KBR Prime at a glance
- Possession (RERA)Mar 2029Karnataka RERA
- Construction98% built · on pace for Oct 2026RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked4 of 124 (3%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 10.53 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 79 min at peak19.39 km straight line · estimate
- Nearest lakeUnnamed lake · 1,582 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
KBR Prime is a residential project by KBR Homes India Private Limited in Kolathur, Bengaluru with 124 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2029.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
KBR Prime buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks KBR Homes India Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the KBR Prime buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 573 – 751 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 124
- Land
- 1.37 acres
- Possession (RERA)
- Mar 2029
- Built (RERA update)
- 98%
KBR Prime RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/031024/007112
- Registered on
- 3 Oct 2024
- Promised completion
- 31 Mar 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 4 of 124 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| KBR PRIME | 3 | 0 | 124 |
A dash (—) means the filing did not state that value.
Summary in plain English
KBR Homes India Private Limited is developing a residential project in Kolathur, Hosakote, with 124 homes in a single tower. The project completion date on RERA is 31 March 2029.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 50.8% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- INDIAN OVERSEAS BANK, NAGASHETTIHALLI
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. HOYOPRAA/CC/114/2023-24 · dated 11 May 2023
- Project cost declared to RERA
- ₹34.25 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
KBR Prime location and address
- Address
- E-KHATHA NO: 150300400100420385, (NO: 1273/1328/121/2), SY NO. 121/2 , KOLATHUR VILLAGE, KASABA HOBLI , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Kolathur
- Locality
- HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.06808, 77.82069
Distances to landmarks
Not found in public records yet: landmarksAbout Hoskote
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.68 km | approx. 51 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 19.39 km | approx. 79 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.87 km | approx. 89 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.05 km | approx. 89 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 28.99 km | approx. 117 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 29.57 km | approx. 120 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 2Hospitals and clinics2 hospitals, 0 clinics
Nearest schools and colleges
- M V Jayaram Medical College · 1.45 km
Nearest hospitals and clinics
- Mother and Child Hospital · 0.77 km
- Mvj Hospital · 1.41 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station10.53 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station9.29 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,582 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,582 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) (ಕೊಳತೂರು ಕೆರೆ)1,659 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,787 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
KBR Prime floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans3 files

Approved Layout PlanFull PDF on RERA 
Approved Building/Plotting PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 573 – 631 sq ft | 100 |
| 3 BHK | 573 – 751 sq ft | 24 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
KBR Prime possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 100 | 4 | 96 |
| 3 BHK | 24 | 0 | 24 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jan 2024Project start date given to RERA
- 3 Oct 2024Registered with Karnataka RERA
- 31 Mar 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2026 — about 29 months before the completion date on RERA (31 Mar 2029).
At the pace between the 4 quarterly filings we have (80% → 98% in 9 months), it would be around Oct 2026 — about 29 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 98% | 4 of 124 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 95% | 2 of 124 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 90% | 1 of 124 |
| Q3 2025-26to 31 Dec 2025 | 31 Mar 2026 | 80% | 1 of 124 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 98% ÷ 33 months (1 Jan 2024 to 30 Sep 2026) = 3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 2 ÷ 3 = 0.7 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (98% − 80%) ÷ 9 months = 2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
11 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. HOYOPRAA/CC/114/2023-24 · dated 2023-05-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC BENGALURU RURAL · No. ALN(HOKA).SR.46/2021-22 · dated 2022-01-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. HOYOPRAA/CC/114/2023-24 · dated 11 May 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
KBR Prime RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About KBR Homes India Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- U70102KA2012PTC064637
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
KBR Homes India Private Limited’s RERA recordKBR Homes India Private Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under KBR Homes India Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 172Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 172 homes in its 2 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 26.7 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| KBR Navarathna ResidencyOC on RERA | 25 Dec 2023 | 16 Mar 2026 | 27 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2023
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 98% built, 4 of 124 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 95% built, 2 of 124 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 90% built, 1 of 124 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Quarterly update filed for Q3 2025-26: 80% built, 1 of 124 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Oct 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/031024/007112); completion date 31 Mar 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2023Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. HOYOPRAA/CC/114/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
KBR Prime FAQs
When will the KBR Homes project in Kolathur be completed?
The project completion date on RERA is 31 March 2029.
How many homes are in the KBR Homes project in Kolathur?
The project has 124 homes.
What home types are available in the KBR Homes project in Kolathur?
The project has 24 three-bedroom homes (carpet area 573 to 751 sq ft) and 100 two-bedroom homes (carpet area 573 to 631 sq ft).
What is the RERA registration number for the KBR Homes project in Kolathur?
The RERA registration number is PRM/KA/RERA/1250/304/PR/031024/007112, registered on 3 October 2024.
Where is the KBR Homes project in Kolathur located?
The project is in Kolathur, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
What is the construction progress of the KBR Homes project in Kolathur?
As of Q2 2026-27, the project is 98 per cent complete.
How many homes are booked in the KBR Homes project in Kolathur?
As of Q2 2026-27, 4 homes are booked out of 124.
Are there any complaints against the KBR Homes project in Kolathur?
There are no RERA complaints on this project.
How many projects does KBR Homes India have in the Bengaluru RERA records?
KBR Homes India has 3 projects recorded in the Bengaluru RERA register.
Which bank manages the escrow for the KBR Homes project in Kolathur?
The escrow bank is Indian Overseas Bank.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about KBR Prime
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from KBR Homes India Private Limited? Review the builder.
Reviews of KBR Homes India Private Limited by verified buyers
No verified reviews of KBR Homes India Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sthitha Nature WalkSthitha Infra Private Limited | 1 km | 12 | Dec 2027 | 58% | 0 | Not collected |
| Rings AvenueVarasinduri Properties | 1.3 km | 144 | Mar 2029 | 85% | 0 | Not collected |
| Serene VillasVarasinduri Properties | 1.4 km | 10 | Dec 2028 | — | 0 | Not collected |
| Adarsh ParadiseA1 Builders | 1.4 km | 238 | Dec 2026 | 87% | 0 | Not collected |
| Sanjeevini AarnaSanjeevini Projects | 1.8 km | 224 | Sep 2027 | 66% | 0 | Not collected |
| Aakriti EmeraldAakriti Projects | 1.8 km | 130 | Aug 2028 | 51% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/031024/007112.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hoskote
Dandupalya, HoskoteUnder constructionRERA registeredBuyers’ group openSthitha Nature Walk
by Sthitha Infra
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,482 – 1,868 sq ft
- Dec 2027
12 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sthitha Nature Walk
Kolathuru, HoskoteUnder constructionRERA registeredBuyers’ group openRings Avenue
by Varasinduri Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 578 – 886 sq ft
- Mar 2029
144 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Rings Avenue
Kolathur, HoskoteUnder constructionRERA registeredBuyers’ group openSerene Villas
by Varasinduri Properties
Price: Price on requestGet brochure & price →
- 4 BHK
- 1,259 sq ft
- Dec 2028
10 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Serene Villas