Garuda Grand
2 & 3 BHK apartments by Balaji Buildres · Hoodi, near Mahadevapura, Bengaluru
Hoodi, near Mahadevapura, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Garuda Grand at a glance
- Possession (RERA)Mar 2028 ExtendedWas Apr 2025 · Karnataka RERA
- Construction87% built · on pace for Apr 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked56 of 136 (41%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroHoodi · 1.69 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 91 min at peak22.46 km straight line · estimate
- Nearest lakeKodigehalli Lake · 256 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Garuda Grand is a residential project by Balaji Buildres in Hoodi, Bengaluru with 136 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2028.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Garuda Grand buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Balaji Buildres for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Garuda Grand buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 673 – 1,080 sq ft
- Towers
- 2
- Floors
- 3
- Total homes
- 136
- Land
- 1.75 acres
- Possession (extended)
- Mar 2028
- Built (RERA update)
- 87%
Garuda Grand RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/010923/006217
- Registered on
- 1 Sep 2023
- Promised completion
- 30 Apr 2025
- Extended to
- 31 Mar 2028
- RERA status
- Under construction
- Homes booked
- 56 of 136 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| BLOCK A | 3 | 1 | 68 |
| BLOCK B | 3 | 1 | 68 |
A dash (—) means the filing did not state that value.
Summary in plain English
Garuda Grand is a residential project by Balaji Buildres in Hoodi, Bengaluru North, with 136 homes across 2 towers. The project has a completion date of 31 March 2028 on the RERA record, following extensions from the original date of 30 April 2025.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 55.3% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, KR PURAM
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0527/22-23 · dated 31 Oct 2022
- Project cost declared to RERA
- ₹78.15 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Garuda Grand location and address
- Address
- Sy.No.99/3,100 and 103/1 Vijay Vihari Layout , Kodigehalli Hoodi Main Road ,Hoodi Village, KR Puram Hobli , Bengaluru North , Bengaluru Urban, Karnataka - 560048
- Village (RERA)
- Hoodi
- Locality
- Near Mahadevapura
- PIN code
- 560048
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.99948, 77.72246
Distances to landmarks
Not found in public records yet: landmarksAbout Hoodi
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 2.12 km | approx. 9 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 9.54 km | approx. 39 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.36 km | approx. 50 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.74 km | approx. 68 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.78 km | approx. 72 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 22.46 km | approx. 91 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 22Schools and colleges14 schools, 7 colleges, 1 kindergartens
- 21Hospitals and clinics11 hospitals, 10 clinics
Nearest schools and colleges
- Hoodi Primary School · 0.61 km
- Diya Academy of Learning · 0.62 km
- Government PUC · 0.64 km
Nearest hospitals and clinics
- Saptagiri Health Care · 0.84 km
- Kids Health Link · 1.12 km
- Sri Krishna Poly Clinic · 1.19 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hoodi (ಹೂಡಿ)Open now — nearest operating metro station1.69 km
- Hoodi Nearest railway station0.53 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kodigehalli Lake, 256 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kodigehalli Lake on OpenStreetMap (opens in a new tab) (ಕೊಡಿಗೇಹಳ್ಳಿ ಕೆರೆ)256 m
- Hoodi Lake on OpenStreetMap (opens in a new tab) (ಹೂಡಿ ಕೆರೆ)490 m
- Basavanapura Kere on OpenStreetMap (opens in a new tab) (ಬಸವನಪುರ ಕೆರೆ)1,444 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Garuda Grand home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 673 – 944 sq ft | 92 |
| 3 BHK | 727 – 1,080 sq ft | 44 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Garuda Grand possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 96 | 40 | 56 |
| 3 BHK | 40 | 16 | 24 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 25 Apr 2023Project start date given to RERA
- 1 Sep 2023Registered with Karnataka RERA
- 30 Apr 2025Completion date given at registration
- 30 Apr 2026Section 6 Extension: completion date moved to this date
- 31 Mar 2028Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2027 — about 12 months before the completion date on RERA (31 Mar 2028).
