Godrej Tiara
3 & 4 BHK apartments by Godrej Properties · Tumkur Road, Bengaluru
Tumkur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- apartments
Listed price: From ₹3.5 Cr
Exterior render of the tower at dusk (artist's impression) Artist’s impression · © Godrej Properties Limited · Source ↗ (opens in a new tab)
Godrej Tiara at a glance
- Price from₹3.5 Cr · 3 BHKBuilder’s website · as on 23 Oct 2026
- All-in from₹3.94 Cr · 3 BHKBuilder price + GST, stamp duty, registration · 23 Oct 2026
- Possession (RERA)May 2030Karnataka RERA
- Construction26% built · on pace for Jul 2030 1 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked338 of 346 (98%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 18 Oct 2026
- Builder on-time record4 of 4 on time All on timeCompleted projects: OC date vs promised date
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroGoraguntepalya · 0.4 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 107 min at peak26.35 km straight line · estimate
- Nearest lakeMathikere Lake · 1,358 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Godrej Tiara is a Godrej Properties apartment project on Tumkur Main Road at Goraguntepalya, Yeshwanthpur. It was registered with Karnataka RERA on 11 June 2025 (PRM/KA/RERA/1251/309/PR/110625/007817) with promised completion on 31 May 2030. It has 346 homes (260 3 BHK, 86 4 BHK) in 3 towers on about 4.93 acres. The RERA update for June 2026 shows 15% construction and 344 homes booked. The developer's page listed prices from Rs 3.5 crore on 4 October 2026.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Godrej Tiara buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Godrej Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Godrej Tiara buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 1,251 – 1,771 sq ft
- Towers
- 3
- Floors
- 30
- Total homes
- 346
- Land
- 4.93 acres
- Possession (RERA)
- May 2030
- Built (RERA update)
- 26%
Godrej Tiara RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/110625/007817
- Registered on
- 11 Jun 2025
- Promised completion
- 31 May 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 338 of 346 as on
- Price
- From ₹3.5 Cr as on
- Project type
- Apartments
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower A | 30 | 3 | 114 |
| Tower B | 30 | 3 | 116 |
| Tower C | 30 | 3 | 116 |
A dash (—) means the filing did not state that value.
Godrej Tiara price list
| Home type | Size | Price | ₹ per sq ft | Source |
|---|---|---|---|---|
| 3 BHK | —unknown | From ₹3.5 Cronwards | — | Source (godrejproperties.com) (opens in a new tab) |
| 4.5 BHK | —unknown | From ₹5.99 Cronwards | — | Source (godrejproperties.com) (opens in a new tab) |
As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.
Price per sq ft vs projects within 5 km
The builder’s published prices work out to about ₹23,400 – ₹28,000 per sq ft of carpet area.
| Home type | Builder price | Carpet area (RERA) | ₹ per sq ft carpet |
|---|---|---|---|
| 3 BHK | from ₹3.5 Crseen 23 Oct 2026 | 1,251 – 1,498 sq ft | ₹23,400 – ₹28,000 |
Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (godrejproperties.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (godrejproperties.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Price history
One snapshot so far: the builder’s “onwards” prices seen on 23 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.
| Seen on | Where | Prices |
|---|---|---|
| 23 Oct 2026 | Builder’s website Source (godrejproperties.com) (opens in a new tab) | 3 BHK from ₹3.5 Cr · 4.5 BHK from ₹5.99 Cr |
Summary in plain English
Godrej Tiara is a residential project by Godrej Properties Limited in Bengaluru North with 346 homes across 3 towers. The project has 4 BHK and 3 BHK homes with carpet areas from 1,251 to 1,771 sq ft, registered with completion date 31 May 2030.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 83.5% of land
- Water and power
- RERA lists the water source as borewell and BWSSB. The BWSSB water/sewerage NOC and the BESCOM electricity NOC are marked approved in the Q1 2026-27 RERA update. Power backup is not stated.
