Mana Capitol

1, 2 & 3 BHK mixed-use project by D kishore reddy · Sarjapur Road, Bengaluru

Sarjapur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Sep 2026; no extension or completion filed
  • mixed

by D kishore reddy

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Mana Capitol

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Mana Capitol is a mixed-use project by D kishore reddy in Bengaluru with 1,087 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2026. It is registered in 2 phases.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Mana Capitol buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks D kishore reddy for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Mana Capitol buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 18 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK
Carpet area
432 – 21,334 sq ft
Towers
5
Floors
18
Total homes
1,087
Land
4.75 acres
Possession (extended)
Sep 2026
Built (RERA update)
Not found in public records yet: construction progress

Mana Capitol RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/200109/003144
Registered on
9 Jan 2020
Promised completion
30 Jun 2026
Extended to
30 Sep 2026
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Mixed

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Tower 1 & 2PRM/KA/RERA/1251/446/PR/200109/00314430 Dec 2025Extended to 30 Sep 2026584New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Tower 3,4 & 5PRM/KA/RERA/1251/446/PR/200113/00315430 Jun 2026503New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Tower - 1Tower 1 & 2182145
Tower -2Tower 1 & 2182145
Tower 3Tower 3,4 & 5172142
Tower 4Tower 3,4 & 5172142
Tower 5Tower 3,4 & 5182123

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Mana Capitol is a mixed-use residential project by D Kishore Reddy in Bengaluru East (560032) with 1,087 homes across 5 towers in 2 phases. Tower 1 & 2 is registered for 584 homes with completion by 30 September 2026, while Tower 3, 4 & 5 is registered for 503 homes with completion by 30 June 2026.

Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Tower 1 & 2
HDFC, kadubesanahalli
Escrow bank (RERA) · Tower 3,4 & 5
HDFC, kadubeesanhalli branch

Amenities

Not found in public records yet: amenities

Mana Capitol location and address

Address
Sy. No. 31/1, Chikkannelli, Varthur Hobli, , Sarjapura Main Road, Bangalore East
Village (RERA)
Not found in public records yet: village
Locality
Sarjapur RoadAlso known as Sarjapura Road, Sarjapur Main Road, Sarjapura Main Road
PIN code
560032
City
Bengaluru
State
Karnataka
Coordinates
12.90190, 77.70339

Distances to landmarks

Not found in public records yet: landmarks

About Sarjapur Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)3.41 kmapprox. 14 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)7.15 kmapprox. 29 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)10.24 kmapprox. 41 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)16.8 kmapprox. 68 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)18.61 kmapprox. 75 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)33.23 kmapprox. 135 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 20Schools and colleges15 schools, 4 colleges, 1 kindergartens
  • 9Hospitals and clinics4 hospitals, 5 clinics

Nearest schools and colleges

  • Sapthagiri Vidya Mandir · 0.58 km
  • Little Millennium · 0.64 km
  • NPS East, Sarjapur · 1 km

Nearest hospitals and clinics

  • A & J Ayur Care · 0.91 km
  • Kodathi Primary Health Centre · 0.93 km
  • Dr. Amrika's Aesthetics · 0.98 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction3.78 km
  • Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction3.81 km
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.85 km
  • Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station6.5 km
  • Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station0.66 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Chikkabelanduru Kere, 981 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Mana Capitol home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Mana Capitol

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK432 – 433 sq ft72
2 BHK638 – 717 sq ft365
3 BHK917 – 1,116 sq ft242
Duplex1,944 – 1,985 sq ft6
Duplex (in 4th floor)21,054 sq ft1
Duplex(in 4th floor)21,334 sq ft1
Duplex(in 10th floor)21,054 – 21,334 sq ft2
Duplex(in 16th floor)21,054 – 21,334 sq ft2
Residential apartments715 sq ft96
Residential/apartments748 sq ft300

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Mana Capitol possession date and construction status

  • Tower 1 & 2100%

    as on · 212 of 584 homes booked

  • Tower 3,4 & 599%

    as on · 311 of 503 homes booked

Timeline

  1. 16 Dec 2019Tower 1 & 2: Project start date given to RERA
  2. 25 Dec 2019Tower 3,4 & 5: Project start date given to RERA
  3. 9 Jan 2020Tower 1 & 2: Registered with Karnataka RERA
  4. 13 Jan 2020Tower 3,4 & 5: Registered with Karnataka RERA
  5. 30 Dec 2025Tower 1 & 2: Completion date given at registration
  6. 30 Jun 2026Tower 3,4 & 5: Completion date given at registration
  7. 30 Sep 2026Tower 1 & 2: Covid Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

