Assetz Canvas & Cove 2.0

3 BHK apartments by Apg Habitat Private Limited · Begur Road, Bengaluru

Begur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Apg Habitat Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Assetz Canvas & Cove 2.0

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Assetz Canvas & Cove 2.0 is a residential project by Apg Habitat Private Limited in Begur, Bengaluru with 617 homes, registered with Karnataka RERA. The completion date on RERA is 30 Apr 2029. It is registered in 2 phases.

Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Assetz Canvas & Cove 2.0 buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Apg Habitat Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Assetz Canvas & Cove 2.0 buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 21 Oct 2026
Home types
Studio, 3 BHK
Carpet area
277 – 1,281 sq ft
Towers
3
Floors
28
Total homes
617
Land
19.05 acres
Possession (RERA)
Apr 2029
Built (RERA update)
Not found in public records yet: construction progress

Assetz Canvas & Cove 2.0 RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/071223/006454
Registered on
7 Dec 2023
Promised completion
30 Apr 2029
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Block B & CPRM/KA/RERA/1251/310/PR/071223/00645431 Oct 2028373New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Block APRM/KA/RERA/1251/310/PR/020824/00695530 Apr 2029244New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
BLOCK -BBlock B & C201162
BLOCK-CBlock B & C251211
Block ABlock A281244

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Assetz Canvas & Cove 2.0 is a residential project by Apg Habitat Private Limited in Bengaluru South with 617 homes across 3 towers. The project is divided into Block A (244 homes, completion 30 April 2029) and Block B & C (373 homes, completion 31 October 2028).

Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Block B & C
HDFC, Richmond Road
Escrow bank (RERA) · Block A
HDFC, Richmond Road

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation
  • Air Conditioning

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz Canvas & Cove 2.0 location and address

Address
SY. No. 134/3, 133/1, 134/1 , BEGUR , Bengaluru South , Bengaluru Urban, Karnataka - 560068
Village (RERA)
Begur
Locality
Begur RoadAlso known as Begur, Begur Main Road, Begur Koppa Road
PIN code
560068
City
Bengaluru
State
Karnataka
Coordinates
12.87020, 77.63460

Distances to landmarks

Not found in public records yet: landmarks

About Begur Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)4.01 kmapprox. 16 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)7.81 kmapprox. 32 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)13.92 kmapprox. 56 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)17.19 kmapprox. 70 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)19.85 kmapprox. 80 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)37.52 kmapprox. 152 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 27Schools and colleges23 schools, 1 colleges, 3 kindergartens
  • 10Hospitals and clinics5 hospitals, 5 clinics

Nearest schools and colleges

  • Cresent Eng School, Begur · 0.18 km
  • Little Angel Eng School, Begur · 0.37 km
  • GLPS Subhash Nagar, Begur · 0.43 km

Nearest hospitals and clinics

  • Apollo Clinic · 0.81 km
  • Health Gate Diagnostics & Multi-speciality clinic · 1.07 km
  • Sri Sapthagiri Clinic · 1.19 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Singasandra (ಸಿಂಗಸಂದ್ರ)Open now — nearest operating metro station1.62 km
  • Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station8.3 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Begur Lake, 298 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Assetz Canvas & Cove 2.0 floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure2 files

Floor plans5 files

  • Assetz Canvas & Cove 2.0: Annexure 17d-First Floor and Second floor Plan (filed with Karnataka RERA)
    Block A: Annexure 17d-First Floor and Second floor PlanFiled 28 Jun 2024 · Full PDF on RERA
  • Assetz Canvas & Cove 2.0: Annexure 17q-28th and Terrace floor plan (filed with Karnataka RERA)
    Block A: Annexure 17q-28th and Terrace floor planFiled 28 Jun 2024 · Full PDF on RERA
  • Assetz Canvas & Cove 2.0: Annexure 2 -Site Plan, Combined Basement+Ground FloorPlan,Block C - from 1st to 13th Floor Plan, page 1 (filed with Karnataka RERA)
    Block B & C: Annexure 2 -Site Plan, Combined Basement+Ground FloorPlan,Block C - from 1st to 13th Floor PlanFiled 5 Dec 2023 · Full PDF on RERA
  • Assetz Canvas & Cove 2.0: Annexure 3 - Block C -from 14th to Terrace Floor Plan, Block B - 1st to 7th Floor Plan, page 1 (filed with Karnataka RERA)
    Block B & C: Annexure 3 - Block C -from 14th to Terrace Floor Plan, Block B - 1st to 7th Floor PlanFiled 5 Dec 2023 · Full PDF on RERA
  • Assetz Canvas & Cove 2.0: Annexure 4 - Block B - from 8th to Terrace Floor Plan, page 1 (filed with Karnataka RERA)
    Block B & C: Annexure 4 - Block B - from 8th to Terrace Floor PlanFiled 5 Dec 2023 · Full PDF on RERA

Elevations2 files

Approved layout plan2 files

Home typeCarpet areaHomes
3 BHK1,044 – 1,281 sq ft547
Studio277 – 1,216 sq ft68

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz Canvas & Cove 2.0 possession date and construction status

  • Block B & C74%

    as on · 369 of 373 homes booked

  • Block A65%

    as on · 238 of 244 homes booked

Timeline

  1. 1 Nov 2023Block B & C: Project start date given to RERA
  2. 7 Dec 2023Block B & C: Registered with Karnataka RERA
  3. 1 Jul 2024Block A: Project start date given to RERA
  4. 2 Aug 2024Block A: Registered with Karnataka RERA
  5. 31 Oct 2028Block B & C: Completion date given at registration
  6. 30 Apr 2029Block A: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Block B & C)

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around Oct 2027 — about 13 months before the completion date on RERA (31 Oct 2028).

