Heart Of Harmony
Apartments by CKPC Residences Private Limited · Hongasandra, Hosur Road, Bengaluru
Hongasandra, Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by CKPC Residences Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Heart Of Harmony at a glance
- Possession (RERA)Mar 2030Karnataka RERA
- Construction6% built · on pace for Dec 2031 21 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked49 of 137 (36%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroKudlu Gate · 0.33 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 142 min at peak34.99 km straight line · estimate
- Nearest lakeUnnamed lake · 224 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Heart Of Harmony is a residential project by CKPC Residences Private Limited in Hongasandra, Bengaluru with 137 homes, registered with Karnataka RERA. The completion date on RERA is 1 Mar 2030.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Heart Of Harmony buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks CKPC Residences Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Heart Of Harmony buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 3 BHK, 4 BHK
- Carpet area
- 681 – 1,632 sq ft
- Towers
- 1
- Floors
- 24
- Total homes
- 137
- Land
- 1.83 acres
- Possession (RERA)
- Mar 2030
- Built (RERA update)
- 6%
Heart Of Harmony RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/310326/008560
- Registered on
- 31 Mar 2026
- Promised completion
- 1 Mar 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 49 of 137 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower-1 | 24 | 2 | 137 |
A dash (—) means the filing did not state that value.
Summary in plain English
Heart Of Harmony is a residential project by CKPC Residences Private Limited in Hongasandra, Bengaluru South, with 137 homes in one 24-storey tower. The project is registered as a New Project Launch and is expected to be completed by 1 March 2030.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 84.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Langford Garden, Bengaluru
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BSCC/1962/25-26 · dated 31 Mar 2026
- Project cost declared to RERA
- ₹256 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
- Meet and Greet
- Cycle Track
- Jogging Track
- Amphitheatre
- Sculpture court
- Tot Lot
- Rock climbing
- Multipurpose court
- Pet Corner
- Basket ball practice court
- Outdoor Gym
- Seating plaza
- Nature trial
- Reflexology path
- Sky deck
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Heart Of Harmony location and address
- Address
- E-KHATHA No.1954334666, Sy.No.115 , HONGASANDRA VILLAGE, BEGUR HOBLI, BANGALORE SOUTH TALUK , Bengaluru South , Bengaluru Urban, Karnataka - 560068
- Village (RERA)
- Hongasandra
- Locality
- Hosur RoadAlso known as Hosur Main Road, NH 48
- PIN code
- 560068
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.89274, 77.63837
Distances to landmarks
Not found in public records yet: landmarksAbout Hosur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 5.59 km | approx. 23 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 5.78 km | approx. 23 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 12.08 km | approx. 49 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 15.08 km | approx. 61 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.4 km | approx. 70 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 34.99 km | approx. 142 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 54Schools and colleges48 schools, 4 colleges, 2 kindergartens
- 20Hospitals and clinics17 hospitals, 3 clinics
Nearest schools and colleges
- Rajrajeshwari HS, Garvebhavi Palya · 0.32 km
- New Bharat International Kudlu Gate, Bommana Halli · 0.41 km
- Ves HS, Garvebhavi Palya · 0.49 km
Nearest hospitals and clinics
- Sai Sparsh Hospital · 0.18 km
- Ganesh Nursing Home, Bengaluru Urban · 0.67 km
- Vasan Eye Care Hospital · 0.76 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kudlu Gate (ಕುಡ್ಲು ಗೇಟ್)Open now — nearest operating metro station0.33 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station7.49 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 224 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 224 m
- Chikka Beguru Lake on OpenStreetMap (opens in a new tab) (ಚಿಕ್ಕ ಬೇಗೂರು ಕೆರೆ)645 m
- ITI Layout Lake on OpenStreetMap (opens in a new tab) 955 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Heart Of Harmony home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan10 pages

4 APPROVED BUILDING PLANFiled 31 Mar 2026 · Full PDF on RERA
Approved layout plan2 files

Village Map Demarcation.pdfFull PDF on RERA 
Village Map Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 bed residence | 681 sq ft | 1 |
| 3 bed classic-01 | 1,141 sq ft | 9 |
| 3 bed classic-02 | 1,141 sq ft | 15 |
| 3 bed classic-03 | 1,120 sq ft | 8 |
| 3 bed classic-04 | 1,120 sq ft | 14 |
| 3 bed premium- 01 | 1,228 sq ft | 8 |
| 3 bed premium- 01a | 1,228 sq ft | 1 |
| 3 bed premium- 02 | 1,228 sq ft | 14 |
| 3 bed premium- 02a | 1,228 sq ft | 1 |
| 3 bed premium- 03 | 1,242 sq ft | 6 |
| 3 bed premium- 03a | 1,242 sq ft | 1 |
| 3 bed premium- 04 | 1,242 sq ft | 14 |
| 3 bed study luxe - 1 | 1,377 sq ft | 8 |
| 3 bed study luxe - 1a | 1,377 sq ft | 1 |
| 3 bed study luxe - 2 | 1,377 sq ft | 14 |
| 3 bed study luxe - 2a | 1,377 sq ft | 1 |
| 4 bed grand- 01a | 1,632 sq ft | 1 |
| 4 bed grand-01 | 1,632 sq ft | 6 |
| 4 bed grand-02 | 1,632 sq ft | 14 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Heart Of Harmony possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BED RESIDENCE | 1 | 0 | 1 |
| 3 BED CLASSIC-01 | 9 | 2 | 7 |
| 3 BED CLASSIC-02 | 15 | 6 | 9 |
| 3 BED CLASSIC-03 | 8 | 2 | 6 |
| 3 BED CLASSIC-04 | 14 | 1 | 13 |
| 3 BED PREMIUM- 01 | 8 | 4 | 4 |
| 3 BED PREMIUM- 01A | 1 | 0 | 1 |
| 3 BED PREMIUM- 02 | 14 | 5 | 9 |
| 3 BED PREMIUM- 02A | 1 | 0 | 1 |
| 3 BED PREMIUM- 03 | 6 | 3 | 3 |
| 3 BED PREMIUM- 03A | 1 | 0 | 1 |
| 3 BED PREMIUM- 04 | 14 | 3 | 11 |
| 3 BED STUDY LUXE - 1 | 8 | 7 | 1 |
| 3 BED STUDY LUXE - 1A | 1 | 0 | 1 |
| 3 BED STUDY LUXE - 2 | 14 | 6 | 8 |
| 3 BED STUDY LUXE - 2A | 1 | 0 | 1 |
| 4 BED GRAND- 01A | 1 | 0 | 1 |
| 4 BED GRAND-01 | 6 | 5 | 1 |
| 4 BED GRAND-02 | 14 | 5 | 9 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 31 Mar 2026Registered with Karnataka RERA
- 1 Jun 2026Project start date given to RERA
- 1 Mar 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2031 — about 21 months after the completion date on RERA (1 Mar 2030).
