Assetz Mizumi Reserve
2, 3 & 4 BHK apartments by Apg Community Development Private Limited · Kudlu, Hosur Road, Bengaluru
Kudlu, Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Apg Community Development Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Mizumi Reserve at a glance
- Possession (RERA)Mar 2031Karnataka RERA
- Construction59% built · on pace for Apr 2027RERA filing to 30 Sep 2026 (Tower A1 A2 A4); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroSingasandra · 1.3 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 144 min at peak35.47 km straight line · estimate
- Nearest lakeKudlu Lake/Kere · 603 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Mizumi Reserve is a residential project by Apg Community Development Private Limited in Kudlu, Bengaluru with 704 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2031. It is registered in 2 phases.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Assetz Mizumi Reserve buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Apg Community Development Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Mizumi Reserve buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 967 – 1,681 sq ft
- Towers
- 5
- Floors
- 22
- Total homes
- 704
- Land
- 11.4 acres
- Possession (RERA)
- Mar 2031
- Built (RERA update)
- Not found in public records yet: construction progress
Assetz Mizumi Reserve RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/040226/008450
- Registered on
- 4 Feb 2026
- Promised completion
- 31 Mar 2031
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Tower A1 A2 A4 | PRM/KA/RERA/1251/310/PR/040226/008450 | 30 Dec 2030 | 440 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Tower A3 A5 | PRM/KA/RERA/1251/308/PR/130526/008650 | 31 Mar 2031 | 264 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower 1 | Tower A1 A2 A4 | 22 | 2 | 176 |
| Tower 2 | Tower A1 A2 A4 | 22 | 2 | 176 |
| Tower 4 | Tower A1 A2 A4 | 22 | 2 | 88 |
| TOWER 3 | Tower A3 A5 | 22 | 2 | 176 |
| Tower 5 | Tower A3 A5 | 22 | 2 | 88 |
A dash (—) means the filing did not state that value.
Summary in plain English
Assetz Mizumi Reserve is a residential project by Apg Community Development Private Limited in Kudlu, Bengaluru South. The project has 704 homes across 5 towers in 2 phases, with completion dates of 30 December 2030 for Tower A1 A2 A4 and 31 March 2031 for Tower A3 A5.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BWSSB, Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Tower A1 A2 A4
- ICICI Bank, M.G.Road
- Escrow bank (RERA) · Tower A3 A5
- ICICI Bank, Kumara Park Banaglore
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Assetz Mizumi Reserve location and address
- Address
- AT SY.NO.5/4, 5/5, 173/1, 173/2, 175, 176, 177/1, 177/2, 178, 179/1, 179/2, 180/1, 180/2, 180/3, 187/1, 203 OF KUDLU VILLAGE , AND SY.NO. 5/1 (OLD NO - 5), 6, 7,8/1, 8/4, 8/5 OF PARAPPANA AGRAHARA VILLAGE, BEGUR HOBLI, ANEKAL TALUK, BENGALURU. , Bengaluru South , Bengaluru Urban, Karnataka - 560068
- Village (RERA)
- Kudlu
- Locality
- Hosur RoadAlso known as Hosur Main Road, NH 48
- PIN code
- 560068
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.88520, 77.65600
Distances to landmarks
Not found in public records yet: landmarksAbout Hosur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.07 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 5.08 km | approx. 21 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.95 km | approx. 56 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.43 km | approx. 58 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 18.54 km | approx. 75 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 35.47 km | approx. 144 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 26Schools and colleges23 schools, 1 colleges, 2 kindergartens
- 16Hospitals and clinics9 hospitals, 7 clinics
Nearest schools and colleges
- Shree Vidyanikethan · 0.34 km
- Kalanikethan School · 0.54 km
- GLPS Parappana Agrahara · 0.56 km
Nearest hospitals and clinics
- Smile Smart Dental & Implant Centre · 0.53 km
- Vita Family Clinic · 0.73 km
- Raksha Hospital · 0.74 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Singasandra (ಸಿಂಗಸಂದ್ರ)Open now — nearest operating metro station1.3 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station5.94 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kudlu Lake/Kere, 603 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kudlu Lake/Kere on OpenStreetMap (opens in a new tab) (ಹರಳೂರು ಕೆರೆ)603 m
- Parappana Agrahara Lake on OpenStreetMap (opens in a new tab) 692 m
- Hosakere on OpenStreetMap (opens in a new tab) (ಹೊಸಕೆರೆ)758 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Mizumi Reserve floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure3 files

