Elite Homes
2 & 3 BHK apartments by Aadhava Developers · K Narayanapura, Thanisandra, Bengaluru
K Narayanapura, Thanisandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Jun 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Elite Homes at a glance
- Possession (RERA)Jun 2026 Date passedKarnataka RERA
- Construction93% built · on pace for Jun 2026RERA filing to 31 Mar 2026; estimate from average pace
- Homes booked25 of 60 (42%)RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroNagawara · 2.65 km (under construction)Open now: Benniganahalli, 7.82 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 69 min at peak17.1 km straight line · estimate
- Nearest lakeNagaraesh Nagenahalli Lake · 1,608 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Elite Homes is a residential project by Aadhava Developers in K Narayanapura, Bengaluru with 60 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Elite Homes buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Aadhava Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Elite Homes buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 637 – 1,034 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 60
- Land
- 0.66 acres
- Possession (RERA)
- Jun 2026
- Built (RERA update)
- 93%
Elite Homes RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/300924/007102
- Registered on
- 30 Sep 2024
- Promised completion
- 30 Jun 2026
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 25 of 60 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower | 3 | 0 | 60 |
A dash (—) means the filing did not state that value.
Summary in plain English
Elite Homes is a residential project by Aadhava Developers in K Narayanapura, Bengaluru East, with 60 homes in one 3-storey tower. The project is registered with RERA and scheduled for completion on 30 June 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 45.6% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, HBR LAYOUT
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/1214/23-24 · dated 10 Jul 2023
- Project cost declared to RERA
- ₹39.26 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Community Hall
- Gym
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Elite Homes location and address
- Address
- Sy no 20, Katha No - 94/20/2,3 , K Narayanapura Village, K R Puram Hobli, Ward No 25 , Bengaluru East , Bengaluru Urban, Karnataka - 560077
- Village (RERA)
- K Narayanapura
- Locality
- ThanisandraAlso known as Thanisandra Main Road
- PIN code
- 560077
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.06072, 77.63902
Distances to landmarks
Not found in public records yet: landmarksAbout Thanisandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 2.5 km | approx. 10 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 11.87 km | approx. 48 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.43 km | approx. 54 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.91 km | approx. 64 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.1 km | approx. 69 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 23.63 km | approx. 96 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 40Schools and colleges27 schools, 9 colleges, 4 kindergartens
- 10Hospitals and clinics7 hospitals, 3 clinics
Nearest schools and colleges
- BBMP School · 0.37 km
- Government School · 0.43 km
- Little Lions · 0.46 km
Nearest hospitals and clinics
- K Narayanapura Urban Primary Health Centre · 0.45 km
- Bangalore Baptist Clinic · 0.67 km
- Bangalore Prime Hospital · 0.68 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nagawara (ನಾಗವಾರ)Pink Line metro, under construction2.65 km
- Veerannapalya (ವೀರಣ್ಣಪಾಳ್ಯ)Blue Line metro, under construction3.16 km
- HBR Layout (ಎಚ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction3.29 km
- Benniganahalli (ಬೆನ್ನಿಗಾನಹಳ್ಳಿ)Open now — nearest operating metro station7.82 km
- Channasandra (ಚನ್ನಸಂದ್ರ)Nearest railway station6.01 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Nagaraesh Nagenahalli Lake, 1,608 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Nagaraesh Nagenahalli Lake on OpenStreetMap (opens in a new tab) (ನಾಗೇನಹಳ್ಳಿ ಕೆರೆ)1,608 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,787 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Elite Homes home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan2 files

5 CDP Location Demarcation - Self attestedFiled 20 Sep 2024 · Full PDF on RERA 
Village Map Location Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 637 – 802 sq ft | 28 |
| 3 BHK | 659 – 1,034 sq ft | 32 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Elite Homes possession date and construction status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-15.
Units sold and unsold, from RERA (Q4 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 28 | 8 | 20 |
| 3 BHK | 32 | 17 | 15 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 25 Jul 2023Project start date given to RERA
- 30 Sep 2024Registered with Karnataka RERA
- 30 Jun 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2026 — about 1 month before the completion date on RERA (30 Jun 2026).
