Prestige Marigold
30×40, 30×50 +2 more plots by Ace Realty Ventures · Maragondanahalli, Bommasandra, Bengaluru
Maragondanahalli, Bommasandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Prestige Marigold at a glance
- Completion (RERA)Nov 2027Karnataka RERA
- Construction67% built · on pace for Feb 2027RERA filing to 30 Sep 2026 (Phase II); estimate from average pace
- RERA complaints (project)1 complaintKarnataka RERA · as on 17 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroDoddajala · 6.9 km (under construction)Open now: Dasarahalli, 18.97 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 54 min at peak13.26 km straight line · estimate
- Nearest lakeUnnamed lake · 1,358 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Prestige Marigold is a plotted development by Ace Realty Ventures in Maragondanahalli, Bengaluru with 1,114 plots, registered with Karnataka RERA. The completion date on RERA is 30 Nov 2027. It is registered in 2 phases.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Prestige Marigold buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Ace Realty Ventures for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Prestige Marigold buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50, 40×60, 50×80
- Plot area
- 826 – 2,18,944 sq ft
- Total plots
- 1,114
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 88
- Completion (RERA)
- Nov 2027
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 231 |
| 30×50 | 1,500 sq ft | 286 |
| 40×60 | 2,400 sq ft | 239 |
| 50×80 | 4,000 sq ft | 67 |
| Odd-sized (irregular) | varies | 290 |
| Commercial | — | 1 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
88 rows: land conversion orders. Scroll inside the table to see them all.
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase I | 14/1 | Residential | No. LNDC 10000029, 19 Jun 2018 | DC, Bangalore Rural |
| Phase I | 14/2 | Residential | No. DC, Bangalore Rural, 19 Jun 2018 | DC, Bangalore Rural |
| Phase I | 15 | Residential | No. LNDC 10000024, 19 Jun 2018 | DC, Bangalore Rural |
| Phase I | 16/1 and 16/2 | Residential | No. LNDC 10000001, 19 Jun 2018 | DC, Bangalore Rural |
| Phase I | 17 | Residential | No. ALN SR 133/05-06, 16 Jul 2005 | Dc, Bangalore Rural |
| Phase I | 145 | Residential | No. ALN SR 96/13-14, 14 Jul 2015 | DC, Bangalore Rural |
| Phase I | 188/1 | Residential | No. ALN SR 33/14-15, 16 May 2016 | Dc, Bangalore Rural |
| Phase I | 188/4 | Residential | No. 47620, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 188/5 | Residential | No. 47619, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 188/6 | Residential | No. 47159, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 189/1 | Residential | No. ALN SR 44/14-15, 13 Jun 2021 | DC, Bangalore Rural |
| Phase I | 189/7 | Residential | No. No 47617, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 189/8 | Residential | No. No 47615, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 190/3 | Residential | No. No 47627, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 190/3 | Residential | No. No 47628, 4 Dec 2019 | DC, Bangalore Rural |
| Phase I | 190/8 | Residential | No. ALN SR 8/17-18, 7 Sep 2017 | DC, Bangalore Rural |
| Phase I | 194/1 | Residential | No. 47624, 4 Dec 2019 | Dc, Bangalore Rural |
| Phase I | 194/2 | Residential | No. 50144, 4 Dec 2019 | Dc, Bangalore Rural |
| Phase I | 194/4 | Residential | No. ALN SR 7/17-18, 7 Sep 2017 | DC, Bangalore Rural |
| Phase I | 194/7 | Residential | No. 47622, 4 Dec 2019 | Dc, Bangalore Rural |
| Phase II | 8/1 | Residential | No. ALN(DE.ku)SR:04/2016-17, 9 Aug 2016 | Deputy Commissioner |
| Phase II | 8/4 | Residential | No. ALN (De.Ku) SR:04/2016-17, 9 Aug 2016 | Deputy Commissioner |
| Phase II | 9/1 | Residential | No. No.742597, 12 May 2025 | Deputy Commissioner |
| Phase II | 9/2 | Residential | No. No.742591, 12 May 2025 | Deputy Commissioner |
| Phase II | 9/3 | Residential | No. ALN (De.Ku) SR:03/2016-17, 9 Aug 2016 | Deputy Commissioner |
| Phase II | 9/4 | Residential | No. No.742598, 12 May 2025 | Deputy Commisioner |
| Phase II | 9/5 | Residential | No. No.742593, 12 May 2025 | Deputy Commissioner |
| Phase II | 9/6 (Old No.9/1) | Residential | No. No.742596, 12 May 2025 | Deputy Commissioner |
| Phase II | 9/7 (Old No.9/1) | Residential | No. No.742594, 12 May 2025 | Deputy Commissioner |
| Phase II | 9/8 | Residential | No. BIAAPA/TP/BhuHUBa/43/2021-22/23-24/1040, 8 Aug 2023 | BIAAPA |
| Phase II | 9/9 (Old 9/3) | Residential | No. ALN (De.Ku) SR:01/2016-17, 9 Aug 2016 | Deputy Commissioner |
| Phase II | 10 (p)153 | Residential | No. No.543107, 1 Dec 2024 | Deputy Commissioner |
| Phase II | 10(1)156 | Residential | No. No.540706, 29 Dec 2022 | Deputy Commissioner |
| Phase II | 10(2)155 | Residential | No. No.540228, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 12/1 | Residential | No. No.629268, 22 Jul 2024 | Deputy Commissioner |
| Phase II | 12/2 | Residential | No. No.540229, 30 Jul 2024 | Deputy Commissioner |
| Phase II | 12/3 | Residential | No. No.540230, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 12/4 | Residential | No. No.540231, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 12/5 | Residential | No. No.742613, 12 May 2025 | Deputy Commissioner |
| Phase II | 13/1 | Residential | No. No.540232, 17 Jan 2024 | Deputy Commissioner |
| Phase II | 13/2 | Residential | No. N.540233, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 13/3 | Residential | No. No.540234, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 13/4 | Residential | No. No.540236, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 13/6 | Residential | No. No.540237, 5 Jul 2024 | Deputy Commissioner |
