Assetz Mizu & Ki
4 BHK apartments by Apg Skywards Private Limited · Chikkagubi, Hennur Road, Bengaluru
Chikkagubi, Hennur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Apg Skywards Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Mizu & Ki at a glance
- Possession (RERA)Aug 2030Karnataka RERA
- Construction50% builtPromoter’s RERA update · as on 30 Sep 2026
- Homes booked121 of 188 (64%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 18 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroNagawara · 5.66 km (under construction)Open now: Krishnarajapura, 9.1 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 58 min at peak14.32 km straight line · estimate
- Nearest lakeUnnamed lake · 311 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Mizu & Ki is a residential project by Apg Skywards Private Limited in Chikkagubi, Bengaluru with 188 homes, registered with Karnataka RERA. The completion date on RERA is 31 Aug 2030.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Assetz Mizu & Ki buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Apg Skywards Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Mizu & Ki buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 4 BHK
- Carpet area
- 2,257 – 2,494 sq ft
- Towers
- 12
- Floors
- 4
- Total homes
- 188
- Land
- 8.52 acres
- Possession (RERA)
- Aug 2030
- Built (RERA update)
- 50%
Assetz Mizu & Ki RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/070826/008862
- Registered on
- 7 Aug 2026
- Promised completion
- 31 Aug 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 121 of 188 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
12 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| BLOCK 1 | 4 | 1 | 16 |
| BLOCK 2 | 4 | 1 | 16 |
| BLOCK 3 | 4 | 1 | 16 |
| BLOCK 4 | 4 | 1 | 12 |
| BLOCK 5 | 4 | 2 | 12 |
| BLOCK 6 | 4 | 1 | 36 |
| BLOCK 7 | 4 | 1 | 8 |
| BLOCK 8 | 4 | 1 | 40 |
| BLOCK 9 | 4 | 1 | 8 |
| BLOCK 10 | 4 | 1 | 8 |
| BLOCK 11 | 4 | 1 | 8 |
| BLOCK 12 | 4 | 1 | 8 |
A dash (—) means the filing did not state that value.
Summary in plain English
Assetz Mizu & Ki is a residential project by Apg Skywards Private Limited in Chikkagubi, Bengaluru East. The project has 188 four-bedroom homes across 12 towers and is scheduled for completion on 31 August 2030.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 64.9% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Kumar Park ,Bengaluru
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-2/TAS-3/U/14/2026-27 · dated 28 Jul 2026
- Project cost declared to RERA
- ₹571 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Assetz Mizu & Ki location and address
- Address
- PROPOSED RESIDENTIAL DEVELOPMENT AT SY. NO. 50/1,50/3 & 51/1,51/2,51/3,51/4, 51/5 , HENNUR MAIN ROAD, CHIKKAGUBI VILLAGE, BIDARAHALLI HOBLI, BENGALURU EAST TALUK , Bengaluru East , Bengaluru Urban, Karnataka - 562149
- Village (RERA)
- Chikkagubi
- Locality
- Hennur RoadAlso known as Hennur Main Road, Hennur-Bagalur Road, Hennur
- PIN code
- 562149
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.07970, 77.65926
Distances to landmarks
Not found in public records yet: landmarksAbout Hennur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 5.52 km | approx. 22 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.31 km | approx. 54 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 14.32 km | approx. 58 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.9 km | approx. 60 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 17.51 km | approx. 71 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.58 km | approx. 104 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 22Schools and colleges14 schools, 8 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- United International · 0.58 km
- Faran Group of Institutions · 0.76 km
- Alpha College of Engineering · 0.77 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nagawara (ನಾಗವಾರ)Pink Line metro, under construction5.66 km
- HBR Layout (ಎಚ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction6.14 km
- Veerannapalya (ವೀರಣ್ಣಪಾಳ್ಯ)Blue Line metro, under construction6.2 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station9.1 km
- Channasandra (ಚನ್ನಸಂದ್ರ)Nearest railway station7.55 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 311 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 311 m
- Chikka Gubbi Kere on OpenStreetMap (opens in a new tab) (ಚಿಕ್ಕಗುಬ್ಬಿ ಕೆರೆ)927 m
- Dodda Gubbi Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಗುಬ್ಬಿ ಕೆರೆ)1,108 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Mizu & Ki floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

BrochureFull PDF on RERA 
Annexure 13-BrochureFiled 30 Jul 2026 · Full PDF on RERA 






Floor plans12 files

2-BASEMENT FLOOR PLANFiled 6 Aug 2026 · Full PDF on RERA 
3-BLOCK 1- BASEMENT, GROUND TO 3RD FLOOR PLANFiled 6 Aug 2026 · Full PDF on RERA 
Annexure 10b-BASEMENT FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10c-BLOCK 1- BASEMENT, GROUND TO 3RD FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10e-BLOCK 2- BASEMENT, GROUND AND FIRST FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10f-BLOCK 2- SECOND, THIRD ,FOURTH & TERRACE FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10h- BLOCK 3- BASEMENT, GROUND, FIRST & SECOND FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10i-BLOCK 3- THIRD, FOURTH FLOOR & TERRACE FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10k-BLOCK 4- BASEMENT, GROUND, FIRST, SECOND & THIRD FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10m- BLOCK 5- BASEMENT, GROUND, FIRST, SECOND & THIRD FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10o- BLOCK 6- BASEMENT, GROUND, FIRST, SECOND & THIRD FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA 
Annexure 10r-BLOCK 8- BASEMENT, GROUND, FIRST & SECOND FLOOR PLANFiled 30 Jul 2026 · Full PDF on RERA
Approved building plan2 files

