Isr Udayam
2 & 3 BHK apartments by Isr Constructions Pvt Ltd · near Budigere Cross, Bengaluru
Near Budigere Cross, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Aug 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Isr Udayam at a glance
- Possession (RERA)Aug 2026 Date passedKarnataka RERA
- Construction73% built · on pace for Apr 2028 20 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked95 of 158 (60%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 9.03 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 59 min at peak14.61 km straight line · estimate
- Nearest lakeManduru Lake · 58 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Isr Udayam is a residential project by Isr Constructions Pvt Ltd in Bengaluru with 158 homes, registered with Karnataka RERA. The completion date on RERA is 31 Aug 2026.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Isr Udayam buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Isr Constructions Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Isr Udayam buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 642 – 904 sq ft
- Towers
- 2
- Floors
- 4
- Total homes
- 158
- Land
- 2.37 acres
- Possession (RERA)
- Aug 2026
- Built (RERA update)
- 73%
Isr Udayam RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/211122/005489
- Registered on
- 21 Nov 2022
- Promised completion
- 31 Aug 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 95 of 158 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| ISR UDAYAM A | 4 | 0 | 72 |
| ISR UDAYAM B | 4 | 0 | 86 |
A dash (—) means the filing did not state that value.
Summary in plain English
Isr Udayam is a residential project by Isr Constructions Pvt Ltd in Bengaluru East with 158 homes across 2 towers. The project includes 92 three-bedroom and 66 two-bedroom homes, with completion set for 31 August 2026.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 56.4% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, RICHMOND ROAD
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/CC/35/2022-23 · dated 26 Jul 2022
- Project cost declared to RERA
- ₹69.38 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Isr Udayam location and address
- Address
- SY NO:3/2,3/3 BOMMENHALLI LAND,BIDARAHALLI HOBLI,HOSAKOTE TALUK, BANGALORE EAST TALUK , SY NO:3/2,3/3 BOMMENHALLI LAND,BIDARAHALLI HOBLI,HOSAKOTE TALUK, BANGALORE EAST TALUK , Bengaluru East , Bengaluru Urban, Karnataka - 560087
- Village (RERA)
- Not found in public records yet: village
- Locality
- Near Budigere CrossAlso known as Budigere
- PIN code
- 560087
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.07636, 77.74780
Distances to landmarks
Not found in public records yet: landmarksAbout the locality
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 9.93 km | approx. 40 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.21 km | approx. 58 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 14.61 km | approx. 59 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 18.44 km | approx. 75 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.18 km | approx. 90 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 26.76 km | approx. 108 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges6 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- New Baldwin International Residential School · 1.37 km
- Swami Vivekananda College of Nursing · 1.44 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station9.03 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station9.01 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Manduru Lake, 58 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Manduru Lake on OpenStreetMap (opens in a new tab) 58 m
- Prestige Tranquility Lake on OpenStreetMap (opens in a new tab) 957 m
- Hosakote lake on OpenStreetMap (opens in a new tab) (ಹೊಸಕೋಟೆ ಕೆರೆ)1,177 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Isr Udayam floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure6 pages