| Phase II | 13/7 | Residential | No. No.742600, 12 May 2025 | Deputy Commissioner |
| Phase II | 13/8 | Residential | No. No.742601, 12 May 2025 | Deputy Commissioner |
| Phase II | 139/9 | Residential | No. No.540238, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 13/10 | Residential | No. No.742603, 12 May 2025 | Deputy Commissioner |
| Phase II | 190/1 | Residential | No. No.540217, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 191/5 | Residential | No. No.540218, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 191/6 | Residential | No. No.540219, 26 Mar 2024 | Deputy Commissioner |
| Phase II | 191/7 | Residential | No. No.742584, 12 May 2025 | Deputy Commissioner |
| Phase II | 191/9 | Residential | No. No.779404, 22 Sep 2025 | Deputy Commissioner |
| Phase II | 191/10 | Residential | No. No.540227, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 191/11 | Residential | No. No.540220, 5 Jul 2017 | Deputy Commissioner |
| Phase II | 192/1 | Residential | No. No.742590, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/2 | Residential | No. No.742589, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/3 | Residential | No. No.742581, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/5 | Residential | No. No.779407, 19 Aug 2025 | Deputy Commissioner |
| Phase II | 192/6 | Residential | No. No., 12 May 2025 | Deputy Commissioner |
| Phase II | 192/7 | Residential | No. No.742585, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/8 | Residential | No. No.742586, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/9 | Residential | No. No.742587, 12 May 2025 | Deputy Commissioner |
| Phase II | 192/13 (old No.192/11) | Residential | No. No.779402, 28 Aug 2025 | Deputy Commissioner |
| Phase II | 196/4 (Old No.196/1) | Residential | No. No.123456, 19 Aug 2025 | Deputy Commissioner |
| Phase II | 196/2 | Residential | No. No.779400, 19 Aug 2025 | Deputy Commissioner |
| Phase II | 196/3 | Residential | No. No.779401, 19 Aug 2025 | Deputy Commissioner |
| Phase II | 197/1 | Residential | No. No.00 Acre, 21 Guntas, 19 Aug 2025 | Deputy Commissioner |
| Phase II | 197/2 | Residential | No. No.742588, 12 May 2025 | Deputy Commissioner |
| Phase II | 197/3 | Residential | No. No.540221, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 197/4 | Residential | No. No.540222, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 200-2 (Old No.200) | Residential | No. No.540223, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 201/5 | Residential | No. No.540225, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 28/4 | Residential | No. No.540214, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 28/5 | Residential | No. No.742619, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/1 | Residential | No. No.742620, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/2 | Residential | No. No.742615, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/3 | Residential | No. No.742604, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/4 | Residential | No. No.742607, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/5 | Residential | No. No.742617, 12 May 2025 | Deputy Commissioner |
| Phase II | 30/6 (Old No.30/1) | Residential | No. No.742610, 12 May 2025 | Deputy Commissioner |
| Phase II | 33/1 | Residential | No. No.SR-134/2005-06, 8 Aug 2023 | Deputy Commissioner |
| Phase II | 33/2 | Residential | No. No.742605, 12 May 2025 | Deputy Commissioner |
| Phase II | 33/3 | Residential | No. No.742608, 12 May 2025 | Deputy Commissioner |
| Phase II | 60/1 | Residential | No. No.742616, 12 May 2025 | Deputy Commissioner |
| Phase II | 60/5 (Old Sy.No.60/1) | Residential | No. No.742621, 19 Jul 2025 | Deputy Commissioner |
| Phase II | 60/2A | Residential | No. No.540215, 12 Jan 2024 | Deputy Commissioner |
| Phase II | 60/2B | Residential | No. No.540216, 12 Jan 2024 | Deputy Commissioner |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Prestige Marigold RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/240122/004653
- Registered on
- 24 Jan 2022
- Promised completion
- 30 Nov 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Phase I | PRM/KA/RERA/1250/303/PR/240122/004653 | 30 Jun 2023 | 397 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase II | PRM/KA/RERA/1250/303/PR/171225/008346 | 30 Nov 2027 | 717 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Prestige Marigold is a plotted layout by Ace Realty Ventures in Maragondanahalli, Devanahalli, with 1,114 plots across two RERA-registered phases. Phase I has 397 plots with a completion date of 30 June 2023, while Phase II has 717 plots with a completion date of 30 November 2027.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority, BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase I
- KOTAK MAHINDRA BANK, Lavelle Road
- Escrow bank (RERA) · Phase II
- ICICI Bank, MG Road Bangalore
Amenities
Prestige Marigold location and address
- Address
- Sy.No.14/1,14/2,15,16/1,16/2,17,18 and 145 of Maragondanahalli Village and Sy.Nos. 188/1, 188/4, 188/5, 188/6, 188/7, 189/1, 189/2, 189/4, 189/5 , 189/6, 189/7, 189/8, 190/2, 190/3, 190/4, 190/5, 190/6, 190/7, 190/8, 190/9, 191/3, 191/4, 191/8, 194/1, 194/2, 194/4, 194/5, 194/6, 194/7, 195/5 and 195/6 of Bettenahalli Village, Kundana Hobli , Devanahalli , Bengaluru Rural, Karnataka - 560036
- Village (RERA)
- Maragondanahalli
- Locality
- Bommasandra
- PIN code
- 560036
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.19991, 77.58197
Distances to landmarks
