Pavani Heights
3 BHK apartments by Anjani Constructions · Horamavu, Bengaluru
Horamavu, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Pavani Heights at a glance
- Possession (RERA)Jun 2027 ExtendedWas Jun 2026 · Karnataka RERA
- Construction50% built · on pace for Jun 2031 48 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked0 of 111 (0%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroHoramavu · 0.83 km (under construction)Open now: Benniganahalli, 3.19 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 82 min at peak20.13 km straight line · estimate
- Nearest lakeUnnamed lake · 386 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Pavani Heights is a residential project by Anjani Constructions in Horamavu, Bengaluru with 111 homes, registered with Karnataka RERA. The completion date on RERA is 23 Jun 2027.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Pavani Heights buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Anjani Constructions for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Pavani Heights buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK
- Carpet area
- 775 – 1,102 sq ft
- Towers
- 1
- Floors
- 7
- Total homes
- 111
- Land
- 1.52 acres
- Possession (extended)
- Jun 2027
- Built (RERA update)
- 50%
Pavani Heights RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/240822/005177
- Registered on
- 24 Aug 2022
- Promised completion
- 23 Jun 2026
- Extended to
- 23 Jun 2027
- RERA status
- New launch
- Homes booked
- 0 of 111 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER | 7 | 1 | 111 |
A dash (—) means the filing did not state that value.
Summary in plain English
Pavani Heights is a residential project by Anjani Constructions in Horamavu, Bengaluru East, with 111 homes across one 7-storey tower. The project is registered with RERA and scheduled for completion on 23 June 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 67.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Union Bank of India, chamrajpet
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.dir/JD NORTH/0042/19-20 · dated 10 Dec 2019
- Project cost declared to RERA
- ₹74.27 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Pavani Heights location and address
- Address
- SY NO 57/2A , HORAMAVU VILLAGE , Bengaluru East , Bengaluru Urban, Karnataka - 560043
- Village (RERA)
- Horamavu
- Locality
- HoramavuAlso known as Horamavu Agara
- PIN code
- 560043
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.02453, 77.66194
Distances to landmarks
Not found in public records yet: landmarksAbout Horamavu
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 5.26 km | approx. 21 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 9.18 km | approx. 37 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 11.26 km | approx. 46 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.4 km | approx. 46 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 19.45 km | approx. 79 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.13 km | approx. 82 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 36Schools and colleges30 schools, 4 colleges, 2 kindergartens
- 62Hospitals and clinics31 hospitals, 31 clinics
Nearest schools and colleges
- Sri Chaitanya PU College, Horamavu · 0.61 km
- Sri Chaitanya School · 0.63 km
- Devamata Central School · 0.67 km
Nearest hospitals and clinics
- Arjun's Child Care Clinic · 0.21 km
- Nava Chaithanya Clinic · 0.24 km
- People's Clinic · 0.35 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Horamavu (ಹೊರಮಾವು)Blue Line metro, under construction0.83 km
- HRBR Layout (ಎಚ್ಆರ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction1.59 km
- Kasturinagara (ಕಸ್ತೂರಿನಗರ)Blue Line metro, under construction1.84 km
- Benniganahalli (ಬೆನ್ನಿಗಾನಹಳ್ಳಿ)Open now — nearest operating metro station3.19 km
- Channasandra (ಚನ್ನಸಂದ್ರ)Nearest railway station1.41 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lines under construction near here
- 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Horamavu, about 0.83 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)
Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 386 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 386 m
- Horamavu Lake on OpenStreetMap (opens in a new tab) (ಹೊರಮಾವು ಕೆರೆ)449 m
- Horamavu Agara Lake on OpenStreetMap (opens in a new tab) (ಹೊರಮಾವು ಅಗರ ಕೆರೆ)967 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Pavani Heights floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure4 pages

