KBL Enclave - Phase 2
30×33, 30×40 +1 more plots by L Kumar · guntas Tammashettahalli, Doddaballapur Road, Bengaluru
guntas Tammashettahalli, Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Dec 2025; no extension or completion filed
- plotted
by L Kumar
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
KBL Enclave - Phase 2 at a glance
- Completion (RERA)Dec 2025 Date passedKarnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroDoddajala · 14.35 km (under construction)Open now: Chikkabidarakallu, 28.18 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 73 min at peak18.04 km straight line · estimate
- Nearest lakeUnnamed lake · 417 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
KBL Enclave - Phase 2 is a plotted development by L Kumar in guntas Tammashettahalli, Bengaluru with 77 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
KBL Enclave - Phase 2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks L Kumar for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the KBL Enclave - Phase 2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×33, 30×40, 40×40
- Plot area
- 771 – 7,103 sq ft
- Total plots
- 77
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 4
- Completion (RERA)
- Dec 2025
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×33 | 990 sq ft | 6 |
| 30×40 | 1,200 sq ft | 23 |
| 40×40 | 1,600 sq ft | 4 |
| Odd-sized (irregular) | varies | 44 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 18/1 | Residential | No. 271270, 28 Oct 2021 | DC-BANGALORE RURAL |
| 18/3 | Residential | No. 271282, 28 Oct 2021 | DC-BANGALORE RURAL |
| 18/4 | Residential | No. 271269, 28 Oct 2021 | DC-BANGALORE RURAL |
| 202 | Residential | No. 407489, 27 Sep 2022 | DC-BANGALORE RURAL |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
KBL Enclave - Phase 2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/301/PR/280324/006751
- Registered on
- 28 Mar 2024
- Promised completion
- 31 Dec 2025
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
KBL Enclave - Phase 2 is a plotted layout by L Kumar in Guntas Tammashettahalli, Doddaballapura taluk, Bengaluru Rural. The project has 77 plots across multiple sizes. Completion is scheduled for 31 December 2025.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, M.G ROAD
- Building plan (RERA)
- Local Planing Authority · No. STRRPA/TP/LAO/38/2022-23 · dated 31 Jan 2023
- Project cost declared to RERA
- ₹14.96 Cr
Amenities
KBL Enclave - Phase 2 location and address
- Address
- Survey No. 18/1,18/3,& 18/4 measuring 1acre 33 guntas situated at Tammashettahalli Village, and , Survey No. 202 measuring 3acre 20 guntas situated at Shivapura Village , Kasaba Hobli, Doddaballapura Taluk, Kasaba Hobli, Doddaballapura , Doddaballapura , Bengaluru Rural, Karnataka - 562163
- Village (RERA)
- guntas Tammashettahalli
- Locality
- Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 562163
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.29354, 77.56773
Distances to landmarks
Not found in public records yet: landmarksAbout Doddaballapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 18.04 km | approx. 73 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 27.87 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 35.07 km | approx. 142 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 38.68 km | approx. 157 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 42.92 km | approx. 174 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 50.47 km | approx. 204 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction14.35 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction16.69 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction18.96 km
- Chikkabidarakallu (ಚಿಕ್ಕಬಿದರಕಲ್ಲು)Open now — nearest operating metro station28.18 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station2.42 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 417 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 417 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 595 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,464 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
KBL Enclave - Phase 2 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plots (9 x 12) | — | 23 |
| Plots (10 x 9) | — | 6 |
| Plots (12 x 12) | — | 4 |
| Plots- odd site | — | 44 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
KBL Enclave - Phase 2 completion date and development status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-03-31.
Timeline
- 23 May 2023Project start date given to RERA
- 28 Mar 2024Registered with Karnataka RERA
- 31 Dec 2025Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Local Planing Authority · No. STRRPA/TP/LAO/38/2022-23 · dated 2023-01-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) | DC-BANGALORE RURAL · No. 271270 and 3 more · dated 2022-09-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/LAO/38/2022-23 · dated 31 Jan 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
KBL Enclave - Phase 2 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About L Kumar
- Promoter type
- Proprietorship
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
L Kumar’s RERA recordL Kumar delivery record
- 1Projects in Bengaluru on RERA1 approved registration under L Kumar in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 77Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 77 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2023
- 31 Mar 2026Quarterly update filed for Q3 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Mar 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/280324/006751); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 May 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2023Building plan approved by Local Planing Authority (No. STRRPA/TP/LAO/38/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
KBL Enclave - Phase 2 FAQs
What plot sizes are available in KBL Enclave - Phase 2?
The project has plots in three standard sizes: 30×40 (1,200 sq ft, 23 plots), 30×33 (990 sq ft, 6 plots), and 40×40 (1,600 sq ft, 4 plots). There are also 44 odd-sized plots.
How many plots are in KBL Enclave - Phase 2?
The project has 77 plots in total.
What is the RERA registration number for KBL Enclave - Phase 2?
The project is registered on RERA under registration number PRM/KA/RERA/1250/301/PR/280324/006751, registered on 28 March 2024.
When is KBL Enclave - Phase 2 scheduled to be completed?
The completion date is 31 December 2025.
Which authority approved the layout for KBL Enclave - Phase 2?
The layout was approved by the Local Planning Authority.
How many land conversion orders have been issued for KBL Enclave - Phase 2?
Four land conversion orders have been issued for the project.
What is the development status of KBL Enclave - Phase 2?
As of Q3 2025-26 (quarter ended 31 December 2025), the layout development is 100 percent complete.
Are there any RERA complaints against KBL Enclave - Phase 2 or its developer?
There are no RERA complaints on this project and no complaints against the developer L Kumar across all projects on record.
Where is KBL Enclave - Phase 2 located?
The project is in Guntas Tammashettahalli, Doddaballapura taluk, Bengaluru Rural district, PIN code 562163.
Which bank holds the escrow account for KBL Enclave - Phase 2?
ICICI Bank holds the escrow account for the project.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about KBL Enclave - Phase 2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from L Kumar? Review the developer.
Reviews of L Kumar by verified buyers
No verified reviews of L Kumar yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| LagosB&M Homes | 0.7 km | 298 | Dec 2027 | 90% | 0 | Not collected |
| Make BoroughIron Kore Private Limited | 3.1 km | 35 | Mar 2027 | 100% | 0 | Not collected |
| Sattva EkatraShirasa Construction Private Limited | 3.7 km | 503 | Mar 2029 | 12% | 0 | Not collected |
| 99d By SanthustaM/s. SANTHUSTA INFRACON Private Limited | 4.9 km | 99 | Jul 2028 | 72% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/301/PR/280324/006751.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 31 Mar 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Doddaballapur Road
Shivapura, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openLagos
by B&M Homes
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60 +2 more
- 1,049 – 14,272 sq ft plots
- Approved by Local Planning Authority
- Dec 2027
298 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Lagos
Kurubarahalli, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group open99d By Santhusta
by M/s. SANTHUSTA INFRACON
Price: Price on requestGet brochure & price →
- 30×40, 35×40, 35×46 +2 more
- 1,026 – 2,562 sq ft plots
- Approved by Doddaballapur Planning Authority
- Jul 2028
99 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for 99d By Santhusta
Konaghatta, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openWindsor Hillside
by Vihana Properties
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60
- 1,166 – 9,512 sq ft plots
- Approved by STRR Planning Authority
- Dec 2027
130 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Windsor Hillside