BrochureFull PDF on RERA 




Approved layout plan3 pages

Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 642 – 724 sq ft | 66 |
| 3 BHK | 797 – 904 sq ft | 92 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Isr Udayam possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-05.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 66 | 31 | 35 |
| 3 BHK | 92 | 64 | 28 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 26 Jul 2022Project start date given to RERA
- 21 Nov 2022Registered with Karnataka RERA
- 31 Aug 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2028 — about 20 months after the completion date on RERA (31 Aug 2026).
At the pace between the 4 quarterly filings we have (69% → 73% in 9 months), it would be around Oct 2031 — about 62 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 5 Oct 2026 | 73% | 95 of 158 |
| Q1 2026-27to 30 Jun 2026 | 2 Jul 2026 | 71% | 90 of 158 |
| Q4 2025-26to 31 Mar 2026 | 29 Apr 2026 | 69% | 96 of 158 |
| Q3 2025-26to 31 Dec 2025 | 22 Jan 2026 | 69% | 96 of 158 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 73% ÷ 50.2 months (26 Jul 2022 to 30 Sep 2026) = 1.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 27 ÷ 1.5 = 18.6 months → Apr 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (73% − 69%) ÷ 9 months = 0.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-05.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/CC/35/2022-23 · dated 2022-07-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | TAHASILDAR BANGALORE URBAN DISTRICT · No. ALN/EBK/SR/36/19-20 · dated 2019-12-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/CC/35/2022-23 · dated 26 Jul 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Isr Udayam RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Isr Constructions Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- U45209AP2013PTC089980
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Isr Constructions Pvt Ltd’s RERA recordIsr Constructions Pvt Ltd delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Isr Constructions Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 158Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 6.3Complaints per 1,000 homes1 complaints ÷ 158 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2022
- 5 Oct 2026Quarterly update filed for Q2 2026-27: 73% built, 95 of 158 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jul 2026Quarterly update filed for Q1 2026-27: 71% built, 90 of 158 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Apr 2026Quarterly update filed for Q4 2025-26: 69% built, 96 of 158 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jan 2026Quarterly update filed for Q3 2025-26: 69% built, 96 of 158 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Nov 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/211122/005489); completion date 31 Aug 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Jul 2022Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. HPA/CC/35/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Jul 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Isr Udayam FAQs
What is the RERA registration number for Isr Udayam?
The RERA registration number is PRM/KA/RERA/1251/446/PR/211122/005489, registered on 21 November 2022.
How many homes are in Isr Udayam and what types?
The project has 158 homes: 92 three-bedroom homes and 66 two-bedroom homes.
What is the carpet area range for homes in Isr Udayam?
Three-bedroom homes range from 797 to 904 sq ft carpet area, and two-bedroom homes range from 642 to 724 sq ft carpet area.
When will Isr Udayam be completed?
The completion date on RERA is 31 August 2026.
Where is Isr Udayam located?
The project is in Bengaluru East taluk, Bengaluru Urban district, with PIN code 560087.
What is the construction progress of Isr Udayam?
As of 30 September 2026, the project is 73% complete with 95 homes booked out of 158.
Are there any RERA complaints on Isr Udayam?
There are no RERA complaints filed on this project registration.
How many towers does Isr Udayam have?
The project has 2 towers, each with a maximum of 4 floors.
What is the land area of Isr Udayam?
The land area is 9,611 sq metres.
What is the builder's track record with other projects?
Isr Constructions Pvt Ltd has 2 projects in the Bengaluru RERA records and 1 RERA complaint filed against the builder across all projects.
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Isr Udayam
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Isr Constructions Pvt Ltd? Review the builder.
Reviews of Isr Constructions Pvt Ltd by verified buyers
No verified reviews of Isr Constructions Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Neighbourhood Tree ParkNeighbourhood Estates | 0.1 km | 93 | Dec 2028 | 24% | 0 | Not collected |
| Urbanest Elite 35Urbanest Realty | 0.7 km | 35 | Dec 2026 | 100% | 0 | Not collected |
| MGR BrindavanMGR Infra | 0.7 km | 36 | Dec 2028 | 65% | 0 | Not collected |
| Definer Upper DeckDefiner Ventures | 0.8 km | 110 | Dec 2025 | 100% | 1 | Not collected |
| Aadya HeightsWhitewinds Constructions Private Limited | 1.5 km | 98 | Dec 2025 | 100% | 0 | Not collected |
| Sattva BlissSattva Resi Private Limited | 1.5 km | 338 | Aug 2027 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/211122/005489.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 11 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Mandur, near Budigere CrossUnder constructionRERA registeredBuyers’ group openNeighbourhood Tree Park
by Neighbourhood Estates
Price: Price on requestGet brochure & price →
- 4 BHK
- 2,058 – 3,186 sq ft
- Dec 2028
93 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Neighbourhood Tree Park
issued by Mandur, Budigere CrossUnder constructionRERA registeredBuyers’ group openUrbanest Elite 35
by Urbanest Realty
Price: Price on requestGet brochure & price →
- 3 BHK
- 872 – 1,150 sq ft
- Dec 2026
35 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Urbanest Elite 35
Manduru, near Budigere CrossUnder constructionRERA registeredBuyers’ group openMGR Brindavan
by MGR Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 689 – 969 sq ft
- Dec 2028
36 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for MGR Brindavan