Harappa Greenwoods 5
30×40 plots by Milana Future City Private Limited · Harapanahalli, Bengaluru
Harapanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Milana Future City Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Harappa Greenwoods 5 at a glance
- Completion (RERA)Nov 2029Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroBiocon Hebbagodi · 8.22 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 189 min at peak46.54 km straight line · estimate
- Nearest lakeUnnamed lake · 915 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Harappa Greenwoods 5 is a plotted development by Milana Future City Private Limited in Harapanahalli, Bengaluru with 36 plots, registered with Karnataka RERA. The completion date on RERA is 12 Nov 2029.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Harappa Greenwoods 5 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Milana Future City Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Harappa Greenwoods 5 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40
- Plot area
- 866 – 1,941 sq ft
- Total plots
- 36
- Layout approved by
- Anekal Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 2
- Completion (RERA)
- Nov 2029
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 20 |
| Odd-sized (irregular) | varies | 16 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 136 | Residential | No. ALN/SR (A)/295/94-95 & ALN(Jigani) SR/75/2015-16, 31 Dec 2015 | DC OFFICE JIGANI |
| 144/3 | Residential | No. ALN(Jigani)SR/75/2015-16, 31 Dec 2015 | DC OFFICE JIGANI |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Harappa Greenwoods 5 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/140225/007507
- Registered on
- 14 Feb 2025
- Promised completion
- 12 Nov 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Harappa Greenwoods 5 is a plotted layout by Milana Future City Private Limited in Harapanahalli, Anekal, with 36 plots. The layout is approved and development is complete as of Q2 2026-27, with a completion date of 12 November 2029 on RERA.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Others
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Vijaya Bank Layout
- Building plan (RERA)
- Anekal Planning Authority · No. LAO/56/2024-25 · dated 28 Nov 2024
- Project cost declared to RERA
- ₹5.11 Cr
Amenities
Harappa Greenwoods 5 location and address
- Address
- Sy no 136 & 144/3 measuring an total extent of 01 Acre 35.5 Guntas situated at , Harapanahalli Village, jigani hobli, , Anekal , Bengaluru Urban, Karnataka - 560076
- Village (RERA)
- Harapanahalli
- PIN code
- 560076
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.79103, 77.61637
Distances to landmarks
Not found in public records yet: landmarksAbout Harapanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 8.38 km | approx. 34 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.34 km | approx. 66 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.42 km | approx. 87 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 25.52 km | approx. 103 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.59 km | approx. 116 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 46.54 km | approx. 189 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Tapovan School · 0.49 km
Nearest hospitals and clinics
- Indira Hospital, Bengaluru Urban · 1.19 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Biocon Hebbagodi (ಬಯೋಕಾನ್ ಹೆಬ್ಬಗೋಡಿ)Open now — nearest operating metro station8.22 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station10.56 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 915 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 915 m
- Bidi Lake on OpenStreetMap (opens in a new tab) 1,009 m
- Nanjapura Lake on OpenStreetMap (opens in a new tab) 1,418 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Harappa Greenwoods 5 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 20 |
| Odd | — | 16 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Harappa Greenwoods 5 completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-12.
Timeline
- 1 Feb 2025Project start date given to RERA
- 14 Feb 2025Registered with Karnataka RERA
- 12 Nov 2029Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Anekal Planning Authority · No. LAO/56/2024-25 · dated 2024-11-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC OFFICE JIGANI · No. ALN/SR (A)/295/94-95 & ALN(Jigani) SR/75/2015-16 and 1 more · dated 2015-12-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Anekal Planning Authority · No. LAO/56/2024-25 · dated 28 Nov 2024
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Harappa Greenwoods 5 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Milana Future City Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U70100KA2012PTC065309
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Milana Future City Private Limited’s RERA recordMilana Future City Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Milana Future City Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 36Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 36 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2024
- 12 Oct 2026Quarterly update filed for Q2 2026-27: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 95% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 90% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Feb 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/140225/007507); completion date 12 Nov 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Nov 2024Building plan approved by Anekal Planning Authority (No. LAO/56/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Harappa Greenwoods 5 FAQs
What are the plot sizes in Harappa Greenwoods 5?
The layout has 20 plots of 30×40 feet (1,200 sq ft each) and 16 odd-sized plots whose dimensions are not in the RERA record.
How many plots are there in Harappa Greenwoods 5?
There are 36 plots in total.
Who approved the layout of Harappa Greenwoods 5?
The layout was approved by Anekal Planning Authority.
How many land conversion orders are on record for Harappa Greenwoods 5?
There are 2 land conversion orders on record.
What is the RERA registration number for Harappa Greenwoods 5?
The RERA registration number is PRM/KA/RERA/1251/308/PR/140225/007507, registered on 14 February 2025.
When is Harappa Greenwoods 5 scheduled to be completed?
The completion date on RERA is 12 November 2029.
How many plots are booked in Harappa Greenwoods 5?
The latest quarterly update (Q2 2026-27, ended 30 September 2026) does not state the number of plots booked.
Are there any RERA complaints on Harappa Greenwoods 5?
No RERA complaints have been filed on this project.
Where is Harappa Greenwoods 5 located?
The project is in Harapanahalli, Anekal taluk, Bengaluru Urban district, PIN code 560076.
What other projects does the developer have?
Milana Future City Private Limited has 2 projects in our Bengaluru records and no RERA complaints against it on any project.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Harappa Greenwoods 5
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Milana Future City Private Limited? Review the developer.
Reviews of Milana Future City Private Limited by verified buyers
No verified reviews of Milana Future City Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Harappa Green Woods 4Sri Varasiddhi Vinayaka Developers | 0 km | 47 | Dec 2030 | 100% | 0 | Not collected |
| Harappa Green Woods 2SVV Holdings & Developers LLP | 0.4 km | 61 | Jun 2026 | 100% | 0 | Not collected |
| Spring Woods IIDai Doron India Properties Private Limited | 1.1 km | 233 | Dec 2026 | 82% | 0 | Not collected |
| Vijayanagar Eco VillageVijayanagar Eco Village Private Limited | 1.9 km | 274 | Mar 2026 | 10% | 11 | Not collected |
| Green AvenuesM/S Paramount Infracon | 2 km | 266 | Jun 2026 | 100% | 0 | Not collected |
| KuteeraM/s The Royal Elegant Ventures | 2.1 km | 138 | Mar 2027extended | 97% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/140225/007507.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Harapanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Harappa Green Woods 4
by Sri Varasiddhi Vinayaka
Price: Price on requestGet brochure & price →
- 30×40, 30×55
- 1,003 – 2,571 sq ft plots
- Approved by Anekal Planning Authority
- Dec 2030
47 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Harappa Green Woods 4 - Harrappanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Harappa Green Woods 2
by SVV Holdings
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 30×50
- 1,108 – 2,228 sq ft plots
- Approved by Local Planning Authority
- Jun 2026
61 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Harappa Green Woods 2
Bukkasagara, near Bannerghatta RoadUnder constructionRERA registeredBuyers’ group openSpring Woods II
by Dai Doron India Properties
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×80
- 872 – 7,041 sq ft plots
- Approved by Local Planning Authority
- Dec 2026
233 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Spring Woods II