Merusri Swamy Orchards
30×45, 30×50 +2 more plots by Merusri Developers · Rayasandra, Devanahalli, Bengaluru
Rayasandra, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Merusri Swamy Orchards at a glance
- Completion (RERA)Mar 2030Karnataka RERA
- Construction99% built · on pace for Oct 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroKIAL Terminals · 3.74 km (under construction)Open now: Krishnarajapura, 26.1 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 15 min at peak3.81 km straight line · estimate
- Nearest lakeUnnamed lake · 531 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Merusri Swamy Orchards is a plotted development by Merusri Developers in Rayasandra, Bengaluru with 119 plots, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Merusri Swamy Orchards buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Merusri Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Merusri Swamy Orchards buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×45, 30×50, 35×45, 35×50
- Plot area
- 1,170 – 6,971 sq ft
- Total plots
- 119
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 3
- Completion (RERA)
- Mar 2030
- Development (RERA update)
- 99%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×45 | 1,350 sq ft | 2 |
| 30×50 | 1,500 sq ft | 2 |
| 35×45 | 1,575 sq ft | 66 |
| 35×50 | 1,750 sq ft | 21 |
| Odd-sized (irregular) | varies | 27 |
| Commercial | — | 1 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 38/2 | Residential | No. 544306, 1 Dec 2023 | DC BENGALURU RURAL |
| 38/3 | Residential and Commercial | No. 544035, 23 Nov 2023 | DC BENGALURU RURAL |
| 38/4 | Residential | No. 544033, 23 Nov 2023 | DC BENGALURU RURAL |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Merusri Swamy Orchards RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/160824/006974
- Registered on
- 16 Aug 2024
- Promised completion
- 31 Mar 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Merusri Swamy Orchards is a plotted layout of 119 plots by Merusri Developers in Rayasandra, Devanahalli, Bengaluru Rural. The layout, approved by BMRDA, is planned for completion on 31 March 2030.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, MG ROAD
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/LAO/29/2023-24 · dated 18 Apr 2024
- Project cost declared to RERA
- ₹33.3 Cr
Amenities
Merusri Swamy Orchards location and address
- Address
- SY NO.S: 38/2, 38/3, 38/4, RAYASANDRA VILLAGE , KASABA HOBLI , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Rayasandra
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.23073, 77.72148
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 3.81 km | approx. 15 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.09 km | approx. 94 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.09 km | approx. 110 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 32.55 km | approx. 132 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 34.42 km | approx. 139 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 42.81 km | approx. 173 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 5Schools and colleges4 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Brigade Orchard School · 0.16 km
- Akash Institute of Medical Sciences · 1.37 km
- Akash International School · 1.37 km
Nearest hospitals and clinics
- Sri Shirdi Sai Hospital · 1.84 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction3.74 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.19 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction9.56 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station26.1 km
- Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station2.55 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 531 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 531 m
- Bettakote Lake on OpenStreetMap (opens in a new tab) (ಬೆಟ್ಟಕೋಟೆ ಕೆರೆ)1,311 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Merusri Swamy Orchards layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14m * 13.71m | — | 2 |
| Plot 9.14 m × 15.24 m | — | 2 |
| 10.67m * 13.71m | — | 66 |
| 10.67m * 15.24m | — | 21 |
| Commercial | — | 1 |
| Odd | — | 27 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Merusri Swamy Orchards completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 1 Jul 2024Project start date given to RERA
- 16 Aug 2024Registered with Karnataka RERA
- 31 Mar 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2026 — about 42 months before the completion date on RERA (31 Mar 2030).
At the pace between the 4 quarterly filings we have (28% → 99% in 9 months), it would be around Oct 2026 — about 42 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 99% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 89% | — |
| Q4 2025-26to 31 Mar 2026 | 9 Jun 2026 | 67% | — |
| Q3 2025-26to 31 Dec 2025 | 9 Mar 2026 | 28% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 99% ÷ 27 months (1 Jul 2024 to 30 Sep 2026) = 3.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 1 ÷ 3.7 = 0.3 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (99% − 28%) ÷ 9 months = 7.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/LAO/29/2023-24 · dated 2024-04-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | DC BENGALURU RURAL · No. 544306 and 2 more · dated 2023-12-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/LAO/29/2023-24 · dated 18 Apr 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Merusri Swamy Orchards RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Merusri Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 6
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Merusri Developers’s RERA recordMerusri Developers delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Merusri Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 185Plots registeredAs stated in each registrations.
