Assetz Promise of Spring
30×40, 30×50 plots by Sambhav Ventures Realty LLP · Avathi, near Devanahalli, Bengaluru
Avathi, near Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Sambhav Ventures Realty LLP
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Promise of Spring at a glance
- Completion (RERA)Oct 2027Karnataka RERA
- Construction88% built · on pace for Jan 2027 3 mo after RERA dateRERA filing to 30 Sep 2026 (Phase-1); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroKIAL Terminals · 10.14 km (under construction)Open now: Krishnarajapura, 32.49 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 40 min at peak9.98 km straight line · estimate
- Nearest lakeUnnamed lake · 1,948 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Promise of Spring is a plotted development by Sambhav Ventures Realty LLP in Avathi, Bengaluru with 316 plots, registered with Karnataka RERA. The completion date on RERA is 31 Oct 2027. It is registered in 2 phases.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Assetz Promise of Spring buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sambhav Ventures Realty LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Promise of Spring buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 853 – 13,812 sq ft
- Total plots
- 316
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 55
- Completion (RERA)
- Oct 2027
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 114 |
| 30×50 | 1,500 sq ft | 92 |
| Odd-sized (irregular) | varies | 108 |
| Commercial | — | 2 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
55 rows: land conversion orders. Scroll inside the table to see them all.
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase-1 | 171/1 | Residential | No. 264024, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 171/2 | Residential | No. 157776, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 171/3 | Residential | No. 261023, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 171/5 | Residential | No. 261059, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 171/6 | Residential | No. 264026, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 174/1 | Residential | No. 157701, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 174/2 | Residential | No. 202084, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 174/3 | Residential | No. 157700, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 174/4 | Residential | No. 157699, 21 Oct 2020 | Deputy Commissioner |
| Phase-1 | 174/5 | Residential | No. 157698, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 174/6 | Residential | No. 157697, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 174/7 | Residential | No. 157696, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 175/1 | Residential | No. 151202, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/10 | Residential | No. 151200, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/2 | Residential | No. 151195, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/3 | Residential | No. 151192, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/5 | Residential | No. 151183, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/6 | Residential | No. 151186, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 175/7 | Residential | No. 264025, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 175/8 | Residential | No. 264022, 22 Oct 2021 | Deputy Commissioner |
| Phase-1 | 175/9 | Residential | No. 151193, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 177/1 | Residential | No. 151187, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 177/2 | Residential | No. 151188, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 178/1 | Residential | No. 157777, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 178/10 | Residential | No. 202085, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 178/12 | Residential | No. 202075, 31 Mar 2021 | Deputy Commissioner |
| Phase-1 | 178/2 | Residential | No. 157773, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 178/3 | Residential | No. 169300, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 178/4 | Residential | No. 157775, 20 Oct 2020 | Deputy Commissioner |
| Phase-1 | 178/5 | Residential | No. 202079, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 178/6 | Residential | No. 169299, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 178/8 | Residential | No. 202068, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 178/9 | Residential | No. 202083, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 182/1 | Residential | No. 202069, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 183/1 | Residential | No. 151185, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/10 | Residential | No. 151190, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/2 | Residential | No. 202081, 30 Mar 2021 | Deputy Commissioner |
| Phase-1 | 183/3 | Residential | No. 151198, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/4 | Residential | No. 157772, 14 Sep 2020 | Deputy Commissioner |
| Phase-1 | 183/5 | Residential | No. 151184, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/6 | Residential | No. 151197, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/7 | Residential | No. 151189, 2 Jun 2020 | Deputy Commissioner |
| Phase-1 | 183/8 | Residential | No. 151201, 2 Jun 2020 | 3 Gunta |
| Phase-1 | 183/9 | Residential | No. 151191, 2 Feb 2019 | Deputy Commissioner |
| Phase-2 | 174/1 | Residential | No. 157701, 14 Sep 2024 | Deputy Commissioner |
| Phase-2 | 174/2 | Residential | No. 202084, 30 Mar 2021 | Deputy Commissioner |
| Phase-2 | 174/3 | Residential | No. 157700, 14 Sep 2020 | Deputy Commissioner |
| Phase-2 | 175/1 | Residential | No. 151202, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 175/3 | Residential | No. 151192, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 175/5 | Residential | No. 151183, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 175/6 | Residential | No. 151186, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 175/9 | Residential | No. 151193, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 183/3 | Residential | No. 151198, 2 Jun 2020 | Deputy Commissioner |
| Phase-2 | 183/4 | Residential and Commercial | No. 157772, 14 Sep 2020 | Deputy Commissioner |
| Phase-2 | 183/5 | Residential | No. 151184, 2 Jun 2020 | Deputy Commissioner |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Assetz Promise of Spring RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/030424/006771
- Registered on
- 3 Apr 2024
- Promised completion