Tower A3 A5: BrochureFull PDF on RERA 







Tower A1 A2 A4: BrochureFull PDF on RERA 







Tower A1 A2 A4: Updated BrochureFiled 4 Feb 2026 · Full PDF on RERA 






Floor plans11 files

Tower A1 A2 A4: 11-A2-Secound Floor Plan and Typical 3 to 18 and 20 to 22nd floorFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 16-A4-Secound Floor Plan and Typical 3 to 18 and 20 to 22nd floor and 19 and TerraceFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 6-A1-Secound Floor Plan and Typical 3 to 18 and 20 to 22nd floorFiled 3 Feb 2026 · Full PDF on RERA 
Tower A3 A5: Approved Building PlanFull PDF on RERA 
Tower A1 A2 A4: 10-A2-Ground Floor and First Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 15-A4-Ground Floor and First Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 18-Amenity Ground and First Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 4-Combined Ground Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 5-A1-Ground Floor and First Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 12-A2-19th Floor and Terrace Floor PlanFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 7-A1-19th Floor and Terrace Floor PlanFiled 3 Feb 2026 · Full PDF on RERA
Elevations2 files

Tower A1 A2 A4: 14-A2-ElevationFiled 3 Feb 2026 · Full PDF on RERA 
Tower A1 A2 A4: 9-A1-ElevationFiled 3 Feb 2026 · Full PDF on RERA
Approved building plan

Tower A1 A2 A4: Approved Building PlanFull PDF on RERA
Approved layout plan3 files