At the pace between the 4 quarterly filings we have (65% → 74% in 9 months), it would be around Nov 2028 — about 1 month after the RERA date.

This project has 2 RERA registrations; the chart uses Block B & C, the one with the most quarterly filings.

0%25%50%75%100%202420252026202720282029RERA date65%71%73%74%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202674%369 of 373
Q1 2026-27to 30 Jun 202615 Jul 202673%321 of 373
Q4 2025-26to 31 Mar 202615 Apr 202671%365 of 373
Q3 2025-26to 31 Dec 202511 Mar 202665%347 of 373
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 74% ÷ 35 months (1 Nov 2023 to 30 Sep 2026) = 2.1% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 26 ÷ 2.1 = 12.3 months → Oct 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (74% − 65%) ÷ 9 months = 1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

27 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Block B & C)BBMP - Bruhat Bengaluru Mahanagara Palike · dated 2023-09-28Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders) (Block B & C)Deputy Commissioner Bangalore · No. ALN/SR/S/164/2007-08 and ALN/SR/S/164/2007-08 and 2 more · dated 2018-10-31Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Block B & C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Block A)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0077/23-24 · dated 2024-06-06Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders) (Block A)Deputy Commissioner Bangalore · No. ALN/SR/S/164/2007-08 andALN/SR/S/164/2007-08 and 2 more · dated 2018-10-31Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Block A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Block A)

As on 21 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0077/23-24 · dated 6 Jun 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz Canvas & Cove 2.0 RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Apg Habitat Private Limited

Promoter type
Company
Projects on this site
2
RERA complaints against promoter
0
Company number (CIN)
U70109KA2016PTC093453

From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Apg Habitat Private Limited’s RERA record

Apg Habitat Private Limited delivery record

As on 22 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Sep 2023

As on 21 Oct 2026
  1. 14 Oct 2026Block B & C: Quarterly update filed for Q2 2026-27: 74% built, 369 of 373 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Oct 2026Block A: Quarterly update filed for Q2 2026-27: 65% built, 238 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Jul 2026Block B & C: Quarterly update filed for Q1 2026-27: 73% built, 321 of 373 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Jul 2026Block A: Quarterly update filed for Q1 2026-27: 62% built, 236 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Apr 2026Block B & C: Quarterly update filed for Q4 2025-26: 71% built, 365 of 373 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Apr 2026Block A: Quarterly update filed for Q4 2025-26: 60% built, 231 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 11 Mar 2026Block B & C: Quarterly update filed for Q3 2025-26: 65% built, 347 of 373 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 11 Mar 2026Block A: Quarterly update filed for Q3 2025-26: 48% built, 195 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 2 Aug 2024Block A: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/020824/006955); completion date 30 Apr 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 1 Jul 2024Block A: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 6 Jun 2024Block A: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDSOUTH/0077/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 7 Dec 2023Block B & C: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/071223/006454); completion date 31 Oct 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 1 Nov 2023Block B & C: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 28 Sep 2023Block B & C: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Assetz Canvas & Cove 2.0 FAQs

What is Assetz Canvas & Cove 2.0?

It is a residential project developed by Apg Habitat Private Limited in Bengaluru South (PIN 560068) comprising 617 homes across 3 towers in two phases.

What are the home types in Assetz Canvas & Cove 2.0?

The project offers Studio and 3 BHK homes. Carpet areas range from 277 to 1,216 sq ft in Block B & C and 277 to 1,281 sq ft in Block A.

When will Assetz Canvas & Cove 2.0 be completed?

Block B & C is scheduled for completion on 31 October 2028, and Block A on 30 April 2029, as per the RERA registration.

How many homes are in each block of Assetz Canvas & Cove 2.0?

Block B & C has 373 homes in 2 towers, and Block A has 244 homes in 1 tower.

What is the construction progress of Assetz Canvas & Cove 2.0?

As of Q2 2026-27 (ended 30 September 2026), Block B & C is 74% complete and Block A is 65% complete.

How many homes are booked in Assetz Canvas & Cove 2.0?

In the latest quarterly update for Q2 2026-27, 369 homes out of 373 in Block B & C and 238 homes out of 244 in Block A were booked.

What are the RERA registration numbers for Assetz Canvas & Cove 2.0?

Block B & C is registered as PRM/KA/RERA/1251/310/PR/071223/006454, and Block A is registered as PRM/KA/RERA/1251/310/PR/020824/006955.

Are there any RERA complaints against this project?

There are no RERA complaints filed against Assetz Canvas & Cove 2.0.

Who is the builder and does Apg Habitat have other projects?

The builder is Apg Habitat Private Limited, a company. It has 3 projects on record with Karnataka RERA, with no complaints filed against it.

What is the escrow bank for Assetz Canvas & Cove 2.0?

The escrow bank for both phases of the project is HDFC.

Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Assetz Canvas & Cove 2.0

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Apg Habitat Private Limited? Review the builder.

Reviews of Apg Habitat Private Limited by verified buyers

No verified reviews of Apg Habitat Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Suraksha Whispering WavesR K Suraksha Properties0.1 km272Dec 20307%0Not collected
Memco Skyline - JutakuMemco Skyline Private Limited0.7 km647May 20315%0Not collected
K&T'S Sai SannidhiK & T Constructions0.8 km40Dec 2025100%0Not collected
Mahindra NewhavenMahindra Lifespace Developers Limited0.8 km119Dec 20298%0Not collected
Mahindra ZenMahindra Lifespace Developers Limited0.9 km228Dec 202861%1Not collected
Legend ValenciaLegend Property1.2 km174Dec 202667%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/071223/006454, PRM/KA/RERA/1251/310/PR/020824/006955.

  • RERA record last checked: 21 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Begur Road