the World Trade Center in Malleswaram-Rajajinagar. Karnataka RERA records show its older Bengaluru projects receiving occupancy certificates between 2018 and 2024, some before the original RERA date and several months to about 19 months after it (within extended deadlines). As of 4 October 2026, RERA lists 44 complaints across Brigade Enterprises Ltd projects.

Collected on 4 Oct 2026 from public records. “Delivered on time” counts projects with both a promised date and an occupancy certificate date on record. Free for buyers. If you book through us, the builder pays us a commission.

Company details

Legal name
Brigade Enterprises Limited
CIN (company number)
L85110KA1995PLC019126
Founded
1986
Headquarters
Bengaluru (29th Floor, World Trade Center, Brigade Gateway Campus, Dr. Rajkumar Road, Malleswaram-Rajajinagar, 560055)
Stock exchange
Not found in public records yet: listing

Identity facts come from the records under Sources.

Projects in Bengaluru on Karnataka RERA

63 registrations collected so far; RERA lists 68 registrations for this promoter in total (all districts). Phases of one project are shown as one card.

Includes projects registered with RERA by Brigade Enterprises Ltd’s project companies and joint ventures: Brigade Tetrarch Private Limited (5 projects), BCV Developers Pvt Ltd (4 projects). Each project page names the company that registered it.

Brigade Enterprises Ltd projects by locality

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Completion record on RERA

26 rows: completion record. Scroll inside the table to see them all.

ProjectPromised at registrationExtended toApplied for completionResultOccupancy certificate
Brigade Northridge Neo31 Mar 202230 Sep 202220 May 2026After promised dateUploaded to RERA
Brigade Bricklane31 Dec 202131 Mar 202316 May 2026After promised dateUploaded to RERA
Brigade Oasis - Phase 130 Jun 202530 Jun 202613 Apr 2026After promised date—
Brigade Oasis - Phase 230 Jun 202530 Jun 202613 Apr 2026After promised date—
Brigade Oasis - Phase 330 Jun 202530 Jun 202613 Apr 2026After promised date—
Goldspire at Brigade Orchards30 Jun 202430 Jun 202519 Jun 2025After promised dateUploaded to RERA
NEEM GROVE @ Brigade Orchards30 Apr 2024—13 Feb 2025After promised date—
Gallium at Brigade El Dorado31 Dec 2023—7 Nov 2024After promised dateUploaded to RERA
Helio at Brigade El Dorado31 Dec 2023—7 Nov 2024After promised dateUploaded to RERA
Brigade Woods31 Dec 202030 Sep 202222 Feb 2023After promised dateUploaded to RERA
Brigade Parkside East31 Dec 202030 Sep 20223 Feb 2023After promised dateUploaded to RERA
Brigade Buena Vista-Phase 230 Jun 202130 Mar 20222 Feb 2023After promised dateUploaded to RERA
Brigade Triumph31 Dec 202030 Sep 20221 Feb 2023After promised dateUploaded to RERA
Brigade 7 Gardens31 Oct 202030 Jul 202231 Jan 2023After promised dateUploaded to RERA
Brigade Southfield30 Sep 202030 Mar 202117 Nov 2020After promised date—
Plumeria Lifestyle at Brigade Meadows30 Sep 202030 Mar 202117 Nov 2020After promised date—
Brigade Senate 230 Sep 202030 Mar 202113 Nov 2020After promised date—
Brigade Senate 130 Sep 202030 Mar 202113 Nov 2020After promised date—
Brigade Buena Vista30 Jun 2020—28 Jul 2020After promised date—
Juniper at Brigade Orchards31 Dec 2019—31 May 2020After promised date—
Brigade Atmosphere- Phase 128 Feb 2020—31 May 2020After promised date—
Brigade Lakefront - Crimson30 Jun 2019—22 Aug 2019After promised date—
Brigade Panorama30 Apr 2019—17 Aug 2019After promised date—
The Arcade at Brigade Orchards30 Jun 2019—16 Aug 2019After promised date—
Plumeria Phase 1 at Brigade Meadows31 Jul 2018—10 Dec 2018After promised date—
Signature Towers30 Jun 2018—30 Nov 2018After promised date—

