Disha Harmony Gardens
2 & 3 BHK apartments by Dishahabitat Shelters LLP · Kyalasanahalli, Hennur Road, Bengaluru
Kyalasanahalli, Hennur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Disha Harmony Gardens at a glance
- Possession (RERA)Dec 2027Karnataka RERA
- Construction67% built · on pace for Aug 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked179 of 247 (72%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroNagawara · 4.9 km (under construction)Open now: Krishnarajapura, 7.7 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 63 min at peak15.55 km straight line · estimate
- Nearest lakeUnnamed lake · 1,046 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Disha Harmony Gardens is a residential project by Dishahabitat Shelters LLP in Kyalasanahalli, Bengaluru with 247 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Disha Harmony Gardens buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Dishahabitat Shelters LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Disha Harmony Gardens buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 818 – 1,109 sq ft
- Towers
- 3
- Floors
- 14
- Total homes
- 247
- Land
- 3.33 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- 67%
Disha Harmony Gardens RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/020125/007341
- Registered on
- 2 Jan 2025
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 179 of 247 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower A | 14 | 1 | 83 |
| Tower B | 14 | 1 | 81 |
| Tower C | 14 | 1 | 83 |
A dash (—) means the filing did not state that value.
Summary in plain English
Disha Harmony Gardens is a residential project by Dishahabitat Shelters LLP in Kyalasanahalli, Bengaluru East, with 247 homes across 3 towers. The project is registered with the Karnataka RERA and has a completion date of 31 December 2027.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 81.5% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Whitefield
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0063/ 24-25 · dated 24 Oct 2024
- Project cost declared to RERA
- ₹168 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Disha Harmony Gardens location and address
- Address
- Ward No 25, Khatha No 1621/8/77/1/77/2 , Sy No 77/1 and 77/2 of Kyalasanahalli Village , Bengaluru East , Bengaluru Urban, Karnataka - 560077
- Village (RERA)
- Kyalasanahalli
- Locality
- Hennur RoadAlso known as Hennur Main Road, Hennur-Bagalur Road, Hennur
- PIN code
- 560077
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.06733, 77.66146
Distances to landmarks
Not found in public records yet: landmarksAbout Hennur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 4.99 km | approx. 20 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.12 km | approx. 49 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.05 km | approx. 57 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 15.55 km | approx. 63 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.11 km | approx. 65 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 24.2 km | approx. 98 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 23Schools and colleges12 schools, 11 colleges, 0 kindergartens
- 2Hospitals and clinics2 hospitals, 0 clinics
Nearest schools and colleges
- Karnataka Rehabilitation Center · 0.3 km
- Brighton School · 0.33 km
- St. Norbert School · 0.71 km
Nearest hospitals and clinics
- Sunshine Hospital · 1.64 km
- Medi Derma Hospital · 1.68 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nagawara (ನಾಗವಾರ)Pink Line metro, under construction4.9 km
- HBR Layout (ಎಚ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction5.17 km
- HRBR Layout (ಎಚ್ಆರ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction5.21 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station7.7 km
- Channasandra (ಚನ್ನಸಂದ್ರ)Nearest railway station6.17 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,046 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,046 m
- Dodda Gubbi Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಗುಬ್ಬಿ ಕೆರೆ)1,296 m
- Kalkere Lake on OpenStreetMap (opens in a new tab) (ಕಾಲ್ಕೆರೆ)1,974 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Disha Harmony Gardens floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Floor plans3 files

14 1st and Typical 2 to 14th Floor PlanFiled 16 Dec 2024 · Full PDF on RERA 
14 Ground Floor PlanFiled 16 Dec 2024 · Full PDF on RERA 
14 Terrace Floor Plan and ElevationFiled 16 Dec 2024 · Full PDF on RERA
Approved building plan3 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
8 Approved PlanFiled 16 Dec 2024 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK 2t | 818 – 881 sq ft | 81 |
| 3 BHK 2t | 959 – 991 sq ft | 83 |
| 3 BHK 3t | 1,106 – 1,109 sq ft | 83 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Disha Harmony Gardens possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK 2T | 81 | 57 | 24 |
| 3 BHK 2T | 83 | 62 | 21 |
| 3 BHK 3T | 83 | 60 | 23 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Dec 2024Project start date given to RERA
- 2 Jan 2025Registered with Karnataka RERA
- 31 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2027 — about 4 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (25% → 67% in 9 months), it would be around May 2027 — about 8 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 67% | 179 of 247 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 59% | 152 of 247 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 43% | 129 of 247 |
| Q3 2025-26to 31 Dec 2025 | 4 Feb 2026 | 25% | 97 of 247 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 67% ÷ 21.9 months (1 Dec 2024 to 30 Sep 2026) = 3.1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 33 ÷ 3.1 = 10.8 months → Aug 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (67% − 25%) ÷ 9 months = 4.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0063/ 24-25 · dated 2024-10-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Deputy Commissioner, Bangalore · No. ALN(P)SR(KH) 65/07-08 and 1 more · dated 2008-12-02 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0063/ 24-25 · dated 24 Oct 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Disha Harmony Gardens RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Dishahabitat Shelters LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACD-5188
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Dishahabitat Shelters LLP’s RERA recordDishahabitat Shelters LLP delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Dishahabitat Shelters LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 375Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 375 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 67% built, 179 of 247 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 59% built, 152 of 247 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 43% built, 129 of 247 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Feb 2026Quarterly update filed for Q3 2025-26: 25% built, 97 of 247 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jan 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/020125/007341); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Dec 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Oct 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0063/ 24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Disha Harmony Gardens FAQs
What is the completion date for Disha Harmony Gardens?