ApprovalAuthoritySource
Building plan (Tower 1 & 2)BDA - Bangalore Development AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Tower 3,4 & 5)BDA - Bangalore Development AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Tower 1 & 2)

As on 18 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Mana Capitol RERA complaints and orders

1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01032/202521 Aug 2025Persistent construction defects, pest infestation, and prolonged inaccessibility of washroom in Flat No. 1807, Tower 2 – Mana Capitol.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About D kishore reddy

Promoter type
Not found in public records yet: promoter type
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

D kishore reddy’s RERA record

D kishore reddy delivery record

As on 18 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Dec 2019

As on 18 Oct 2026
  1. 30 Sep 2026Tower 1 & 2: Completion date extended to 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Tower 1 & 2: Quarterly update filed for Q1 2026-27: 100% built, 212 of 290 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Jul 2026Tower 3,4 & 5: Quarterly update filed for Q4 2025-26: 99% built, 311 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 29 Jun 2026Tower 1 & 2: Quarterly update filed for Q4 2025-26: 100% built, 212 of 290 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 20 Feb 2026Tower 1 & 2: Quarterly update filed for Q3 2025-26: 100% built, 212 of 290 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 19 Feb 2026Tower 3,4 & 5: Quarterly update filed for Q3 2025-26: 99% built, 311 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 21 Aug 2025Complaint 01032/2025 filed with RERA: “Persistent construction defects, pest infestation, and prolonged inaccessibility of washroom in Flat No. 1807, Tower 2 – Mana Capitol.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 13 Jan 2020Tower 3,4 & 5: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200113/003154); completion date 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 9 Jan 2020Tower 1 & 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200109/003144); completion date 30 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 25 Dec 2019Tower 3,4 & 5: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 16 Dec 2019Tower 1 & 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Mana Capitol FAQs

What is the completion date for Mana Capitol Tower 1 & 2?

The current completion date on RERA is 30 September 2026. This was extended from the original 30 December 2025 due to Covid Extension.

What is the completion date for Mana Capitol Tower 3, 4 & 5?

The current completion date on RERA is 30 June 2026, with a Covid Extension noted in the record.

How many homes are in Mana Capitol?

There are 1,087 homes total: 584 homes in Tower 1 & 2 and 503 homes in Tower 3, 4 & 5.

What home types are available in Mana Capitol?

Tower 1 & 2 offers 1 BHK (432 sq ft), 2 BHK (638-667 sq ft), 3 BHK (917-991 sq ft), apartments (748 sq ft) and duplexes (1,944-1,985 sq ft). Tower 3, 4 & 5 offers 1 BHK (432-433 sq ft), 2 BHK (664-717 sq ft), 3 BHK (917-1,116 sq ft), apartments (715 sq ft) and duplexes (21,054-21,334 sq ft).

What is the construction progress of Mana Capitol?

Tower 1 & 2 is 100% complete as of Q1 2026-27, and Tower 3, 4 & 5 is 99% complete as of Q4 2025-26.

How many homes have been booked in Mana Capitol?

In Tower 1 & 2, 212 homes are booked as of Q1 2026-27. In Tower 3, 4 & 5, 311 homes are booked as of Q4 2025-26.

What are the RERA registration numbers for Mana Capitol?

Tower 1 & 2 is registered as PRM/KA/RERA/1251/446/PR/200109/003144 (registered 9 January 2020). Tower 3, 4 & 5 is registered as PRM/KA/RERA/1251/446/PR/200113/003154 (registered 13 January 2020).

Are there any RERA complaints against Mana Capitol?

There is 1 complaint on the Mana Capitol project record and 1 complaint against builder D Kishore Reddy across all projects.

Where is Mana Capitol located?

Mana Capitol is located in Bengaluru East taluk, Bengaluru Urban district, with PIN code 560032.

How many towers does Mana Capitol have?

Mana Capitol has 5 towers: 2 towers in Tower 1 & 2 phase and 3 towers in Tower 3, 4 & 5 phase, each with a maximum of 18 floors.

Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Mana Capitol

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from D kishore reddy? Review the builder.

Reviews of D kishore reddy by verified buyers

No verified reviews of D kishore reddy yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/200109/003144, PRM/KA/RERA/1251/446/PR/200113/003154.

  • RERA record last checked: 18 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error