Divine Green Leaf
2 & 3 BHK apartments by M/s GREEN LEAF PROJECTS · Ananthapura, Doddaballapur Road, Bengaluru
Ananthapura, Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Divine Green Leaf at a glance
- Possession (RERA)Dec 2027Karnataka RERA
- Construction83% built · on pace for May 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked94 of 165 (57%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 21 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroYelahanka · 3.19 km (under construction)Open now: Peenya, 10.11 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 69 min at peak17.06 km straight line · estimate
- Nearest lakePuttenahalli Lake · 370 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Divine Green Leaf is a residential project by M/s GREEN LEAF PROJECTS in Ananthapura, Bengaluru with 165 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Divine Green Leaf buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/s GREEN LEAF PROJECTS for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Divine Green Leaf buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 789 – 1,508 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 165
- Land
- 1.84 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- 83%
Divine Green Leaf RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/231123/006428
- Registered on
- 23 Nov 2023
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 94 of 165 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| DIVINE GREEN LEAF | 4 | 1 | 165 |
A dash (—) means the filing did not state that value.
Summary in plain English
Divine Green Leaf is a residential project by M/s GREEN LEAF PROJECTS in Ananthapura, Yelahanka, with 165 homes in 1 tower. The project is registered with Karnataka RERA and is scheduled for completion on 31 December 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 56.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Karur Vysya Bank Ltd., Bangalore Rajarajeshwari Nagar
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/4166/22-23 · dated 22 Jul 2022
- Project cost declared to RERA
- ₹83.57 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Divine Green Leaf location and address
- Address
- PROPOSED COMMERCIAL & RESIDENTIAL APARTMENT BUILDING @ SY NO.60 & 61/3 ,KHATHA NO 878/60/61/3 , ANANTHAPURA VILLAGE, YELAHANKA HOBLI ,BANGALORE NORTH TALUK , Yelahanka , Bengaluru Urban, Karnataka - 560064
- Village (RERA)
- Ananthapura
- Locality
- Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 560064
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.11478, 77.57395
Distances to landmarks
Not found in public records yet: landmarksAbout Doddaballapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 8.93 km | approx. 36 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 15.2 km | approx. 62 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.06 km | approx. 69 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 22.69 km | approx. 92 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.22 km | approx. 98 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 31.08 km | approx. 126 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 23Schools and colleges12 schools, 6 colleges, 5 kindergartens
- 30Hospitals and clinics13 hospitals, 17 clinics
Nearest schools and colleges
- Kendriya Vidyalaya CRPF · 0.41 km
- SB Nursing College · 1.14 km
- Kallavar Public School · 1.22 km
Nearest hospitals and clinics
- KPTCL Hospital Yelahanka · 0.7 km
- Neha Prakash Hospital, Bengaluru Urban · 0.82 km
- Sri Lakshmi Venkateshwara Hospital · 1.08 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction3.19 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction3.92 km
- Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction5.39 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station10.11 km
- Yelahanka Junction (ಯಲಹಂಕ ಜಂಕ್ಷನ್)Nearest railway station2.23 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Puttenahalli Lake, 370 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Puttenahalli Lake on OpenStreetMap (opens in a new tab) (ಪುಟ್ಟೇನಹಳ್ಳಿ ಕೆರೆ)370 m
- Attur Lake on OpenStreetMap (opens in a new tab) (ಅಟ್ಟೂರು ಕೆರೆ)906 m
- Yelahanka Lake on OpenStreetMap (opens in a new tab) (ಯಲಹಂಕ ಕೆರೆ)1,446 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Divine Green Leaf floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans4 files

Approved Building/Plotting PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Basement and Ground floor plan.pdfFull PDF on RERA 
Basement and Ground floor planFiled 15 Nov 2023 · Full PDF on RERA
Elevations

Terrace floor and Elevation plan.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 789 – 795 sq ft | 80 |
| 3 BHK | 970 – 1,400 sq ft | 83 |
| Commercial | 1,508 sq ft | 3 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Divine Green Leaf possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 80 | 50 | 30 |
| 3 BHK | 83 | 44 | 39 |
| COMMERCIAL | 2 | 0 | 2 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 18 Oct 2023Project start date given to RERA
- 23 Nov 2023Registered with Karnataka RERA
- 31 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around May 2027 — about 8 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (65% → 83% in 9 months), it would be around Jun 2027 — about 7 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 13 Oct 2026 | 83% | 94 of 165 |
| Q1 2026-27to 30 Jun 2026 | 13 Jul 2026 | 78% | 93 of 165 |
| Q4 2025-26to 31 Mar 2026 | 24 Jun 2026 | 73% | 93 of 165 |
| Q3 2025-26to 31 Dec 2025 | 19 Feb 2026 | 65% | 63 of 165 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 83% ÷ 35.4 months (18 Oct 2023 to 30 Sep 2026) = 2.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 17 ÷ 2.3 = 7.3 months → May 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (83% − 65%) ÷ 9 months = 2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/4166/22-23 · dated 2022-07-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner, Bangalore · No. ALN (SR) 116-92-93 · dated 1995-08-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/4166/22-23 · dated 22 Jul 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Divine Green Leaf RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00957/2026 | 5 Aug 2026 | Possession delay/No Communication/Breach of agreement(Compensation) | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/s GREEN LEAF PROJECTS
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/s GREEN LEAF PROJECTS’s RERA recordM/s GREEN LEAF PROJECTS delivery record
- 1Projects in Bengaluru on RERA1 approved registration under M/s GREEN LEAF PROJECTS in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 165Homes registeredAs stated in each registrations.