Approved Building PlanFull PDF on RERA 
Annexure 15-Approved PlanFiled 30 Jul 2026 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 4 BHK | 2,257 – 2,494 sq ft | 188 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Assetz Mizu & Ki possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 4 BHK | 188 | 121 | 67 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 7 Aug 2026Registered with Karnataka RERA
- 1 Sep 2026Project start date given to RERA
- 31 Aug 2030Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-2/TAS-3/U/14/2026-27 · dated 2026-07-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (7 orders) | Deputy Commissioner · No. ALN(EBB) SR 79/2018-19 and 6 more · dated 2023-01-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-2/TAS-3/U/14/2026-27 · dated 28 Jul 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Assetz Mizu & Ki RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Apg Skywards Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U70101KA2016PTC093454
From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Apg Skywards Private Limited’s RERA recordApg Skywards Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Apg Skywards Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 188Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 188 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2026
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 50% built, 121 of 188 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Aug 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/070826/008862); completion date 31 Aug 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Jul 2026Building plan approved by BDA - Bangalore Development Authority (No. BDA/NM/AS/AA-2/TAS-3/U/14/2026-27) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Assetz Mizu & Ki FAQs
What is Assetz Mizu & Ki?
Assetz Mizu & Ki is a residential project in Chikkagubi, Bengaluru East, with 188 homes across 12 towers of up to 4 floors each.
How many homes are in Assetz Mizu & Ki?
The project has 188 homes, all of which are 4 BHK units.
What is the carpet area of homes in Assetz Mizu & Ki?
The 4 BHK homes have carpet area ranging from 2,257 sq ft to 2,494 sq ft.
When will Assetz Mizu & Ki be completed?
The project is scheduled for completion on 31 August 2030, according to the RERA record.
What is the RERA registration number for Assetz Mizu & Ki?
The RERA registration number is PRM/KA/RERA/1251/446/PR/070826/008862.
How many homes have been booked in Assetz Mizu & Ki?
As of Q2 2026-27 (quarter ended 30 September 2026), 121 homes have been booked out of 188.
What is the construction progress of Assetz Mizu & Ki?
As of Q2 2026-27, the project is 50% complete.
Where is Assetz Mizu & Ki located?
The project is in Chikkagubi, Bengaluru East taluk, with PIN code 562149.
Are there any RERA complaints against Assetz Mizu & Ki?
There are no RERA complaints filed against this project or its builder, Apg Skywards Private Limited.
Who is the builder of Assetz Mizu & Ki?
The builder is Apg Skywards Private Limited, which has one project on the Karnataka RERA records.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Assetz Mizu & Ki
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Apg Skywards Private Limited? Review the builder.
Reviews of Apg Skywards Private Limited by verified buyers
No verified reviews of Apg Skywards Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh TranqvilleVarin Infra Projects Private Limited | 0.1 km | 81 | Mar 2026extended | 100% | 2 | Not collected |
| Adarsh PinecourtVarin Infra Projects Private Limited | 0.1 km | 63 | Mar 2026extended | 98% | 0 | Not collected |
| Radiance FlorestaRadiance Realty Developers India Limited | 0.3 km | 65 | May 2028 | 99% | 0 | Not collected |
| Zala PradosZala Estates And Properties | 0.4 km | 37 | Mar 2029 | 18% | 0 | Not collected |
| DNR ParklinkDNR Corporation Private Limited | 0.6 km | 784 | May 2029 | — | 0 | Not collected |
| Amigo PalacioAmigo Shelters Pvt Ltd | 0.6 km | 55 | Mar 2028 | 40% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/070826/008862.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hennur Road
Chikkagubbi, Hennur RoadUnder constructionRERA registeredBuyers’ group openAdarsh Tranqville
by Varin Infra
Price: Price on requestGet brochure & price →
- 1 BHK, 3.5 BHK, 4 BHK
- 270 – 3,199 sq ft
- Mar 2026 (extended)
RERA not updated since promised Mar 2026 · 81 homes · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Tranqville
Chikkagubbi, Hennur RoadUnder constructionRERA registeredBuyers’ group openAdarsh Pinecourt
by Varin Infra
Price: Price on requestGet brochure & price →
- 1.5 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 732 – 1,238 sq ft
- Mar 2026 (extended)
RERA not updated since promised Mar 2026 · 63 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Pinecourt
Chikagubbi, Hennur RoadUnder constructionRERA registeredBuyers’ group openRadiance Floresta
by Radiance Realty Developers India
Price: Price on requestGet brochure & price →
- 3.5 BHK
- 1,418 – 1,581 sq ft
- May 2028
65 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Radiance Floresta