At the pace between the 2 quarterly filings we have (92% → 93% in 3 months), it would be around Dec 2027 — about 18 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 93% | 25 of 60 |
| Q3 2025-26to 31 Dec 2025 | 21 Feb 2026 | 92% | 13 of 60 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 93% ÷ 32.2 months (25 Jul 2023 to 31 Mar 2026) = 2.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 7 ÷ 2.9 = 2.4 months → Jun 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (93% − 92%) ÷ 3 months = 0.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/1214/23-24 · dated 2023-07-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner, Bangalore · No. ALN(KRPH)SR:21/2016-17 · dated 2017-03-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/1214/23-24 · dated 10 Jul 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Elite Homes RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Aadhava Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Aadhava Developers’s RERA recordAadhava Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Aadhava Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 60Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 60 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2023
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 93% built, 25 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Feb 2026Quarterly update filed for Q3 2025-26: 92% built, 13 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/300924/007102); completion date 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jul 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2023Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. PRJ/1214/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Elite Homes FAQs
What is the completion date for Elite Homes?
The RERA registration shows a completion date of 30 June 2026.
How many homes are in Elite Homes?
Elite Homes has 60 homes: 32 three-bedroom homes and 28 two-bedroom homes.
What are the carpet areas for Elite Homes?
The 3 BHK homes range from 659 to 1,034 sq ft, and the 2 BHK homes range from 637 to 802 sq ft.
What is the RERA registration number for Elite Homes?
The RERA registration number is PRM/KA/RERA/1251/446/PR/300924/007102, registered on 30 September 2024.
How much of Elite Homes is constructed?
As of the latest quarterly update for Q4 2025-26 (ended 31 March 2026), the project is 93% complete.
How many homes are booked in Elite Homes?
As of Q4 2025-26, 25 homes are booked out of the 60 homes in the project.
Are there any RERA complaints on Elite Homes?
No RERA complaints have been filed on this project.
Where is Elite Homes located?
Elite Homes is in K Narayanapura, Bengaluru East taluk, Bengaluru Urban district, PIN code 560077.
What is the land area of Elite Homes?
The land area is 2,655 sq m.
What is Aadhava Developers' track record with RERA?
Aadhava Developers has one project in the RERA records with no complaints filed against the builder.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Elite Homes
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Aadhava Developers? Review the builder.
Reviews of Aadhava Developers by verified buyers
No verified reviews of Aadhava Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Baldota SummitBaldota Builders And Developers | 0.1 km | 77 | Mar 2030 | 18% | 0 | Not collected |
| Pristine GrovePristine Homes | 0.3 km | 140 | Dec 2025 | 100% | 0 | Not collected |
| BRR North Excellency Phase IBRR Hallmark Developers LLP | 0.5 km | 104 | Dec 2029 | 46% | 0 | Not collected |
| Dreamville HomePromax Properties | 0.9 km | 24 | Dec 2026 | — | 2 | Not collected |
| Sri Sai Bharath TowersSri Bharath Developrs | 0.9 km | 76 | Dec 2029 | 80% | 0 | Not collected |
| Casagrand KeatswayCasa Grande Garden City Builders Pvt Ltd | 1.3 km | 286 | Nov 2026 | 95% | 3 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/300924/007102.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Thanisandra
K Narayanapura, ThanisandraUnder constructionRERA registeredBuyers’ group openBaldota Summit
by Baldota Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 844 – 1,061 sq ft
- Mar 2030
77 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Baldota Summit
K Narayanapura, ThanisandraReady to moveRERA registeredBuyers’ group openPristine Grove
by Pristine Homes
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK, 5 BHK
- 675 – 1,302 sq ft
- Dec 2025
140 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pristine Grove
ThanisandraUnder constructionRERA registeredBuyers’ group openBRR North Excellency Phase I
by BRR Hallmark
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 787 – 1,088 sq ft
- Dec 2029
104 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for BRR North Excellency Phase I