Iconica Nitesh Park Avenue
2, 3 & 4 BHK apartments by Gardencity Realty Private Limited · near Malleswaram, Bengaluru
Near Malleswaram, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Gardencity Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Iconica Nitesh Park Avenue at a glance
- Possession (RERA)Jun 2028 ExtendedWas Dec 2021 · Karnataka RERA
- Construction55% built · on pace for Dec 2036 101 mo after RERA dateRERA filing to 30 Jun 2026; estimate from average pace
- Homes booked5 of 66 (8%)RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroMantri Square Sampige Road · 1.64 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 107 min at peak26.43 km straight line · estimate
- Nearest lakePalace Grounds Lake · 877 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Iconica Nitesh Park Avenue is a residential project by Gardencity Realty Private Limited in Bengaluru with 66 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Iconica Nitesh Park Avenue buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Gardencity Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Iconica Nitesh Park Avenue buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 337 – 2,941 sq ft
- Towers
- 1
- Floors
- 33
- Total homes
- 66
- Land
- 0.62 acres
- Possession (extended)
- Jun 2028
- Built (RERA update)
- 55%
Iconica Nitesh Park Avenue RERA number and registration details
- RERA number
- TOR/PRM/KA/RERA/1251/309/PR/210528/001913
- Registered on
- 28 May 2021
- Promised completion
- 30 Dec 2021
- Extended to
- 30 Jun 2028
- RERA status
- Under construction
- Homes booked
- 5 of 66 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 33 | 3 | 33 |
A dash (—) means the filing did not state that value.
Summary in plain English
Iconica Nitesh Park Avenue is a residential project by Gardencity Realty Private Limited in Bengaluru North with 66 homes in one tower of 33 floors. The project was registered with RERA on 28 May 2021 with a completion date of 30 June 2028.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 88.6% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road
- Project cost declared to RERA
- ₹108 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Iconica Nitesh Park Avenue location and address
- Address
- Abshot Layout Sankey Road, Bangalore 560020
- Village (RERA)
- Not found in public records yet: village
- Locality
- Near MalleswaramAlso known as Malleshwaram
- PIN code
- 560005
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.99308, 77.58567
Distances to landmarks
Not found in public records yet: landmarksAbout the locality
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 2.41 km | approx. 10 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 7.16 km | approx. 29 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 12.91 km | approx. 52 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 16.49 km | approx. 67 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 18.11 km | approx. 73 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 26.43 km | approx. 107 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 74Schools and colleges38 schools, 29 colleges, 7 kindergartens
- 64Hospitals and clinics38 hospitals, 26 clinics
Nearest schools and colleges
- Mount Carmel Central School · 0.2 km
- Shishya Nursery · 0.24 km
- Bethesda High School · 0.43 km
Nearest hospitals and clinics
- Queens Nursing Home · 0.36 km
- Samprathi Eye Hospital And Squint Centre · 0.54 km
- Place Guttahalli Maternity Home · 0.75 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Mantri Square Sampige Road (ಮಂತ್ರಿ ಸ್ಕ್ವೇರ್ ಸಂಪಿಗೆ ರಸ್ತೆ)Open now — nearest operating metro station1.64 km
- Bangalore Cantonment (ಬೆಂಗಳೂರು (ಕಂಟೊನ್ಮೆಂಟ್))Nearest railway station1.34 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Palace Grounds Lake, 877 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Palace Grounds Lake on OpenStreetMap (opens in a new tab) (ಅರಮನೆ ಮೈದಾನದ ಕೆರೆ)877 m
- Sankey Tank on OpenStreetMap (opens in a new tab) (ಸಾಂಕಿ ಕೆರೆ)1,862 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Iconica Nitesh Park Avenue home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

Project PlanFull PDF on RERA 
building plan.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 903 sq ft | 1 |
| 3 BHK | 1,768 – 1,825 sq ft | 10 |
| 4 BHK | 337 – 355 sq ft | 22 |
| Residental flats | 2,941 sq ft | 33 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Iconica Nitesh Park Avenue possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 1 | 0 | 1 |
| 3 BHK | 10 | 5 | 5 |
| 4 BHK | 22 | 0 | 22 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 30 Sep 2013Project start date given to RERA
- 28 May 2021Registered with Karnataka RERA
- 30 Dec 2021Completion date given at registration
- 30 Dec 2022Section 6 Extension: completion date moved to this date
- 30 Jun 2028Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2036 — about 101 months after the completion date on RERA (30 Jun 2028).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 55% | 5 of 33 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 55% ÷ 153 months (30 Sep 2013 to 30 Jun 2026) = 0.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 45 ÷ 0.4 = 125.1 months → Dec 2036. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Iconica Nitesh Park Avenue RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Gardencity Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 1
- Company number (CIN)
- U70200KA2004PTC033885
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Gardencity Realty Private Limited’s RERA recordGardencity Realty Private Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Gardencity Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 94Homes registeredAs stated in each registrations.