- Home loans: approved banks
- Central Bank of India, Union Bank of India, Bank of India, Bank of Baroda, Citi Bank, Kotak Mahindra Bank, Axis Bank, State Bank of India, ICICI Bank, HDFC Bank
- Payment plans
- Construction-linked — Payments in slabs as construction progresses; Housiey says a loan of up to 90% is possible Source (housiey.com) (opens in a new tab)
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, M G Road
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0027/24-25 · dated 4 Jun 2025
- Project cost declared to RERA
- ₹1000 Cr
- Estimated monthly maintenance, 3 BHK (Housiey estimate)
- ₹12,700
- Estimated monthly maintenance, 3 BHK + staff / '3.5 BHK' (Housiey estimate)
- ₹15,100
- Estimated monthly maintenance, 4 BHK + staff / '4.5 BHK' (Housiey estimate)
- ₹17,600
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (housiey.com) (opens in a new tab)
Amenities
- Swimming pool
- Kids pool
- Infinity pool
- Rooftop clubhouse
- Community clubhouse
- Banquet hall
- Gymnasium
- Dance studio
- Squash court
- Badminton court
- Paddle court
- Mini soccer
- Cricket practice net
- Calisthenics court
- Yoga zone
- Yoga and meditation deck
- Steam room
- Sauna
- Jacuzzi
- Massage room
- Salon
- Cafe
- Library
- Business lounge
- Private dining
- Board games room
- Cigar room
- Rooftop cinema
- Kids zone
- Children's play area
- Toddlers' play area
- Pet park
- Event lawn
- Amphitheatre
- Water body
- Reflexology path
- Elevated walkway
- Sculpture court
As listed by the builder; we have not visited the site.
Sources:Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab)
Specifications and materials
| Towers | Tower A 114 homes, Towers B and C 116 homes each; each tower has 3 basements and 30 floors and is 102.85 m tall; homes on floors 1 to 29 (4 per floor) | Source (rera.karnataka.gov.in) (opens in a new tab) |
|---|---|---|
| Parking | 637 covered parking spaces and no open parking, per the RERA plan details | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Site area and coverage | Land 19,964 sq m (about 4.93 acres); building footprint 3,297 sq m; RERA 'total open area' 16,667 sq m. Open-space % here = 16,667 / 19,964 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| FAR sanctioned | 3.5 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 3 BHK layout | RERA carpet 116.20 sq m (1,250.87 sq ft), balcony 16.94 sq m, utility about 3.8 sq m, sale area 2,120 sq ft; has a private vestibule | Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab) |
| 3 BHK + staff layout | RERA carpet 139.08 sq m (1,497.13 sq ft), balcony 19.06 sq m, utility 5.09 sq m, sale area 2,527 sq ft; includes staff room and staff toilet and an office/puja room | Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab) |
| 4 BHK + staff layout | RERA carpet 164.48 sq m (1,770.53 sq ft), balcony 19.94 sq m, utility 5.55 sq m, sale area 2,941 sq ft; includes staff room, staff toilet and an office | Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab) |
| Internal fittings | Housiey lists vitrified tiles, branded fittings, kitchen platform, stainless steel sink and CCTV | Source (housiey.com) (opens in a new tab) |
Godrej Tiara location and address
- Address
- Municipal No. 8/9, CTS No. 473 & 474, Tumkur Main Road, Goraguntepalya, Yeshwanthpur, Bengaluru 560022
- Village (RERA)
- Yeshwanthpur
- Locality
- Tumkur RoadAlso known as Tumakuru Road, Tumkur Main Road, NH 48 (Tumkur Road)
- PIN code
- 560022
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.02853, 77.53721
Distances to landmarks
- People Tree HospitalHospital0.1 km
- Goraguntepalya (listed under metro in brochure)Metro0.15 km
- Sparsh HospitalHospital0.55 km
- National Public SchoolSchool1 km
- PVR Vaishnavi Sapphire MallMall1.2 km
- Yeshwantpur Metro StationMetro1.3 km
- Peenya Metro StationMetro1.5 km
- Manipal HospitalHospital2.5 km
- Orion MallMall2.9 km
- Brigade SchoolSchool3 km
- Indian Institute of ScienceSchool4.1 km
- Lulu MallMall7.3 km
Straight-line distances (Road distances copied from the developer's brochure, which says they are 'as per Google Maps' (not straight-line). Source: https://gplwebsitecdnblob.blob.core.windows.net/godrej-cdn/Files/godrej-tiara-opdoc-MFQpDExAwZwrqzx0UKks.pdf), not by road — travel distance will be longer.