Compares the date the promoter applied to RERA for completion with the completion date given at registration. A dash (—) means RERA did not state it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

RERA complaints against the promoter

Complaints listed
44
Still open
5
Disposed
39
  • 2019: 3
  • 2020: 3
  • 2021: 3
  • 2022: 12
  • 2023: 6
  • 2024: 4
  • 2025: 4
  • 2026: 9

Latest complaints

44 rows: latest rera complaints. Scroll inside the table to see them all.

Complaint no.FiledProject (as written)SubjectStatus
01181/20263 Oct 2026Brigade Oasis - Phase 1Delay in completion - Requesting for delay period interestScrutiny completed
00586/202625 May 2026Brigade Oak Tree PlaceRequest seeking compensation from M/s Brigade for delay in posession / registration of plotUnder enquiry authority
00463/20264 May 2026BRIGADE KOMARLA HEIGHTSComplaint under Sec 31 for violation of Sec 11(4)(e) and Sec 19: Failure to form Association of Allottees and unlawful withholding of statutory NOCs, equipment warranties, and financial ledgers.Disposed authority
00279/202623 Mar 2026Brigade Oak Tree PlaceInterest on Delay of INR 5,43,498/- for 16 months delay from October 2024 to Feb 2026 & RERA not renewed after October 2025Posted for orders authority
00042/202616 Jan 2026Brigade Oasis - Phase 2Application for Adjudication of compensation under Sections 12 and 14 of RERA Act, against Brigade Enterprises Limited for false representation non-disclosure of material facts regarding Plot No.0133Disposed ao
00039/202612 Jan 2026Brigade Oasis - Phase 2Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA – Brigade Oasis Phase2Disposed authority
00030/20269 Jan 2026Brigade Oasis - Phase 2Interest for Delayed Possession - Brigade Oasis Phase 2Disposed authority
00034/20269 Jan 2026Brigade Oasis - Phase 3Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA – Brigade Oasis Phase 3Disposed authority
00031/20269 Jan 2026Brigade Oasis - Phase 3Interest for Delayed Possesion - Brigade Oasis Phase 3Disposed authority
01421/202521 Nov 2025Brigade SanctuaryNon- Registration of Agreement to sell, Non Disclosure of Litigation, Illlegal payment demands, Lack of title indemnity risking Buyers intrest, Illlegal Cancellation notice, Un authorised POA.Disposed authority
01151/202511 Sep 2025Brigade SanctuaryNon-registration of agreement, non-disclosure of litigation, illegal payment demands, and lack of title indemnity risking buyer interest.Disposed authority
00888/202530 Jun 2025Brigade Eterniabooking amount not returnedDisposed authority
00670/202525 Apr 2025Brillio and Commercial at Brigade ValenciaBuilder is not refunding the amount after 45 days of agreed periodPosted for orders authority
01329/202419 Dec 2024Brigade SanctuaryRefusal by Brigade to refund the paid booking amount dishonouring the signed and agreed terms at the time of booking in the booking formDisposed authority
01077/20246 Nov 2024Brigade Parkside NorthRefund and Compensation from Brigade.Disposed authority
00953/202430 Sep 2024Brigade Northridge NeoCommon Aminities Equal Ownership to all ownersUnder enquiry authority
00036/202410 Jan 2024Brigade Atmosphere- Phase 1Complaint to the Real Estate Regulatory Authority under Section 31 of the RERA Act against M/s. Brigade Enterprises Ltd.Disposed authority
01825/202314 Dec 2023Brigade PanoramaExecution of sale deed without charging additional inflated charges since delay on part of respondentDisposed authority
01623/202325 Oct 2023Brigade 7 GardensRemoval of DG chimney from the one of the flat's wall and compensation for not fixing the same.Disposed authority