- 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 10.6Complaints per 1,000 homes1 complaints ÷ 94 homes in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2013
- 30 Jun 2028Completion date extended to 30 Jun 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 55% built, 5 of 33 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 May 2021Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/309/PR/210528/001913); completion date 30 Dec 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2013Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Iconica Nitesh Park Avenue FAQs
When will Iconica Nitesh Park Avenue be completed?
The RERA completion date is 30 June 2028, with two extensions granted since the original completion date of 30 December 2021.
How many homes are in Iconica Nitesh Park Avenue?
The project has 66 homes in one tower with 33 floors.
What home types are available in Iconica Nitesh Park Avenue?
The project offers 2 BHK with 903 sq ft carpet area, 3 BHK with 1,768 to 1,825 sq ft carpet area, 4 BHK with 337 to 355 sq ft carpet area, and residential flats with 2,941 sq ft carpet area.
Where is Iconica Nitesh Park Avenue located?
The project is in Bengaluru North taluk, Bengaluru Urban district, PIN code 560005.
How many homes have been booked in Iconica Nitesh Park Avenue?
As of Q1 2026-27, 5 homes have been booked out of 33 homes in the booking table.
What is the construction progress of Iconica Nitesh Park Avenue?
As of Q1 2026-27 (quarter ended 30 June 2026), the project is 55% complete.
Are there any RERA complaints against Iconica Nitesh Park Avenue?
There are no RERA complaints on record for this project.
Who is the builder of Iconica Nitesh Park Avenue?
Gardencity Realty Private Limited is the builder. The builder has 2 projects in the RERA record and 1 RERA complaint across all projects.
Which bank is the escrow agent for Iconica Nitesh Park Avenue?
HDFC is the escrow bank for this project.
What is the land area of Iconica Nitesh Park Avenue?
The land area is 2,508 sq m.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Iconica Nitesh Park Avenue
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Gardencity Realty Private Limited? Review the builder.
Reviews of Gardencity Realty Private Limited by verified buyers
No verified reviews of Gardencity Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Mane-Bs49Eternity Structures Private Limited | 2.2 km | 114 | Apr 2028 | — | 0 | Not collected |
| Inspira Tropical GardenIinspira Tropical Garden LLP | 2.4 km | 181 | Jun 2026 | 95% | 1 | Not collected |
| Trilok Premium ApartmentsNaresh Kumar H | 3 km | 16 | Aug 2028 | 100% | 0 | Not collected |
| Magnolia DelightMagnolia Infrastructure Development Limited | 3.8 km | 48 | Mar 2028 | 50% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/309/PR/210528/001913.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Srirampura, JakkurUnder constructionRERA registeredBuyers’ group open
Mane-Bs49
by Eternity Structures
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK
- 701 – 1,149 sq ft
- Apr 2028
114 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mane-Bs49
Gulimangala, Richmond RoadUnder constructionRERA registeredBuyers’ group openInspira Tropical Garden
by Iinspira Tropical Garden
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 676 – 3,790 sq ft
- Jun 2026
RERA not updated since promised Jun 2026 · 181 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Inspira Tropical Garden
Kenchenahalli, Rajarajeshwari NagarUnder constructionRERA registeredBuyers’ group openTrilok Premium Apartments
by Naresh Kumar H
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,071 – 1,211 sq ft
- Aug 2028
16 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Trilok Premium Apartments