Havena by KSR
2 & 3 BHK apartments by KSR Builders And Developers · Bayyanahalli, Bellary Road (Airport Road), Bengaluru
Bayyanahalli, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by KSR Builders And Developers
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Havena by KSR at a glance
- Possession (RERA)Dec 2029Karnataka RERA
- Construction13% built · on pace for Jul 2029RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked19 of 136 (14%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroDoddajala · 2.57 km (under construction)Open now: Peenya, 18.87 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 37 min at peak9.13 km straight line · estimate
- Nearest lakeTarabanahalli Lake · 427 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Havena by KSR is a residential project by KSR Builders And Developers in Bayyanahalli, Bengaluru with 136 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Havena by KSR buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks KSR Builders And Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Havena by KSR buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 825 – 1,068 sq ft
- Towers
- 2
- Floors
- 4
- Total homes
- 136
- Land
- 2.04 acres
- Possession (RERA)
- Dec 2029
- Built (RERA update)
- 13%
Havena by KSR RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/230626/008747
- Registered on
- 23 Jun 2026
- Promised completion
- 31 Dec 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 19 of 136 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| AMBER | 4 | 1 | 68 |
| Bonita | 4 | 1 | 68 |
A dash (—) means the filing did not state that value.
Summary in plain English
Havena by KSR is a residential project by KSR Builders And Developers in Bayyanahalli, Bengaluru North, with 136 homes across 2 towers. The project has 2 BHK and 3 BHK homes and is registered on RERA with a completion date of 31 December 2029.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 55.1% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, chandapura
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. BP/294/2025-26 · dated 12 Mar 2026
- Project cost declared to RERA
- ₹78.01 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Havena by KSR location and address
- Address
- Havena by KSR, Sy no 21/3, Bayyanahalli village, Jala hobli, , Yelahanka, Bynahalli, Karnataka , Bengaluru North , Bengaluru Urban, Karnataka - 562157
- Village (RERA)
- Bayyanahalli
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562157
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.17825, 77.62328
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 9.13 km | approx. 37 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.47 km | approx. 59 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 23 km | approx. 93 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 24.56 km | approx. 99 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 28.99 km | approx. 117 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 36.81 km | approx. 149 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Sri Revanna Siddeshwara Institute of Technology · 0.78 km
- VEDIC · 1.57 km
Nearest hospitals and clinics
- N.R.V Hospital · 1.81 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction2.57 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction6.71 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction7.25 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station18.87 km
- Doddajala Nearest railway station1.93 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Tarabanahalli Lake, 427 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Tarabanahalli Lake on OpenStreetMap (opens in a new tab) 427 m
- Chikkajala Lake on OpenStreetMap (opens in a new tab) (ಚಿಕ್ಕಜಾಲ ಕೆರೆ)788 m
- Kadiganahalli Tank on OpenStreetMap (opens in a new tab) 1,530 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Havena by KSR floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 pages