00986/202327 Jun 2023Brigade Atmosphere- Phase 1Suppression of Litigation against Land vide O.S. No. 577 / 2008 O.S. No. 577 / 2008 O.S. No. 577 / 2008 before Civil Judge (Sr. Div.), DevanahalliDisposed authority
00666/20234 May 2023Brigade Atmosphere- Phase 1Lack of OC and related mattersDisposed authority
00293/20234 Mar 2023Plumeria Phase 1 at Brigade MeadowsWater Seepage in walls around the bathrooms from the time of possessionDisposed authority
00245/202324 Feb 2023Brigade Northridge NeoBrigade Northridge Neo : Construction issues with purchased flat B 607Disposed ao
CMP/220826/000995126 Aug 2022Brigade PanoramaFlat registration is not doneDisposed authority
CMP/220801/00098331 Aug 2022Brigade Parkside NorthWithin 20 days from Registration handover not completedDisposed authority
CMP/220725/000979625 Jul 2022Brigade LagunaBooking amount REfundDisposed authority
CMP/220719/000977219 Jul 2022Brigade LagunaRefund of token amountDisposed authority
CMP/220520/000949220 May 2022Brigade Parkside Eastnot willing for refundDisposed authority
CMP/220411/000934011 Apr 2022Brigade 7 GardensCompensation for delay in completion and handing over the apartmentDisposed authority
CMP/220401/00093011 Apr 2022Brigade Parkside EastComplaint for refund of booking amount together with interest.Disposed authority
CMP/220317/000914917 Mar 2022Brigade Lakefront - CrimsonDiscrepancy in size of apartmentDisposed authority
CMP/220222/000904422 Feb 2022Brigade Buena Vista-Phase 2Delay in Handover of Flat from last 8 monthsDisposed authority
CMP/220222/000903422 Feb 2022Brigade WoodsReal Estate agent 360REALTORSLLP(RERA: PRM/KA/RERA/1251/310/AG/171113/000598) not returning promised discount amount after property bookingDisposed authority
CMP/220129/000888329 Jan 2022Plumeria Lifestyle at Brigade MeadowsDear Sir, Regarding return of deposited amount of Rs. 2100000.00 (Rupees Twenty One Lakhs only) towards Flat No. 0537 at Brigade Meadows Plumeria Lifestyle.Disposed authority
CMP/220113/000878713 Jan 2022Plumeria Lifestyle at Brigade Meadows20000/- rs taken falsely by threatening to not handover house keys and falsely pushed me into the flat stating all the work is doneDisposed authority
CMP/210925/000837525 Sep 2021Brigade WoodsBuilder not allowing inspection of the FlatDisposed authority
CMP/210512/000794812 May 2021Brigade Buena Vista-Phase 2Builder not allowing inspection of our apartmentDisposed authority
CMP/210212/000749812 Feb 2021Plumeria Lifestyle at Brigade MeadowsRecovery of delay compensation, rental loss & Property tax amount with Interest for 6 years of delay caused by builder to deliver possession of flatDisposed authority
CMP/201130/000715930 Nov 2020Brigade PanoramaBrigade has backed out of delay compensation payment after earlier assuring to pay the sameDisposed authority
CMP/200513/000588013 May 2020Brigade PanoramaRefund of amount due to delay in registration/handoverDisposed authority
CMP/200211/000541411 Feb 2020Brigade PanoramaBrigade group not given the compensation as per RERA and changes in the layout planDisposed authority
CMP/190920/000424520 Sep 2019Brigade PanoramaDelay in paying the Delay CompensationDisposed ao
CMP/190915/000419615 Sep 2019Brigade PanoramaWaiting period more than 1.5 years, amenities built on kharab land, Club house not as per agreementDisposed ao
CMP/190802/00037742 Aug 2019Brigade PanoramaProject delay compensation & Veracity of the agreement & Brochure while bookingDisposed ao

Complaint numbers, dates, subjects and status only — never complainants’ names.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Projects in Bengaluru