At the pace between the 4 quarterly filings we have (82% → 87% in 9 months), it would be around Sep 2028 — about 5 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 87% | 56 of 136 |
| Q1 2026-27to 30 Jun 2026 | 11 Jul 2026 | 86% | 52 of 136 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 83% | 52 of 136 |
| Q3 2025-26to 31 Dec 2025 | 20 Mar 2026 | 82% | 52 of 136 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 87% ÷ 41.2 months (25 Apr 2023 to 30 Sep 2026) = 2.1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 13 ÷ 2.1 = 6.2 months → Apr 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (87% − 82%) ÷ 9 months = 0.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0527/22-23 · dated 2022-10-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner, Bangalore District · No. ALN (EKHW) SR:50/2015-16 · dated 2016-08-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0527/22-23 · dated 31 Oct 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Garuda Grand RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Balaji Buildres
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Balaji Buildres’s RERA recordBalaji Buildres delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Balaji Buildres in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 136Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 136 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2022
- 31 Mar 2028Completion date extended to 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 87% built, 56 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jul 2026Quarterly update filed for Q1 2026-27: 86% built, 52 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 83% built, 52 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Mar 2026Quarterly update filed for Q3 2025-26: 82% built, 52 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/010923/006217); completion date 30 Apr 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Apr 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Oct 2022Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Ad.Com./MDP/0527/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Garuda Grand FAQs
What is the completion date for Garuda Grand?
The current completion date on RERA is 31 March 2028. The project was originally scheduled for 30 April 2025 but received extensions under Section 6 and a further extension.
How many homes are in Garuda Grand?
Garuda Grand has 136 homes across 2 towers with a maximum of 3 floors.
What home types are available in Garuda Grand?
The project offers 2 BHK homes (92 units, carpet area 673 to 944 sq ft) and 3 BHK homes (44 units, carpet area 727 to 1,080 sq ft).
What is the RERA registration number for Garuda Grand?
The RERA registration number is PRM/KA/RERA/1251/309/PR/010923/006217, registered on 1 September 2023.
What is the construction progress of Garuda Grand?
As of Q2 2026-27 (ended 30 September 2026), the project is 87% complete.
How many homes are booked in Garuda Grand?
As of Q2 2026-27, 56 homes are booked out of 136 homes.
Where is Garuda Grand located?
Garuda Grand is located in Hoodi, Bengaluru North taluk, Bengaluru Urban district, with PIN code 560048.
Are there any RERA complaints for Garuda Grand?
No RERA complaints have been filed on this project.
Who is the builder of Garuda Grand?
The builder is Balaji Buildres, a Partnership Firm.
What is the land area of Garuda Grand?
The land area is 7,083 sq m.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Garuda Grand
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Balaji Buildres? Review the builder.
Reviews of Balaji Buildres by verified buyers
No verified reviews of Balaji Buildres yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Jai Fortune SquareJai Builders | 0.1 km | 136 | Dec 2025 | — | 0 | Not collected |
| Jai SignatureJai Shelters , H.A.Venugopal & 10 Others | 0.1 km | 50 | Mar 2028 | — | 0 | Not collected |
| Vikyath ElegantVikyath Properties Pvt Ltd | 0.3 km | 80 | Dec 2025 | — | 0 | Not collected |
| Sri Balaji Rose WoodsSri Balaji Ventures | 0.5 km | 449 | Dec 2025 | — | 0 | Not collected |
| 2g TULATogetherments Infra Pvt Ltd | 0.5 km | 186 | Dec 2027extended | 78% | 0 | Not collected |
| Aryav WindfieldsAryav Constructions | 0.6 km | 97 | Dec 2027 | 65% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/010923/006217.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Hoodi, near MahadevapuraUnder constructionRERA registeredBuyers’ group openJai Fortune Square
by Jai Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 653 – 1,143 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 136 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jai Fortune Square
Hoodi, near MahadevapuraUnder constructionRERA registeredBuyers’ group openJai Signature
by Jai Shelters , H.A.Venugopal & 10 Others
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 418 – 723 sq ft
- Mar 2028
50 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jai Signature
Hoodi, MahadevapuraReady to moveRERA registeredBuyers’ group openVikyath Elegant
by Vikyath Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 649 – 1,103 sq ft
- Dec 2025
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vikyath Elegant