Tower A1 A2 A4: Annexure 10-Demarcation of Land with LatitudeFiled 26 Jan 2026 · Full PDF on RERA 
Tower A3 A5: Annexure 113-Demarcation of Land with Latitude.pdfFull PDF on RERA 
Tower A1 A2 A4: Demarcation of Land with LatitudeFiled 3 Feb 2026 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 967 sq ft | 6 |
| 3 BHK | 1,305 – 1,453 sq ft | 526 |
| 4 BHK | 1,681 sq ft | 172 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Assetz Mizumi Reserve possession date and construction status
Timeline
- 1 Jan 2026Tower A1 A2 A4: Project start date given to RERA
- 4 Feb 2026Tower A1 A2 A4: Registered with Karnataka RERA
- 1 Apr 2026Tower A3 A5: Project start date given to RERA
- 13 May 2026Tower A3 A5: Registered with Karnataka RERA
- 30 Dec 2030Tower A1 A2 A4: Completion date given at registration
- 31 Mar 2031Tower A3 A5: Completion date given at registration
Construction pace from RERA quarterly filings (Tower A1 A2 A4)
At the average pace so far, construction would reach 100% around Apr 2027 — about 45 months before the completion date on RERA (30 Dec 2030).
At the pace between the 3 quarterly filings we have (2% → 59% in 6 months), it would be around Feb 2027 — about 47 months before the RERA date.
This project has 2 RERA registrations; the chart uses Tower A1 A2 A4, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 59% | 302 of 440 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 54% | 286 of 440 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 2% | 275 of 440 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 59% ÷ 8.9 months (1 Jan 2026 to 30 Sep 2026) = 6.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 41 ÷ 6.6 = 6.2 months → Apr 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (59% − 2%) ÷ 6 months = 9.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
20 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Tower A1 A2 A4) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BSCC/Addl.CTP/0001/25-26 · dated 2026-01-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (13 orders) (Tower A1 A2 A4) | Deputy Commissioner · No. ALA(A) (SH) SR 128/2010-11 and 12 more · dated 2020-01-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Tower A1 A2 A4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Tower A3 A5) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/22720/25-26 · dated 2026-04-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (13 orders) (Tower A3 A5) | Deputy Commissioner · No. ALA(A) (SH) SR 128/2010-11 and 12 more · dated 2020-01-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Tower A3 A5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Tower A1 A2 A4)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BSCC/Addl.CTP/0001/25-26 · dated 31 Jan 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Assetz Mizumi Reserve RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Apg Community Development Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45203KA2014PTC077653
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Apg Community Development Private Limited’s RERA recordApg Community Development Private Limited delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Apg Community Development Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 704Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 704 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2026
- 15 Oct 2026Tower A1 A2 A4: Quarterly update filed for Q2 2026-27: 59% built, 302 of 440 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Tower A3 A5: Quarterly update filed for Q2 2026-27: 59% built, 15 of 264 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Tower A1 A2 A4: Quarterly update filed for Q1 2026-27: 54% built, 286 of 440 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Tower A3 A5: Quarterly update filed for Q1 2026-27: 49% built, 6 of 264 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 May 2026Tower A3 A5: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/130526/008650); completion date 31 Mar 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Tower A1 A2 A4: Quarterly update filed for Q4 2025-26: 2% built, 275 of 440 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Apr 2026Tower A3 A5: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/CC/22720/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2026Tower A3 A5: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Feb 2026Tower A1 A2 A4: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/040226/008450); completion date 30 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Tower A1 A2 A4: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. GBA/BSCC/Addl.CTP/0001/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2026Tower A1 A2 A4: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Assetz Mizumi Reserve FAQs
What is Assetz Mizumi Reserve?
Assetz Mizumi Reserve is a residential project by Apg Community Development Private Limited located in Kudlu, Bengaluru South, with PIN code 560068.
How many homes are in Assetz Mizumi Reserve?
The project has 704 homes total: 440 homes in Tower A1 A2 A4 (phase 1) and 264 homes in Tower A3 A5 (phase 2).
What home types are available in Assetz Mizumi Reserve?
The project offers 2 BHK, 3 BHK and 4 BHK homes. Carpet area ranges from 967 sq ft for 2 BHK to 1,681 sq ft for 4 BHK.
When will Assetz Mizumi Reserve be completed?
Tower A1 A2 A4 has a completion date of 30 December 2030, and Tower A3 A5 has a completion date of 31 March 2031.
What is the RERA registration number for Assetz Mizumi Reserve?
Phase 1 (Tower A1 A2 A4) is registered as PRM/KA/RERA/1251/310/PR/040226/008450 and Phase 2 (Tower A3 A5) is registered as PRM/KA/RERA/1251/308/PR/130526/008650.
How many homes have been booked in Assetz Mizumi Reserve?
As of Q2 2026-27, 302 homes have been booked in Tower A1 A2 A4 and 15 homes have been booked in Tower A3 A5.
What is the construction progress of Assetz Mizumi Reserve?
As of Q2 2026-27 (quarter ended 30 September 2026), construction is 59% complete on both phases.
Are there any RERA complaints for Assetz Mizumi Reserve?
There are no RERA complaints on this project or against the builder.
How many towers does Assetz Mizumi Reserve have?
The project has 5 towers: 3 towers in phase 1 (A1, A2, A4) and 2 towers in phase 2 (A3, A5), each up to 22 floors.
What is the land area of Assetz Mizumi Reserve?
Phase 1 has a land area of 38,660 sq m and Phase 2 has a land area of 7,494 sq m.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Assetz Mizumi Reserve
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Apg Community Development Private Limited? Review the builder.
Reviews of Apg Community Development Private Limited by verified buyers
No verified reviews of Apg Community Development Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sree Nidhi BrindhavanSree Nidhi Developers | 0.5 km | 64 | Dec 2028 | 20% | 0 | Not collected |
| Abhee Riviera RoyaleAbheeventures Pvt Ltd | 0.6 km | 96 | Feb 2027 | 86% | 0 | Not collected |
| Iresh AdvaitaM/s. IRESH INFRA | 0.6 km | 40 | Dec 2027 | 100% | 0 | Not collected |
| Olive & OakAshrith Vciti Projects | 0.6 km | 108 | Feb 2028 | — | 0 | Not collected |
| Verdant Tropical HeightsVerdant Builders And Developers | 0.8 km | 88 | Jun 2029 | 25% | 0 | Not collected |
| Raj Etternia E Block (Building 4)SNN Properties LLP | 1.3 km | 150 | Apr 2026 | 79% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/040226/008450, PRM/KA/RERA/1251/308/PR/130526/008650.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hosur Road
Kudlu, Harlur RoadUnder constructionRERA registeredBuyers’ group openSree Nidhi Brindhavan
by Sree Nidhi
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 564 – 959 sq ft
- Dec 2028
64 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sree Nidhi Brindhavan
Kudlu, Hosur RoadUnder constructionRERA registeredBuyers’ group openAbhee Riviera Royale
by Abheeventures
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 829 – 10,269 sq ft
- Feb 2027
96 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Abhee Riviera Royale
Parappana Agrahara, Hosur RoadUnder constructionRERA registeredBuyers’ group openIresh Advaita
by M/s. IRESH INFRA
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 612 – 951 sq ft
- Dec 2027
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Iresh Advaita