- 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 6.1Complaints per 1,000 homes1 complaints ÷ 165 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2022
- 13 Oct 2026Quarterly update filed for Q2 2026-27: 83% built, 94 of 165 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Aug 2026Complaint 00957/2026 filed with RERA: “Possession delay/No Communication/Breach of agreement(Compensation)” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Quarterly update filed for Q1 2026-27: 78% built, 93 of 165 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jun 2026Quarterly update filed for Q4 2025-26: 73% built, 93 of 165 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Feb 2026Quarterly update filed for Q3 2025-26: 65% built, 63 of 165 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Nov 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/231123/006428); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Oct 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jul 2022Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/CC/4166/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Divine Green Leaf FAQs
What is the RERA registration number for Divine Green Leaf?
The project is registered as PRM/KA/RERA/1251/472/PR/231123/006428, registered on 23 November 2023.
How many homes are in Divine Green Leaf and what types?
The project has 165 homes: 80 two-bedroom homes with carpet area from 789 to 795 sq ft, 83 three-bedroom homes with carpet area from 970 to 1,400 sq ft, and 3 commercial spaces of 1,508 sq ft each.
What is the completion date for Divine Green Leaf?
The project is scheduled for completion on 31 December 2027, as per the RERA record.
What is the current construction progress of Divine Green Leaf?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 83 per cent complete, with 94 homes booked out of 165 homes in the booking table.
Where is Divine Green Leaf located?
The project is located in Ananthapura, Yelahanka taluk, Bengaluru Urban district, with PIN code 560064.
How many RERA complaints are there for Divine Green Leaf?
There is 1 RERA complaint on record for this project.
Who is the builder of Divine Green Leaf?
The project is built by M/s GREEN LEAF PROJECTS, a partnership firm.
How many floors does the building have in Divine Green Leaf?
The single tower in the project has a maximum of 4 floors.
What bank is the escrow account with for Divine Green Leaf?
The escrow bank for this project is Karur Vysya Bank Ltd.
How many other projects does the builder have on RERA records?
M/s GREEN LEAF PROJECTS has 2 projects on record in the Bengaluru RERA register, with 1 complaint filed against the builder across all projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Divine Green Leaf
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/s GREEN LEAF PROJECTS? Review the builder.
Reviews of M/s GREEN LEAF PROJECTS by verified buyers
No verified reviews of M/s GREEN LEAF PROJECTS yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| classique mayflowerSanjith Naik | 0.3 km | 30 | Mar 2022extended | — | 0 | Not collected |
| Sri Balaji SereneSri Balaji Structures | 0.8 km | 376 | Dec 2026 | 85% | 0 | Not collected |
| Century Kindle Phase 1Hebbal Properties Private Limited | 1 km | 458 | Mar 2031 | 17% | 0 | Not collected |
| Affinity GardeniaAffinity Properties LLP | 1 km | 48 | Dec 2026 | 95% | 0 | Not collected |
| Dhara KalpaDhara Home Spaces | 1.4 km | 64 | Mar 2029 | — | 0 | Not collected |
| Ajmera MarinaAjmera Housing Corporation Bangalore | 1.7 km | 330 | Dec 2028 | 35% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/231123/006428.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Doddaballapur Road
Puttenahalli, Doddaballapur RoadReady to moveRERA registeredBuyers’ group openclassique mayflower
by Sanjith Naik
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 812 – 9,304 sq ft
- Mar 2022 (extended)
30 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for classique mayflower
Attur, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openSri Balaji Serene
by Sri Balaji Structures
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 643 – 1,437 sq ft
- Dec 2026
376 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Balaji Serene
Attur, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openCentury Kindle Phase 1
by Hebbal Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 723 – 1,873 sq ft
- Mar 2031
458 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Century Kindle Phase 1