About Tumkur Road
- Yeshwanthpur Railway Station is about 1.5 km away by road, per the brochure Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab)
- KSR Bengaluru City railway station is about 8 km away and Cantonment station about 9.5 km, per the brochure Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab)
- The brochure says the site is next to the Tumkur Road highway and the Outer Ring Road Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab)
- The site address in the brochure puts the plot in BBMP Ward No. 38 Source (gplwebsitecdnblob.blob.core.windows.net) (opens in a new tab)
- RERA lists 3 land parcels (about 3,902, 9,755 and 6,503 sq m), all bought by Godrej Properties in 2023, with BBMP A-khatas, and answers 'No' to land litigation Source (rera.karnataka.gov.in) (opens in a new tab)
- RERA boundary schedule: Tumkur Road to the north and Outer Ring Road to the west Source (rera.karnataka.gov.in) (opens in a new tab)
Commute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 6.61 km | approx. 27 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 9.22 km | approx. 37 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 19.48 km | approx. 79 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 22.2 km | approx. 90 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 24.23 km | approx. 98 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 26.35 km | approx. 107 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 20Schools and colleges9 schools, 10 colleges, 1 kindergartens
- 16Hospitals and clinics15 hospitals, 1 clinics
Nearest schools and colleges
- Central Manufacturing Technology Institute · 0.53 km
- National Institute of Design - NID R&D Campus · 0.74 km
- National Public School Yeshwantpur · 0.8 km
Nearest hospitals and clinics
- People Tree Hospitals · 0.22 km
- KLE Dental College · 0.28 km
- Mysore Hospital · 0.29 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Goraguntepalya (ಗೊರಗುಂಟೆಪಾಳ್ಯ)Open now — nearest operating metro station0.4 km
- Yesvantpur Junction (ಯಶವಂತಪುರ ಜಂಕ್ಷನ್)Nearest railway station1.56 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Mathikere Lake, 1,358 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Mathikere Lake on OpenStreetMap (opens in a new tab) (ಮತ್ತಿಕೆರೆ)1,358 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Godrej Tiara floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure9 pages

BrochureFull PDF on RERA 






Approved building plan10 pages

Approved Building PlanFull PDF on RERA
Approved layout plan

CDP map Demarcation.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,251 – 1,498 sq ft | 260 |
| 4 BHK | 1,771 sq ft | 86 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
(opens full size in a new tab)Unit plan: 3 BHK, type 01 © Godrej Properties Limited · Source ↗ (opens in a new tab)
(opens full size in a new tab)Unit plan: 4 BHK with staff room © Godrej Properties Limited · Source ↗ (opens in a new tab)
Godrej Tiara possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 260 | 257 | 3 |
| 4 BHK | 86 | 81 | 5 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 29 Feb 2024AAI height clearance NOC issued
- 5 Jul 2024Fire NOC issued
- 29 Aug 2024Environmental clearance issued by SEIAA Karnataka
- 29 Oct 2024KSPCB consent for establishment issued
- 4 Jun 2025BBMP building plan approved; project start date in RERA
- 11 Jun 2025Karnataka RERA registration approved
- 16 Jul 2025Earthwork actually started (finished 10 Dec 2025), per the RERA quarterly update
- 22 Aug 2025Construction shown as 1% complete on Housiey (older, non-RERA figure)
- 9 Jun 2026RCC frame work started, per the RERA quarterly update
- 30 Jun 2026RERA Q1 2026-27 update (filed 10 Jul 2026): project 15% complete (Tower A 9%, B 9%, C 13%); 344 of 346 homes booked
- 31 May 2029Possession 'by May 2029' mentioned in the developer page's description text (earlier than the RERA date)
- 31 May 2030Promised completion date in the RERA record
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2030 — about 1 month after the completion date on RERA (31 May 2030).