- 31 Oct 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Phase-1 | PRM/KA/RERA/1251/309/PR/030424/006771 | 31 Oct 2026 | 291 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-2 | PRM/KA/RERA/1251/310/PR/050924/006995 | 31 Oct 2027 | 25 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Assetz Promise of Spring is a plotted layout by Sambhav Ventures Realty LLP in Avathi, Bengaluru North, with 316 plots across two phases. Phase-1 has 291 plots completing by 31 October 2026, and Phase-2 has 25 plots completing by 31 October 2027. The layout is approved by BIAAPA.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase-1
- HDFC, RACE COURSE ROAD
- Escrow bank (RERA) · Phase-2
- HDFC, RACECOURSE ROAD
Amenities
Assetz Promise of Spring location and address
- Address
- SURVEY OF LAND SY No.171/1 , 171/5, 171/6, 171/ 2, 171/ 3, 174/1, 174/2, 174/3, 174/4, 174/5, 174/6, 174/7, 175/1, 175/2, 175/3, 175/4, 175/5 , 175/6, , AVATHI VILLAGE, DEVANAHALLI HOBLI, DEVANAHALLI TALUK, , Bengaluru North , Bengaluru Urban, Karnataka - 562110
- Village (RERA)
- Avathi
- Locality
- Near Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.28900, 77.72100
Distances to landmarks
Not found in public records yet: landmarksAbout Avathi
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 9.98 km | approx. 40 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.93 km | approx. 117 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 33.56 km | approx. 136 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 38.26 km | approx. 155 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 40.85 km | approx. 165 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 49.23 km | approx. 199 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction10.14 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction10.73 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction13.91 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station32.49 km
- Avatihalli (ಅವತಿಹಳ್ಳಿ)Nearest railway station1.24 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,948 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Promise of Spring layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

Phase-1: BrochureFull PDF on RERA 







Phase-2: BrochureFull PDF on RERA
Approved building plan2 files

Phase-1: Approved Building/Plotting PlanFull PDF on RERA 
Phase-2: Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan2 files

Phase-1: Annexure 112 -Drawings Demarcation.pdfFull PDF on RERA 
Phase-2: Annexure 209-Phasewise DemarcationFiled 14 Jun 2024 · Full PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 114 |
| Plot 9.14 m × 15.24 m | — | 92 |
| Commercial 1 | — | 1 |
| Commercial 2 | — | 1 |
| Odd plots | — | 108 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Assetz Promise of Spring completion date and development status
Timeline
- 3 Apr 2024Phase-1: Registered with Karnataka RERA
- 1 May 2024Phase-1: Project start date given to RERA
- 1 Jun 2024Phase-2: Project start date given to RERA
- 5 Sep 2024Phase-2: Registered with Karnataka RERA
- 31 Oct 2026Phase-1: Completion date given at registration
- 31 Oct 2027Phase-2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase-1)
At the average pace so far, construction would reach 100% around Jan 2027 — about 3 months after the completion date on RERA (31 Oct 2026).
At the pace between the 4 quarterly filings we have (80% → 88% in 9 months), it would be around Nov 2027 — about 12 months after the RERA date.
This project has 2 RERA registrations; the chart uses Phase-1, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 13 Oct 2026 | 88% | — |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 86% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 84% | — |
| Q3 2025-26to 31 Dec 2025 | 4 Mar 2026 | 80% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 88% ÷ 29 months (1 May 2024 to 30 Sep 2026) = 3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 12 ÷ 3 = 4 months → Jan 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (88% − 80%) ÷ 9 months = 0.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
17 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Phase-1) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LOA/126/2022-23/23-24/2543 · dated 2024-02-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (44 orders) (Phase-1) | Deputy Commissioner · No. 264024 and 43 more · dated 2021-10-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase-2) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LOA/126/2022-23/23-24/2543 · dated 2024-02-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (11 orders) (Phase-2) | Deputy Commissioner · No. 157701 and 10 more · dated 2024-09-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase-1)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LOA/126/2022-23/23-24/2543 · dated 28 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Assetz Promise of Spring RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sambhav Ventures Realty LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACB-3536
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sambhav Ventures Realty LLP’s RERA recordSambhav Ventures Realty LLP delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Sambhav Ventures Realty LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 316Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 316 plots in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 13 Oct 2026Phase-1: Quarterly update filed for Q2 2026-27: 88% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Oct 2026Phase-2: Quarterly update filed for Q2 2026-27: 85% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase-1: Quarterly update filed for Q1 2026-27: 86% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase-2: Quarterly update filed for Q1 2026-27: 82% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase-1: Quarterly update filed for Q4 2025-26: 84% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase-2: Quarterly update filed for Q4 2025-26: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2026Phase-1: Quarterly update filed for Q3 2025-26: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2026Phase-2: Quarterly update filed for Q3 2025-26: 76% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Sep 2024Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/050924/006995); completion date 31 Oct 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2024Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2024Phase-1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Apr 2024Phase-1: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/030424/006771); completion date 31 Oct 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Feb 2024Phase-1: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAPPA/TP/LOA/126/2022-23/23-24/2543) Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Feb 2024Phase-2: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAPPA/TP/LOA/126/2022-23/23-24/2543) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Assetz Promise of Spring FAQs
What plot sizes are available in Assetz Promise of Spring?