At the pace between the 3 quarterly filings we have (0% → 6% in 6 months), it would be around Aug 2034 — about 53 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 6% | 49 of 137 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 5% | 31 of 137 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 0% | 0 of 137 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 6% ÷ 4 months (1 Jun 2026 to 30 Sep 2026) = 1.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 94 ÷ 1.5 = 62.3 months → Dec 2031. This is an estimate, not a date from the builder or RERA.
Pace between filings = (6% − 0%) ÷ 6 months = 1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BSCC/1962/25-26 · dated 2026-03-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | District Commissioner Office, Bengaluru · No. 35817 · dated 2025-06-25 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BSCC/1962/25-26 · dated 31 Mar 2026
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Heart Of Harmony RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About CKPC Residences Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- U41000KA2025PTC196977
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
CKPC Residences Private Limited’s RERA recordCKPC Residences Private Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under CKPC Residences Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 575Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 575 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2026
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 6% built, 49 of 137 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 5% built, 31 of 137 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 0% built, 0 of 137 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/310326/008560); completion date 1 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. GBA/BSCC/1962/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Heart Of Harmony FAQs
What is the RERA registration number for Heart Of Harmony?
The project is registered under RERA number PRM/KA/RERA/1251/310/PR/310326/008560, registered on 31 March 2026.
How many homes are in Heart Of Harmony and what types are available?
The project has 137 homes with home types including 1 BED RESIDENCE (681 sq ft carpet area), 3 BED units ranging from 1,120 to 1,377 sq ft carpet area, and 4 BED GRAND units (1,632 sq ft carpet area).
What is the expected completion date for Heart Of Harmony?
The project is expected to be completed by 1 March 2030 according to the RERA registration.
Where is Heart Of Harmony located?
Heart Of Harmony is located in Hongasandra, Bengaluru South taluk, Bengaluru Urban district, with PIN code 560068.
What is the construction progress of Heart Of Harmony?
As of the second quarter ending 30 September 2026, the project is 6 percent complete, with 49 homes booked out of 137.
Are there any RERA complaints against Heart Of Harmony or its builder?
There are no RERA complaints filed against this project or against CKPC Residences Private Limited.
How many towers does Heart Of Harmony have?
Heart Of Harmony has one tower with a maximum of 24 floors.
What is the land area of Heart Of Harmony?
The project land area is 7,411 sq m according to the RERA record.
How many other projects does the builder of Heart Of Harmony have on RERA record?
CKPC Residences Private Limited has 2 projects in the Bengaluru RERA records.
What is the escrow bank for Heart Of Harmony?
HDFC is the escrow bank for this project.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Heart Of Harmony
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from CKPC Residences Private Limited? Review the builder.
Reviews of CKPC Residences Private Limited by verified buyers
No verified reviews of CKPC Residences Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Purva HeritagePuravankara Ltd | 0.3 km | 148 | Aug 2030 | 0% | 0 | from ₹3.1 Crabout ₹31,900/sq ft carpet |
| SNN Estates DuomontSNN Estates LLP | 0.5 km | 114 | Dec 2030 | 6% | 0 | Not collected |
| Ample LotusAmple Infra | 0.9 km | 56 | May 2029 | 17% | 0 | Not collected |
| M R SerenityM R Developers | 0.9 km | 170 | Dec 2029 | 57% | 0 | Not collected |
| Casagrand FlamingoCasa Grande Garden City Builders Private Limited | 1.3 km | 218 | Sep 2026 | 80% | 0 | Not collected |
| Purva MerakiPuravankara Limited | 1.3 km | 44 | Oct 2027 | 77% | 0 | from ₹3.9 Crabout ₹28,500/sq ft carpet |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/310326/008560.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hosur Road
Hongasandra, Hosur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openPurva Heritage
by Puravankara
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 790 – 1,238 sq ft
- Aug 2030
148 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Purva Heritage
Hongasandra, Hosur RoadUnder constructionRERA registeredBuyers’ group openSNN Estates Duomont
by SNN Estates
Price: Price on requestGet brochure & price →
- 1 BHK, 3 BHK, 4 BHK
- 606 – 2,301 sq ft
- Dec 2030
114 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SNN Estates Duomont
Hongasandra, HSR LayoutUnder constructionRERA registeredBuyers’ group openAmple Lotus
by Ample Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 738 – 989 sq ft
- May 2029
56 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ample Lotus