At the pace between the 4 quarterly filings we have (4% → 26% in 9 months), it would be around Apr 2029 — about 14 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 26% | 338 of 346 |
| Q1 2026-27to 30 Jun 2026 | 10 Jul 2026 | 15% | 344 of 346 |
| Q4 2025-26to 31 Mar 2026 | 13 Apr 2026 | 9% | 344 of 346 |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 4% | 344 of 346 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 26% ÷ 15.9 months (4 Jun 2025 to 30 Sep 2026) = 1.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 74 ÷ 1.6 = 45.2 months → Jul 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (26% − 4%) ÷ 9 months = 2.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0027/24-25 · dated 2025-06-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0027/24-25 · dated 4 Jun 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Godrej Tiara RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00063/2026 | 29 Jan 2026 | refund of flat a2401 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Godrej Properties
- Founded
- 1990
- Headquarters
- Mumbai
- Bengaluru projects
- 18
- Delivered on time
- 4 of 4
- RERA complaints
- 65
- Court cases listed
- 4
Godrej Properties Limited (CIN L74120MH1985PLC035308) is a listed developer based in Mumbai; its website says it was established in 1990. Karnataka RERA records show 18 Godrej-branded Bengaluru projects, some registered by group companies or partner LLPs; in four completed projects the occupancy certificate came before the promised date. K-RERA lists 65 complaints against Godrej Properties as promoter (31 disposed, 34 pending or posted for orders as of 4 October 2026), most about Godrej Woodland and Godrej Aqua. Consumer commissions also record Bengaluru buyer disputes.
Godrej Properties’s full recordGodrej Properties delivery record
- 20Projects in Bengaluru on RERA26 approved registrations under Godrej Properties Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 21,984Homes and plots registeredAs stated in each registrations.
- 65RERA complaints33 open, 32 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 3Complaints per 1,000 homes and plots65 complaints ÷ 21,984 homes and plots in its 26 registrations on Karnataka RERA in Bengaluru.
- 4Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
65 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Handovers we checked by hand
| Project | Promised (at registration) | OC | Result | Source |
|---|---|---|---|---|
| Godrej Eternity | 15 Oct 2020 | 16 Dec 2019 | On time | Source (aurumproptech.in) (opens in a new tab) |
| Life+ at Godrej Eternity | 30 Jul 2023 | 1 Jun 2022 | On time | Source (aurumproptech.in) (opens in a new tab) |
| Godrej Aqua | 13 Oct 2024 | 3 Jan 2022 | On time | Source (aurumproptech.in) (opens in a new tab) |
| Godrej Nurture | 30 Dec 2025 | 28 Dec 2022 | On time | Source (aurumproptech.in) (opens in a new tab) |
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
In the news
- 2 Jan 2024Godrej Properties said it bought about 4 acres in Yeshwanthpur next to NH-75 for premium flats, with room to add 1 more acre (the article does not name the project) — Outlook Business Read (outlookbusiness.com) (opens in a new tab)
What’s changed since Feb 2024
- 23 Oct 2026Builder’s price list seen: 3 BHK from ₹3.5 Cr, 4.5 BHK from ₹5.99 Cr Source (godrejproperties.com) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 26% built, 338 of 346 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2026Quarterly update filed for Q1 2026-27: 15% built, 344 of 346 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jun 2026RCC frame work started, per the RERA quarterly update (from our research file)