Phase-1 offers 30×40 plots (1,200 sq ft), 30×50 plots (1,500 sq ft), and 104 odd-sized plots. Phase-2 offers the same sizes: 30×40 plots (1,200 sq ft), 30×50 plots (1,500 sq ft), and 4 odd-sized plots.
How many plots does Assetz Promise of Spring have?
The project has 316 plots total: 291 plots in Phase-1 and 25 plots in Phase-2.
What is the RERA registration number for Assetz Promise of Spring?
Phase-1 is registered as PRM/KA/RERA/1251/309/PR/030424/006771 (registered 3 April 2024) and Phase-2 is registered as PRM/KA/RERA/1251/310/PR/050924/006995 (registered 5 September 2024).
When will Assetz Promise of Spring be completed?
Phase-1 completion date is 31 October 2026, and Phase-2 completion date is 31 October 2027.
Who approved the layout for Assetz Promise of Spring?
The layout is approved by BIAAPA.
How many land conversion orders are there for Assetz Promise of Spring?
Phase-1 has 44 land conversion orders and Phase-2 has 11 land conversion orders.
What is the development progress of Assetz Promise of Spring?
As of Q2 2026-27 (quarter ended 30 September 2026), Phase-1 is 88% developed and Phase-2 is 85% developed.
Are there any RERA complaints against Assetz Promise of Spring or its developer?
There are no RERA complaints on this project or against the developer Sambhav Ventures Realty LLP.
Where is Assetz Promise of Spring located?
The project is in Avathi, Bengaluru North taluk, Bengaluru Urban district, PIN code 562110.
How many projects does the developer have in the RERA records?
Sambhav Ventures Realty LLP has 1 project in the Bengaluru RERA records.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Assetz Promise of Spring
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Sambhav Ventures Realty LLP? Review the developer.
Reviews of Sambhav Ventures Realty LLP by verified buyers
No verified reviews of Sambhav Ventures Realty LLP yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Elite Sai Gardens Phase 5Elite Estates | 1.1 km | 23 | Dec 2027 | — | 0 | Not collected |
| Summers At Orchid NirvanaMango Developers | 1.8 km | 504 | Mar 2031 | 20% | 0 | Not collected |
| Devan HillsLachman Estates | 2.7 km | 46 | Dec 2031 | — | 0 | Not collected |
| Echoes of the HillsEsteem Lifestyle | 2.8 km | 52 | May 2028 | — | 0 | Not collected |
| Urban SpacesShridevi B T | 3.7 km | 20 | Apr 2026 | — | 0 | Not collected |
| Gokula SquareSai Bharathi Resorts Private Limited | 4.1 km | 64 | Jun 2026 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/309/PR/030424/006771, PRM/KA/RERA/1251/310/PR/050924/006995.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Avathi, DevanahalliUnder constructionRERA registeredBuyers’ group openElite Sai Gardens Phase 5
by Elite Estates
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 1,952 – 2,685 sq ft plots
- Approved by BIAAPA
- Dec 2027
23 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Elite Sai Gardens Phase 5
Avathi, DevanahalliUnder constructionRERA registeredBuyers’ group openSummers At Orchid Nirvana
by Mango
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60
- 1,100 – 16,687 sq ft plots
- Approved by BIAAPA
- Mar 2031
504 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Summers At Orchid Nirvana
Kodagurki, near DevanahalliUnder constructionRERA registeredBuyers’ group openDevan Hills
by Lachman Estates
Price: Price on requestGet brochure & price →
- 40×60, 41×60, 41×61
- 2,064 – 5,725 sq ft plots
- Approved by BIAAPA
- Dec 2031
46 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Devan Hills