ProjectRERA numberStatusPromisedExtended toCompletedHomesSource
Brigade EterniaPRM/KA/RERA/1251/309/PR/070325/007559Ongoing31 Mar 2030——1,124Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade InsigniaPRM/KA/RERA/1251/309/PR/180524/006894Ongoing———472Source (brigadegroup.com) (opens in a new tab)
Brigade AvalonPRM/KA/RERA/1251/446/PR/300625/007888Ongoing31 Mar 2030——206Source (brigadegroup.com) (opens in a new tab)
Brigade LakecrestPRM/KA/RERA/1251/446/PR/240625/007866Ongoing31 Mar 2030——604Source (brigadegroup.com) (opens in a new tab)
Brigade BelvederePRM/KA/RERA/1251/446/PR/240326/008549Ongoing31 Mar 2031——1,750Source (brigadegroup.com) (opens in a new tab)
Brigade LuminaPRM/KA/RERA/1251/309/PR/230326/008545Ongoing31 Dec 2030——416Source (brigadegroup.com) (opens in a new tab)
Brigade Citrine (Hosakote)PRM/KA/RERA/1250/304/PR/131224/007287Ongoing30 Jun 2029———Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade SanctuaryPRM/KA/RERA/1251/446/PR/041123/006372Ongoing31 Dec 2028———Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade Calista - Phase 1PRM/KA/RERA/1251/446/PR/030223/005683Ongoing30 Jun 2027———Source (rera.karnataka.gov.in) (opens in a new tab)
Cielo at Brigade ValenciaPRM/KA/RERA/1251/308/PR/120123/005613Ongoing31 Dec 2027———Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade Komarla HeightsPRM/KA/RERA/1251/310/PR/140322/004754Ongoing31 Dec 2026———Source (rera.karnataka.gov.in) (opens in a new tab)
Ebony at Brigade Orchards (Devanahalli)PRM/KA/RERA/1250/303/PR/280225/007530Ongoing———232Source (brigadegroup.com) (opens in a new tab)
Brigade GemPRM/KA/RERA/1251/446/PR/210319/004042Completed31 Aug 2024—22 Jul 2024—Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade BricklanePRM/KA/RERA/1251/309/PR/180808/001981Completed31 Dec 2021—10 Oct 2022—Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade WoodsPRM/KA/RERA/1251/446/PR/180611/001895Completed31 Dec 2020—1 Feb 2022—Source (rera.karnataka.gov.in) (opens in a new tab)
Brigade Parkside NorthPRM/KA/RERA/1251/309/PR/181122/002152Completed31 Mar 2021—15 Mar 2022—Source (rera.karnataka.gov.in) (opens in a new tab)

A dash (—) means the source did not state that value.

Full project pages on this site

  • Brigade Eternia: Exterior render of the residential towers (artist's impression) (artist’s impression)YelahankaArtist’s impressionUnder constructionRERA registeredBuyers’ group open

    Brigade Eternia

    by Brigade Group

    Price: ₹1.06 Cr – ₹4.79 Cras on 4 Oct 2026

    • 1 BHK, 2 BHK, 3 BHK, 4 BHK
    • 441 – 1,884 sq ft
    • Mar 2030

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Brigade Eternia

Delivery record

ProjectPromisedExtended toOccupancy certificateResultSource
Plumeria Phase 1 at Brigade Meadows31 Jul 2018—5 Jul 2018On or beforeSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Lakefront - Crimson30 Jun 2019—28 Dec 2018On or beforeSource (rera.karnataka.gov.in) (opens in a new tab)
Plumeria Lifestyle at Brigade Meadows (RERA date at registration 2020-09-30, extended to 2021-03-30)30 Sep 2020—30 Mar 2020On or beforeSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Woods (RERA date at registration; extended to 2022-09-30 via COVID and Section 6 extensions)31 Dec 2020—1 Feb 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Parkside North (RERA date at registration; extended to 2022-09-30)31 Mar 2021—15 Mar 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Parkside East (RERA date at registration; extended to 2022-09-30)31 Dec 2020—9 May 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Northridge Neo (RERA date at registration; extended to 2022-09-30)31 Mar 2022—13 May 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade 7 Gardens (RERA date at registration; extended to 2022-07-30)31 Oct 2020—4 Jun 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Bricklane (RERA date at registration; extended to 2023-03-31)31 Dec 2021—10 Oct 2022After promised dateSource (rera.karnataka.gov.in) (opens in a new tab)
Brigade Gem31 Aug 2024—22 Jul 2024On or beforeSource (rera.karnataka.gov.in) (opens in a new tab)

