KNS Anagha Phase - II
30×40, 30×50 plots by KNS Infrastructure Private Limited · Haragadde, Bengaluru
Haragadde, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Mar 2026; no extension or completion filed
- plotted
by KNS Infrastructure Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
KNS Anagha Phase - II at a glance
- Completion (RERA)Mar 2026 Date passedKarnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 6.64 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 197 min at peak48.53 km straight line · estimate
Project summary
KNS Anagha Phase - II is a plotted development by KNS Infrastructure Private Limited in Haragadde, Bengaluru with 69 plots, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2026.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
KNS Anagha Phase - II buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks KNS Infrastructure Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the KNS Anagha Phase - II buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 1,199 – 5,644 sq ft
- Total plots
- 69
- Layout approved by
- BBMP
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (RERA)
- Mar 2026
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 26 |
| 30×50 | 1,500 sq ft | 21 |
| Odd-sized (irregular) | varies | 22 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BBMP - Bruhat Bengaluru Mahanagara Palike.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 24/1 | Residential | No. ALN(AJ)/CR/68/2022-23, 3 Apr 2023 | Deputy commissioner Bangalore |
| 24/1 | Residential | No. ALN(AJ)SR:65/2022-23, 3 Apr 2023 | Deputy commissioner Bangalore |
| 29 | Residential | No. ALN(AJ)SR:02/2017-18, 17 Aug 2017 | Deputy commissioner Bangalore |
| 29 | Residential | No. ALN(AJ)SR:01/2017-18, 17 Aug 2017 | Deputy commissioner Bangalore |
| 24/3 | Residential | No. 505192, 5 Jul 2024 | Deputy Commissioner Bengaluru |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
KNS Anagha Phase - II RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/210524/006934
- Registered on
- 21 May 2024
- Promised completion
- 31 Mar 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
KNS Anagha Phase - II is a plotted layout by KNS Infrastructure Private Limited in Haragadde, Anekal taluk, Bengaluru Urban. The project has 69 plots and is registered with Karnataka RERA. It is scheduled for completion on 31 March 2026.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. APA/LAO/166/2022-23 · dated 2 Feb 2024
- Project cost declared to RERA
- ₹7.73 Cr
Amenities
KNS Anagha Phase - II location and address
- Address
- Sy.Nos.24/1, 24/2, 24/3 & 29(P) of HARAGADDE VILLAGE, JIGANI HOBLI, , ANEKAL TALUK, , Anekal , Bengaluru Urban, Karnataka - 560105
- Village (RERA)
- Haragadde
- PIN code
- 560105
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.76649, 77.65988
Distances to landmarks
Not found in public records yet: landmarksAbout Haragadde
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 9.27 km | approx. 38 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 17.63 km | approx. 71 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.49 km | approx. 103 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 26 km | approx. 105 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 31.62 km | approx. 128 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 48.53 km | approx. 197 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station6.64 km
- Anekal Road (ಆನೇಕಲ್ ರಸ್ತೆ)Nearest railway station7.27 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
KNS Anagha Phase - II layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plots (9.14 x 12.14 meter) | — | 26 |
| Plots (9.14 x 15.24 meter) | — | 21 |
| Plots (odd) | — | 22 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
KNS Anagha Phase - II completion date and development status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-09.
Timeline
- 5 Mar 2024Project start date given to RERA
- 21 May 2024Registered with Karnataka RERA
- 31 Mar 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. APA/LAO/166/2022-23 · dated 2024-02-02 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) | Deputy commissioner Bangalore · No. ALN(AJ)/CR/68/2022-23 and 4 more · dated 2024-07-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. APA/LAO/166/2022-23 · dated 2 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
KNS Anagha Phase - II RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About KNS Infrastructure Private Limited
- Promoter type
- Company
- Projects on this site
- 3
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45201KA2007PTC044230
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
KNS Infrastructure Private Limited’s RERA recordKNS Infrastructure Private Limited delivery record
- 3Projects in Bengaluru on RERA4 approved registrations under KNS Infrastructure Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 225Plots registeredAs stated in 3 of the 4 registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 225 plots in its 4 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| KNS Aadrika | 16 Jan 2025 | 26 Mar 2024 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 9 Apr 2026Quarterly update filed for Q4 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Jan 2026Quarterly update filed for Q3 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/210524/006934); completion date 31 Mar 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Feb 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. APA/LAO/166/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
KNS Anagha Phase - II FAQs
What plot sizes are available in KNS Anagha Phase - II?
The project has plots in two standard sizes: 30×40 feet (1,200 sq ft, 26 plots) and 30×50 feet (1,500 sq ft, 21 plots). There are also 22 odd-sized plots; their exact sizes are not in the RERA record.
How many plots are in KNS Anagha Phase - II?
The project has 69 plots in total.
Which authority approved the layout of KNS Anagha Phase - II?
The layout was approved by BBMP (Bruhat Bengaluru Mahanagara Palike).
How many land conversion orders are there for KNS Anagha Phase - II?
There are 5 land conversion orders for the project.
What is the RERA registration number for KNS Anagha Phase - II?
The project's RERA registration number is PRM/KA/RERA/1251/308/PR/210524/006934, registered on 21 May 2024.
When will KNS Anagha Phase - II be completed?
The project is scheduled for completion on 31 March 2026 according to the RERA record.
What is the development progress of KNS Anagha Phase - II?
As of the latest quarterly update for Q4 2025-26, the layout is 100% developed.
How many complaints have been filed against KNS Anagha Phase - II on RERA?
There are no RERA complaints on this project.
What is KNS Infrastructure Private Limited's record on RERA?
The developer has 16 projects on record in our Bengaluru RERA database and no complaints against it on any project.
Where is KNS Anagha Phase - II located?
The project is in Haragadde, Anekal taluk, Bengaluru Urban district, with PIN code 560105.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about KNS Anagha Phase - II
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from KNS Infrastructure Private Limited? Review the developer.
Reviews of KNS Infrastructure Private Limited by verified buyers
No verified reviews of KNS Infrastructure Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Profound Lake FrontM/S ProfoundDevelopers | 0.4 km | 61 | Dec 2028 | 100% | 0 | Not collected |
| KBR EstatesKBR Infratech Limited | 1.4 km | 99 | Mar 2030 | 90% | 0 | Not collected |
| Sterlitee Regal ParkSterlitee Developers LLP | 1.6 km | 251 | Dec 2028 | 100% | 0 | Not collected |
| Aashrithaa DivineAashrithaa Properties Private Limited | 2 km | 286 | Dec 2028 | — | 0 | Not collected |
| Prestige King's CountyPrestige Acres Private Limited | 2 km | 875 | Oct 2026extended | 73% | 0 | Not collected |
| JR Club ClassJR Housing Developers Pvt Ltd | 2.1 km | 73 | Nov 2028 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/210524/006934.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 9 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Seethanayakanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Profound Lake Front
by M/S ProfoundDevelopers
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 824 – 8,828 sq ft plots
- Approved by BMRDA
- Dec 2028
61 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Profound Lake Front
Rajapura, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openKBR Estates
by KBR Infratech
Price: Price on requestGet brochure & price →
- 35×40, 30×50, 35×50
- 713 – 2,696 sq ft plots
- Approved by Anekal Planning Authority
- Mar 2030
99 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KBR Estates
Hulimangala, BommasandraUnder constructionRERA registeredBuyers’ group openSterlitee Regal Park
by Sterlitee
Price: Price on requestGet brochure & price →
- 20×40, 30×50, 35×50 +3 more
- 593 – 44,677 sq ft plots
- Approved by BDA
- Dec 2028
251 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sterlitee Regal Park