The completion date on RERA is 31 December 2027.
How many homes are in Disha Harmony Gardens?
The project has 247 homes across 3 towers.
What home types are available in Disha Harmony Gardens?
The project offers 2 BHK 2T (81 homes, 818 to 881 sq ft carpet area), 3 BHK 2T (83 homes, 959 to 991 sq ft carpet area), and 3 BHK 3T (83 homes, 1,106 to 1,109 sq ft carpet area).
What is the RERA registration number for Disha Harmony Gardens?
The registration number is PRM/KA/RERA/1251/446/PR/020125/007341.
Where is Disha Harmony Gardens located?
The project is in Kyalasanahalli, Bengaluru East taluk, Bengaluru Urban district, PIN code 560077.
What is the construction progress of Disha Harmony Gardens?
As of the Q2 2026-27 update (quarter ended 30 September 2026), the project was 67% complete.
How many homes have been booked in Disha Harmony Gardens?
As of Q2 2026-27, 179 homes have been booked out of 247.
Are there any RERA complaints against Disha Harmony Gardens or its builder?
There are no RERA complaints against this project or against the builder across all projects on record.
Who is the builder of Disha Harmony Gardens?
The builder is Dishahabitat Shelters LLP, a partnership firm.
How many other projects does the builder have on record?
The builder has 2 projects in the Karnataka RERA Bengaluru records.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Disha Harmony Gardens
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Dishahabitat Shelters LLP? Review the builder.
Reviews of Dishahabitat Shelters LLP by verified buyers
No verified reviews of Dishahabitat Shelters LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Disha Symphony HeightsDishahabitat Shelters LLP | 0.1 km | 128 | Dec 2028 | 19% | 0 | Not collected |
| The Pearl ParadiseSri Sai Infra Projects | 0.4 km | 32 | Dec 2026 | 90% | 0 | Not collected |
| Nava Skanda BellavitaNava Skanda Projects | 0.4 km | 360 | Dec 2029 | 14% | 0 | Not collected |
| Bhoo AabharanaBhoo Developers | 0.6 km | 116 | Apr 2026extended | 100% | 0 | Not collected |
| NCC Urban RetreatNCC Urban Infrastructure Limited | 0.9 km | 50 | Jun 2028 | 45% | 0 | Not collected |
| Nava VrukshaNava Jyothi Shelters Private Limited | 0.9 km | 561 | Dec 2031 | 12% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/020125/007341.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hennur Road
Kyalasanahalli, Hennur RoadUnder constructionRERA registeredBuyers’ group openDisha Symphony Heights
by Dishahabitat Shelters
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK
- 945 – 1,268 sq ft
- Dec 2028
128 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Disha Symphony Heights
Doddagubbi, Hennur RoadUnder constructionRERA registeredBuyers’ group openThe Pearl Paradise
by Sri Sai Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 723 – 980 sq ft
- Dec 2026
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for The Pearl Paradise
Kyalasanahalli, Hennur RoadUnder constructionRERA registeredBuyers’ group openNava Skanda Bellavita
by Nava Skanda
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 884 – 1,326 sq ft
- Dec 2029
360 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Nava Skanda Bellavita