“On or before” compares the occupancy certificate date with the completion date first given to RERA.

RERA complaints

44 complaints on Karnataka RERA as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court cases

CaseCourtYearSubjectOutcomeSource
Civil Appeal No. 1779 of 2021Supreme Court of India2021Brigade Lakefront (Whitefield) buyers' consumer complaint over delayed possession: whether 91 buyers could sue on behalf of all buyers of the project as a representative (class) actionBrigade's appeal allowed (17 Dec 2021); the complaint may continue only as a joint complaint by the 91 buyers, not on behalf of everyoneSource (indiankanoon.org) (opens in a new tab)
WP 14579/2025High Court of Karnataka2025Writ petition against revenue (mutation) orders for land in Yelahanka, with Brigade Enterprises as a respondent; listed as litigation in the Brigade Eternia RERA recordDismissed (19 Aug 2026), with liberty to the petitioner to establish title in a civil court firstSource (indiankanoon.org) (opens in a new tab)
WP 14995/2020 and WP 15431/2020 (heard with WP 23086/2022 and connected petitions)High Court of Karnataka2020Brigade, among many developers and owners, challenged fees and charges demanded before building plans and occupancy certificates are issued (Section 18-A of the Karnataka Town and Country Planning Act and related amendments)Batch partly allowed (June 2025): the 2021 and 2023 fee amendments were quashed and Section 18-A charges limited to plots over 20,000 sq mSource (livelaw.in) (opens in a new tab)

We show case numbers, courts, years, subjects and outcomes — never names of private individuals.

Brigade Group reviews by verified buyers

No verified reviews of Brigade Group yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Sources

Karnataka RERA: Project register (rera.karnataka.gov.in) (opens in a new tab) On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row.

  1. Karnataka RERA public project search: promoter search 'Brigade Enterprises Ltd', project detail records (OC dates, extensions) and promoter complaint list (opens in a new tab)
  2. Karnataka RERA list of projects that applied for completion (opens in a new tab)
  3. Brigade Group, Bengaluru residential projects (opens in a new tab)
  4. Brigade Group, delivered projects (opens in a new tab)
  5. Brigade Insignia official page (opens in a new tab)
  6. Brigade Avalon official page (opens in a new tab)
  7. Brigade Lakecrest official page (opens in a new tab)
  8. Brigade Belvedere official page (opens in a new tab)
  9. Brigade Lumina official page (opens in a new tab)
  10. Ebony at Brigade Orchards official page (opens in a new tab)
  11. The Week (PTI): founding year and Eternia launch (opens in a new tab)
  12. Indian Kanoon: Supreme Court, Civil Appeal 1779/2021 (opens in a new tab)
  13. Indian Kanoon: Karnataka High Court WP 14579/2025 (opens in a new tab)
  14. Indian Kanoon: Karnataka High Court WP 23086/2022 batch (lists Brigade petitions) (opens in a new tab)
  15. LiveLaw: outcome of the WP 23086/2022 batch (opens in a new tab)

Not found yet: units for several rera-listed projects (tower tables on the rera record could not be totalled reliably); promised completion for brigade insignia and ebony at brigade orchards (their official pages give no date, and neither appears in the rera promoter search for 'brigade enterprises ltd'); consumer commission orders against the company for bengaluru home buyers (none found that clearly name the company); karnataka rera order outcomes for individual complaints (only status shown).