- 13 Apr 2026Quarterly update filed for Q4 2025-26: 9% built, 344 of 346 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jan 2026Complaint 00063/2026 filed with RERA: “refund of flat a2401” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 4% built, 344 of 346 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Aug 2025Construction shown as 1% complete on Housiey (older, non-RERA figure) (from our research file)
- 16 Jul 2025Earthwork actually started (finished 10 Dec 2025), per the RERA quarterly update (from our research file)
- 11 Jun 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/110625/007817); completion date 31 May 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jun 2025Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDSOUTH/0027/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jun 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Oct 2024KSPCB consent for establishment issued (from our research file)
- 29 Aug 2024Environmental clearance issued by SEIAA Karnataka (from our research file)
- 5 Jul 2024Fire NOC issued (from our research file)
- 29 Feb 2024AAI height clearance NOC issued (from our research file)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- ₹2,42,991
- Down payment
- ₹70,00,000
- Loan amount
- ₹2,80,00,000
- Total interest
- ₹3,03,17,721
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sources:Source (godrejproperties.com) (opens in a new tab)How we calculate this
Godrej Tiara FAQs
What is the RERA number of Godrej Tiara?
PRM/KA/RERA/1251/309/PR/110625/007817. It was approved by Karnataka RERA on 11 June 2025.
When is possession of Godrej Tiara?
The RERA record gives a promised completion date of 31 May 2030. Text on the developer's page mentions possession by May 2029, but the date you can hold the builder to is the RERA one.
How far along is construction?
The RERA quarterly update for the quarter ending 30 June 2026 (filed 10 July 2026) shows the project 15% complete: Tower A 9%, Tower B 9% and Tower C 13%. Earthwork finished in December 2025 and RCC frame work started on 9 June 2026.
What is the price of a flat in Godrej Tiara?
On 4 October 2026 the developer's page listed 3 and 4 BHK homes from Rs 3.5 crore. We found no published upper price.
How many flats are still available?
In the RERA update for the quarter ending 30 June 2026, 344 of 346 homes were booked, leaving 2 (both in Tower A).
Does Godrej Tiara have environmental and building approvals?
Yes. BBMP approved the building plan on 4 June 2025 (LP No. BBMP/Addl.Dir/JDSOUTH/0027/24-25), SEIAA Karnataka issued environmental clearance on 29 August 2024, and the fire NOC is dated 5 July 2024.
What sizes are available?
RERA lists 260 3 BHK and 86 4 BHK homes. Brochure carpet areas: 3 BHK 1,250.87 sq ft, 3 BHK + staff room 1,497.13 sq ft, 4 BHK + staff room 1,770.53 sq ft (sale areas 2,120, 2,527 and 2,941 sq ft).
How big is the project?
The RERA record lists 346 homes in 3 towers on 19,964 sq m (about 4.93 acres). There are 260 3 BHK and 86 4 BHK homes, four per floor on floors 1 to 29, and 637 covered parking spaces.
Are there RERA complaints or court cases against Godrej Tiara?
One RERA complaint (00063/2026, filed 29 January 2026) asks for a refund for a booked flat. On 4 October 2026 it was under enquiry. No court case naming the project was found, and RERA answers 'No' to land litigation.
Which metro stations are nearby?
The brochure gives road distances of 1.3 km to Yeshwantpur metro station and 1.5 km to Peenya metro station. It also lists Goraguntepalya at 0.15 km.
Which banks give home loans for this project?
Housiey lists Central Bank of India, Union Bank of India, Bank of India, Bank of Baroda, Citi Bank, Kotak Mahindra Bank, Axis Bank, SBI, ICICI Bank and HDFC Bank. It also lists a construction-linked payment plan with loans of up to 90%.