Not found in public records yet: landmarksAbout Bommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 13.26 km | approx. 54 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.37 km | approx. 70 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 24.69 km | approx. 100 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 29.01 km | approx. 118 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 32.54 km | approx. 132 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 39.97 km | approx. 162 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction6.9 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction9.45 km
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction11.08 km
- Dasarahalli (ದಾಸರಹಳ್ಳಿ)Open now — nearest operating metro station18.97 km
- Rajanukunte Nearest railway station3.32 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,358 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,358 m
- Tarahunase Lake on OpenStreetMap (opens in a new tab) 1,829 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,972 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Prestige Marigold layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure7 pages

Phase II: BrochureFull PDF on RERA 





Approved layout plan2 files

Phase I: Approved Layout PlanFull PDF on RERA 
Phase II: Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 231 |
| Plot 9.14 m × 15.24 m | — | 286 |
| Plot 12.19 m × 18.28 m | — | 239 |
| Plot 15.24 m × 24.38 m | — | 67 |
| Commercial | — | 1 |
| Odd plots | — | 188 |
| Odd-shaped plots | — | 102 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Prestige Marigold completion date and development status
Timeline
- 1 Jan 2022Phase I: Project start date given to RERA
- 24 Jan 2022Phase I: Registered with Karnataka RERA
- 30 Jun 2023Phase I: Completion date given at registration
- 1 Dec 2025Phase II: Project start date given to RERA
- 17 Dec 2025Phase II: Registered with Karnataka RERA
- 30 Nov 2027Phase II: Completion date given at registration
Construction pace from RERA quarterly filings (Phase II)
At the average pace so far, construction would reach 100% around Feb 2027 — about 9 months before the completion date on RERA (30 Nov 2027).
At the pace between the 4 quarterly filings we have (53% → 67% in 9 months), it would be around Jul 2028 — about 7 months after the RERA date.
This project has 2 RERA registrations; the chart uses Phase II, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 67% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 64% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 56% | — |
| Q3 2025-26to 31 Dec 2025 | 15 Jan 2026 | 53% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 67% ÷ 10 months (1 Dec 2025 to 30 Sep 2026) = 6.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 33 ÷ 6.7 = 4.9 months → Feb 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (67% − 53%) ÷ 9 months = 1.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
11 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Phase I) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/02/LAO/82/20-21/986 · dated 2021-10-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (20 orders) (Phase I) | DC, Bangalore Rural · No. LNDC 10000029 and 19 more · dated 2021-06-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase II) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/72/2025-26 · dated 2025-09-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (68 orders) (Phase II) | Deputy Commissioner · No. ALN(DE.ku)SR:04/2016-17 and 67 more · dated 2025-09-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase I)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/02/LAO/82/20-21/986 · dated 12 Oct 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Prestige Marigold RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00020/2023 | 4 Jan 2023 | compensation and commission as per their promise | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Ace Realty Ventures
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Ace Realty Ventures’s RERA recordAce Realty Ventures delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Ace Realty Ventures in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,114Plots registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.9Complaints per 1,000 plots1 complaints ÷ 1,114 plots in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2021
- 14 Oct 2026Phase II: Quarterly update filed for Q2 2026-27: 67% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase II: Quarterly update filed for Q1 2026-27: 64% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase II: Quarterly update filed for Q4 2025-26: 56% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase II: Quarterly update filed for Q3 2025-26: 53% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Dec 2025Phase II: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/171225/008346); completion date 30 Nov 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Dec 2025Phase II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Sep 2025Phase II: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/LAO/72/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jan 2023Complaint 00020/2023 filed with RERA: “compensation and commission as per their promise” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jan 2022Phase I: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/240122/004653); completion date 30 Jun 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2022Phase I: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Oct 2021Phase I: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/02/LAO/82/20-21/986) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Prestige Marigold FAQs
What plot sizes are available in Prestige Marigold Phase I?