BrochureFull PDF on RERA 


Floor plans

Area Development Plan Of Project AreaFull PDF on RERA
Elevations

PAVANI HEIGHTS - ELEVATION DRAWINGFiled 16 Jun 2022 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 775 – 1,102 sq ft | 111 |
| 3 BHK flats | 940 sq ft | 111 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Pavani Heights possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 111 | 0 | 111 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 18 Jan 2022Project start date given to RERA
- 24 Aug 2022Registered with Karnataka RERA
- 23 Jun 2026Completion date given at registration
- 23 Jun 2027Section 6 Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2031 — about 48 months after the completion date on RERA (23 Jun 2027).
At the pace between the 4 quarterly filings we have (42% → 50% in 9 months), it would be around Jun 2031 — about 47 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 50% | 0 of 111 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 48% | 0 of 111 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 45% | 0 of 111 |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 42% | 0 of 111 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 50% ÷ 56.4 months (18 Jan 2022 to 30 Sep 2026) = 0.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 50 ÷ 0.9 = 56.4 months → Jun 2031. This is an estimate, not a date from the builder or RERA.
Pace between filings = (50% − 42%) ÷ 9 months = 0.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.dir/JD NORTH/0042/19-20 · dated 2019-12-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DISTRICT OFFICER · No. ALN(E)/SR(KH)/164/10-11 · dated 2011-03-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.dir/JD NORTH/0042/19-20 · dated 10 Dec 2019
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Pavani Heights RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Anjani Constructions
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Anjani Constructions’s RERA recordAnjani Constructions delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Anjani Constructions in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 111Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 111 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2019
- 23 Jun 2027Completion date extended to 23 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 50% built, 0 of 111 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 48% built, 0 of 111 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 45% built, 0 of 111 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 42% built, 0 of 111 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Aug 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/240822/005177); completion date 23 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Jan 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Dec 2019Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.dir/JD NORTH/0042/19-20) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Pavani Heights FAQs
When will Pavani Heights be completed?
The project is scheduled for completion on 23 June 2027, as per the RERA registration. This date includes a Section 6 Extension from the original completion date of 23 June 2026.
What is the RERA registration number for Pavani Heights?
The RERA registration number is PRM/KA/RERA/1251/446/PR/240822/005177, registered on 24 August 2022.
How many homes are in Pavani Heights?
The project has 111 homes across a single tower.
What home types are available in Pavani Heights?
The project offers 3 BHK homes with carpet area ranging from 775 sq ft to 1,102 sq ft.
What is the construction progress of Pavani Heights?
As of Q2 2026-27 (ended 30 September 2026), construction is 50% complete, with 0 homes booked and 111 homes available in the booking table.
Where is Pavani Heights located?
The project is in Horamavu, Bengaluru East taluk, with PIN code 560043.
Are there any RERA complaints against Pavani Heights?
No complaints have been filed against this project on RERA.
Are there any RERA complaints against Anjani Constructions?
No complaints have been filed against Anjani Constructions across all their projects on RERA.
How many other projects does Anjani Constructions have on record?
Anjani Constructions has 2 projects recorded in the RERA Bengaluru register, including Pavani Heights.
Who is the escrow bank for Pavani Heights?
Union Bank of India is the escrow bank for the project.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Pavani Heights
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Anjani Constructions? Review the builder.
Reviews of Anjani Constructions by verified buyers
No verified reviews of Anjani Constructions yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| The Golden Gate HouseSamyuktha Shelters | 1 km | 36 | May 2027 | 63% | 0 | Not collected |
| S K DwarakaS K Builders And Developers Inc | 1.5 km | 156 | Jun 2026extended | 96% | 0 | Not collected |
| Sathvik SignatureSurineni Infra | 1.6 km | 100 | Dec 2029 | — | 0 | Not collected |
| Sri Gayathri AvenueSDR Constructions | 1.8 km | 40 | Sep 2025 | — | 0 | Not collected |
| Shreevari SannidhiShreevari Constructions | 1.8 km | 40 | Sep 2025 | — | 0 | Not collected |
| Nava VajraNava Jyothi Shelters Private Limited | 1.8 km | 388 | Mar 2028 | 88% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/240822/005177.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Horamavu
HoramavuUnder constructionRERA registeredBuyers’ group openThe Golden Gate House
by Samyuktha Shelters
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 744 – 1,119 sq ft
- May 2027
36 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for The Golden Gate House
Horamavu Agara, HoramavuUnder constructionRERA registeredBuyers’ group openS K Dwaraka
by S K Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 668 – 1,176 sq ft
- Jun 2026 (extended)
RERA not updated since promised Jun 2026 · 156 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for S K Dwaraka
Kalkere, HoramavuUnder constructionRERA registeredBuyers’ group openSri Gayathri Avenue
by SDR Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 549 – 884 sq ft
- Sep 2025
RERA not updated since promised Sep 2025 · 40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Gayathri Avenue