What will maintenance cost?
Housiey estimates about Rs 12,700 a month for a 3 BHK, Rs 15,100 for the 3 BHK + staff and Rs 17,600 for the 4 BHK + staff. The final charges are set at possession.
More questions, answered from the RERA record
What is the completion date for Godrej Tiara?
The completion date on RERA is 31 May 2030.
How many homes are in Godrej Tiara?
There are 346 homes in the project across 3 towers.
What home types are available in Godrej Tiara?
The project has 86 four-bedroom homes (1,771 sq ft carpet area) and 260 three-bedroom homes (1,251 to 1,498 sq ft carpet area).
What is the RERA registration number for Godrej Tiara?
The registration number is PRM/KA/RERA/1251/309/PR/110625/007817, registered on 11 June 2025.
What is the construction progress of Godrej Tiara?
As of 30 September 2026, construction is 26% complete with 338 homes booked out of 346.
Where is Godrej Tiara located?
The project is in Bengaluru North taluk, Bengaluru Urban district, PIN code 560022.
How many complaints has Godrej Tiara received on RERA?
There is 1 complaint on this project registration.
How many other projects does Godrej Properties have on RERA record in Bengaluru?
Godrej Properties has 12 projects in our Bengaluru records with 65 complaints across all their projects.
What is the land area of Godrej Tiara?
The land area is 19,964 sq m.
Which bank holds the escrow for Godrej Tiara?
Axis Bank holds the escrow account for this project.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Godrej Tiara
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Godrej Properties? Review the builder.
Reviews of Godrej Properties by verified buyers
No verified reviews of Godrej Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Durga SamrudhiSree Shivadurga Builders | 3.4 km | 79 | Dec 2026 | 98% | 0 | Not collected |
| Kumar PlatinaKumar Properties Private Limited | 4.2 km | 184 | Mar 2031 | 9% | 0 | Not collected |
| Vruksha GreensVruksha Infra | 4.8 km | 80 | Jun 2027extended | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
- Karnataka RERA — project register (search by the registration number) (opens in a new tab)
- Karnataka RERA record republished by Aurum PropTech Pulse (cross-check) (opens in a new tab)
- Godrej Properties official project page (price, coordinates, address, possession date field) (opens in a new tab)
- Godrej Properties official brochure PDF for Godrej Tiara (floor plans, carpet areas, amenities, distances, site address) (opens in a new tab)
- Godrej Properties official amenities page for Godrej Tiara (opens in a new tab)
- Godrej Properties official blog on Godrej Tiara (350 homes in 3 towers, approximate sizes) (opens in a new tab)
- Housiey listing for Godrej Tiara (land, floors, banks, payment plan, maintenance, progress) (opens in a new tab)
- Outlook Business, 2 January 2024 (Yeshwanthpur land purchase) (opens in a new tab)
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: rera extended to (no extension; none expected yet); price max; court cases (none found that name this project); maintenance per sqft; car parking; landmarks of kind work and airport (brochure figures unclear or inconsistent); approval numbers/dates for bwssb, bescom, bsnl and bmrcl nocs (scanned files; only application dates and 'approved' status are in the rera update).
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/110625/007817.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 23 Oct 2026
- Builder price list seen: godrejproperties.com (official project page)
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Tumkur Road
Nagasandra, Tumkur RoadUnder constructionRERA registeredBuyers’ group openKumar Platina
by Kumar Properties
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK
- 965 – 1,099 sq ft
- Mar 2031
184 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Platina
Doddabidarikallu, Tumkur RoadReady to moveRERA registeredBuyers’ group openPride Altius
by Pride Housing
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 667 – 1,098 sq ft
- Jun 2026
152 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pride Altius
Chikkabidarakallu, Tumkur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openBrigade Lumina
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 713 – 1,139 sq ft
- Dec 2030
416 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Brigade Lumina