Phase I offers plots in 40×60 sq ft (2,400 sq ft), 30×40 sq ft (1,200 sq ft), 30×50 sq ft (1,500 sq ft), and 50×80 sq ft (4,000 sq ft), plus 102 odd-sized plots.
What plot sizes are available in Prestige Marigold Phase II?
Phase II offers plots in 30×50 sq ft (1,500 sq ft), 30×40 sq ft (1,200 sq ft), 40×60 sq ft (2,400 sq ft), and 50×80 sq ft (4,000 sq ft), plus 188 odd-sized plots and 1 commercial plot.
How many plots are in Prestige Marigold?
Phase I has 397 plots and Phase II has 717 plots, for a total of 1,114 plots.
What are the RERA registration numbers for Prestige Marigold?
Phase I is registered as PRM/KA/RERA/1250/303/PR/240122/004653 and Phase II is registered as PRM/KA/RERA/1250/303/PR/171225/008346.
Who approved the layout for Prestige Marigold?
The layout was approved by BIAAPA.
How many land conversion orders does Prestige Marigold have?
Phase I has 20 land conversion orders and Phase II has 68 land conversion orders.
What are the completion dates for Prestige Marigold?
Phase I has a completion date of 30 June 2023 and Phase II has a completion date of 30 November 2027.
What is the development progress of Phase II?
As of Q2 2026-27 (quarter ended 30 September 2026), Phase II is 67% developed.
How many RERA complaints are there on Prestige Marigold?
There is 1 RERA complaint on Phase I and 0 complaints on Phase II.
Where is Prestige Marigold located?
Prestige Marigold is located in Maragondanahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 560036.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Prestige Marigold
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Ace Realty Ventures? Review the developer.
Reviews of Ace Realty Ventures by verified buyers
No verified reviews of Ace Realty Ventures yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Green Woods Gardens Extension-3cTelecom Employees Co-Operative Housing Society Ltd | 1.5 km | 58 | Dec 2028 | — | 0 | Not collected |
| Green Woods Gardens Extension-3bTelecom Employees Co-Operative Housing Society Ltd | 1.6 km | 55 | Dec 2028 | — | 0 | Not collected |
| Chartered BirdsongSukhada Bala | 1.7 km | 265 | Dec 2028 | 84% | 0 | Not collected |
| Green Woods Gardens Extension-3aTelecom Employees Co-Operative Housing Society Ltd | 1.8 km | 21 | Dec 2028 | — | 0 | Not collected |
| Vaishnavi At-One Life IVVAISHNAVI AT-ONE LIFE PARK LLP and AT-ONE ESTATES Private Limited | 2.3 km | 227 | Dec 2027 | 90% | 0 | Not collected |
| Raja IraRaja Housing Limited | 2.4 km | 65 | Jun 2026 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/240122/004653, PRM/KA/RERA/1250/303/PR/171225/008346.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bommasandra
Hulimangala, BommasandraUnder constructionRERA registeredBuyers’ group openSterlitee Regal Park
by Sterlitee
Price: Price on requestGet brochure & price →
- 20×40, 30×50, 35×50 +3 more
- 593 – 44,677 sq ft plots
- Approved by BDA
- Dec 2028
251 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sterlitee Regal Park
Bettanahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openGreen Woods Gardens Extension-3c
by Telecom Employees Co-Operative Housing Society
Price: Price on requestGet brochure & price →
- 30×40
- 718 – 2,263 sq ft plots
- Approved by BIAAPA
- Dec 2028
58 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Woods Gardens Extension-3c
Bettanahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openGreen Woods Gardens Extension-3b
by Telecom Employees Co-Operative Housing Society
Price: Price on requestGet brochure & price →
- 30×40, 40×60
- 937 – 3,041 sq ft plots
- Approved by BIAAPA
- Dec 2028
55 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Woods Gardens Extension-3b