- 6RERA complaints0 open, 6 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 32.4Complaints per 1,000 plots6 complaints ÷ 185 plots in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
6 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 99% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 89% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jun 2026Quarterly update filed for Q4 2025-26: 67% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Mar 2026Quarterly update filed for Q3 2025-26: 28% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Aug 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/160824/006974); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2024Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. STRRPA/TP/LAO/29/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Merusri Swamy Orchards FAQs
What plot sizes are available in Merusri Swamy Orchards?
The layout has plots in sizes 35×45 sq ft (66 plots), 35×50 sq ft (21 plots), 30×45 sq ft (2 plots), 30×50 sq ft (2 plots), and 27 odd-sized plots. There is also 1 commercial plot. Exact sizes of odd-sized plots are not in the RERA record.
How many plots are in Merusri Swamy Orchards?
The layout has 119 plots total: 66 plots of 35×45, 21 plots of 35×50, 2 plots of 30×45, 2 plots of 30×50, 27 odd-sized plots, and 1 commercial plot.
What is the RERA registration number for Merusri Swamy Orchards?
The RERA registration number is PRM/KA/RERA/1250/303/PR/160824/006974, registered on 16 August 2024.
When is Merusri Swamy Orchards completion date?
The completion date on RERA is 31 March 2030.
What is the development progress of Merusri Swamy Orchards?
As of Q2 2026-27 (ended 30 September 2026), the layout is 99% developed.
Who approved the layout for Merusri Swamy Orchards?
The layout was approved by BMRDA (Bengaluru Metropolitan Region Development Authority).
How many land conversion orders are there for Merusri Swamy Orchards?
There are 3 land conversion orders for the project.
Are there any RERA complaints on Merusri Swamy Orchards?
There are no RERA complaints on this project.
Where is Merusri Swamy Orchards located?
The project is in Rayasandra, Devanahalli taluk, Bengaluru Rural district, PIN code 562110.
What is Merusri Developers' record on RERA?
Merusri Developers has 6 projects in the Bengaluru RERA record and 6 RERA complaints against the developer across all projects.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Merusri Swamy Orchards
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Merusri Developers? Review the developer.
Reviews of Merusri Developers by verified buyers
No verified reviews of Merusri Developers yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Hare Krishna Enclave at Rajani FarmsHare Krishna Villas | 0.5 km | 93 | Apr 2025 | 100% | 0 | Not collected |
| Maharaja Ikon ParkSamvir Estates Limited Liability Partnership | 0.6 km | 135 | May 2026 | — | 0 | Not collected |
| Niva EarthscapeGogineni Kamalendra Kumar | 0.6 km | 135 | Mar 2027 | — | 0 | Not collected |
| Classic Merusri Canaan Phase - IIMerusri Developers | 0.7 km | 66 | Dec 2030 | 64% | 0 | Not collected |
| Merusri Sienna IIMerusri Estate Holdings Private Limited | 1.2 km | 113 | Dec 2031 | 22% | 0 | Not collected |
| Merusri Sienna 1Merusri Sienna Developers Private Limited | 1.3 km | 107 | Dec 2031 | 17% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/160824/006974.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openHare Krishna Enclave at Rajani Farms
by Hare Krishna Villas
Price: Price on requestGet brochure & price →
- 30×40
- 98 – 1,499 sq ft plots
- Approved by Local Planning Authority
- Apr 2025
RERA not updated since promised Apr 2025 · 93 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Hare Krishna Enclave at Rajani Farms- Devanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Maharaja Ikon Park
by Samvir Estates Limited Liability Partnership
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 33×50
- 1,148 – 12,153 sq ft plots
- Approved by BIAAPA
- May 2026
135 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Maharaja Ikon Park - Devanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Niva Earthscape
by Gogineni Kamalendra Kumar
Price: Price on requestGet brochure & price →
- 30×50, 40×60
- 802 – 4,408 sq ft plots
- Approved by BIAAPA
- Mar 2027
135 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Niva Earthscape