BrochureFull PDF on RERA 
Approved building plan5 pages

Approved Building PlanFull PDF on RERA
Approved layout plan2 files

Demarcation of proposed land -Bayyanahalli 21 LUFiled 30 May 2026 · Full PDF on RERA 
Demarcation of proposed land in original Village mapFiled 30 May 2026 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 825 – 846 sq ft | 20 |
| 2 BHK-east | 845 sq ft | 10 |
| 2 BHK-west | 825 sq ft | 10 |
| 3 BHK | 910 – 1,068 sq ft | 116 |
| 3 BHK-east | 1,027 sq ft | 58 |
| 3 BHK-west | 921 sq ft | 58 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Havena by KSR possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 20 | 0 | 20 |
| 3 BHK | 116 | 19 | 97 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 May 2026Project start date given to RERA
- 23 Jun 2026Registered with Karnataka RERA
- 31 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2029 — about 6 months before the completion date on RERA (31 Dec 2029).
At the pace between the 2 quarterly filings we have (2% → 13% in 3 months), it would be around Sep 2028 — about 15 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 13% | 19 of 136 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 2% | 1 of 136 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 13% ÷ 5 months (1 May 2026 to 30 Sep 2026) = 2.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 87 ÷ 2.6 = 33.4 months → Jul 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (13% − 2%) ÷ 3 months = 3.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. BP/294/2025-26 · dated 2026-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | OFFICE OF DEPUTY COMMISSIONER BENGALURU URBAN DISTRICT · No. 431246 · dated 2023-02-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. BP/294/2025-26 · dated 12 Mar 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Havena by KSR RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About KSR Builders And Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
KSR Builders And Developers’s RERA recordKSR Builders And Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under KSR Builders And Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 136Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 136 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2026
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 13% built, 19 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 2% built, 1 of 136 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Jun 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/230626/008747); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2026Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. BP/294/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Havena by KSR FAQs
What is Havena by KSR?
Havena by KSR is a residential project by KSR Builders And Developers located in Bayyanahalli, Bengaluru North, with 136 homes in 2 towers of up to 4 floors.
When will Havena by KSR be completed?
The project completion date on RERA is 31 December 2029.
What home types are available in Havena by KSR?
The project offers 2 BHK homes with carpet area from 825 to 846 sq ft, and 3 BHK homes with carpet area from 910 to 1,068 sq ft.
How many homes are in Havena by KSR?
The project has 136 homes: 20 two-bedroom homes and 116 three-bedroom homes.
What is the RERA registration number for Havena by KSR?
The RERA registration number is PRM/KA/RERA/1251/309/PR/230626/008747, registered on 23 June 2026.
What is the construction progress of Havena by KSR?
As of the quarter ended 30 September 2026, the project is 13% complete with 19 homes booked out of 136.
What are the complaints against Havena by KSR on RERA?
There are no RERA complaints on this project.
Where is Havena by KSR located?
The project is in Bayyanahalli, Bengaluru North taluk, Bengaluru Urban district, with PIN code 562157.
Are there any complaints against KSR Builders And Developers?
There are no RERA complaints against the builder across all projects on record.
What is the land area of Havena by KSR?
The land area is 8,242 sq m.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Havena by KSR
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from KSR Builders And Developers? Review the builder.
Reviews of KSR Builders And Developers by verified buyers
No verified reviews of KSR Builders And Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| VSS EnclaveStature Homes Builders And Developers | 1.8 km | 40 | Dec 2025 | 100% | 2 | Not collected |
| Fiorana@Beaumont Estate(Phase-1)Lodha Developers Limited | 1.9 km | 540 | Mar 2032 | 0% | 0 | Not collected |
| Ramya Water FrontRamya Estates | 2 km | 39 | Jun 2027 | 45% | 0 | Not collected |
| Hanging GardensGraviti Living Spaces (India) Pvt Ltd | 2.2 km | 172 | Sep 2030 | — | 0 | Not collected |
| Axis OaklynAxis Concept Construction Pvt Ltd | 2.5 km | 56 | Mar 2027 | 100% | 0 | Not collected |
| DS Max Sky ShlokamDS Max Properties Private Limited | 2.5 km | 992 | Mar 2031 | 46% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/230626/008747.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
Chikkajala, Bellary Road (Airport Road)Ready to moveRERA registeredBuyers’ group openVSS Enclave
by Stature Homes Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 593 – 848 sq ft
- Dec 2025
40 homes · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for VSS Enclave
Chikkajala, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openRamya Water Front
by Ramya Estates
Price: Price on requestGet brochure & price →
- 5 BHK
- 2,571 – 4,849 sq ft
- Jun 2027
39 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ramya Water Front
Kadaganahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openHanging Gardens
by Graviti Living Spaces (India)
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 829 – 1,496 sq ft
- Sep 2030
172 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Hanging Gardens