Rosevista Grande
30×50 plots by M/S. Taapasi Properties · Biayappanahalli, Bagalur, Bengaluru
Biayappanahalli, Bagalur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Rosevista Grande at a glance
- Completion (RERA)May 2028Karnataka RERA
- Construction2% builtPromoter’s RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 15 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 15 Oct 2026
- Nearest metroBagalur Cross · 4.32 km (under construction)Open now: Krishnarajapura, 13.95 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 43 min at peak10.54 km straight line · estimate
- Nearest lakeUnnamed lake · 141 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Rosevista Grande is a plotted development by M/S. Taapasi Properties in Biayappanahalli, Bengaluru with 76 plots, registered with Karnataka RERA. The completion date on RERA is 31 May 2028.
Facts collected on 15 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Rosevista Grande buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/S. Taapasi Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Rosevista Grande buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×50
- Plot area
- 1,046 – 3,848 sq ft
- Total plots
- 76
- Layout approved by
- BDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 3
- Completion (RERA)
- May 2028
- Development (RERA update)
- 2%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×50 | 1,500 sq ft | 42 |
| Odd-sized (irregular) | varies | 34 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BDA - Bangalore Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 94/2 | Residential | No. 787333/4/5/6/7/8, 20 Sep 2025 | Deputy Commissioner |
| 95/2 | Residential | No. 787340/41/42, 20 Sep 2025 | Deputy Commissioner |
| 96/1 | Residential | No. 787343/44/45/46, 20 Sep 2025 | Deputy Commissioner |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Rosevista Grande RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/290926/008976
- Registered on
- 29 Sep 2026
- Promised completion
- 31 May 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Rosevista Grande is a plotted layout developed by M/S. Taapasi Properties in Biayappanahalli, Yelahanka, with 76 plots. The project is registered on RERA with a completion date of 31 May 2028.
Written by AI from the RERA record above on 15 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Bank of Baroda, ORR MARATHAHALLI
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/TPM/PRL-392/517/2026-27 ( E-207981) · dated 11 May 2026
- Project cost declared to RERA
- ₹55.2 Cr
Amenities
Rosevista Grande location and address
- Address
- Sy. No.94/2, 95/2 and 96/1 Biayappanahalli Village, Jala Hobli, Yelahanka Taluk, Bangalore , Banaglore , Yelahanka , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Biayappanahalli
- Locality
- BagalurAlso known as Bagaluru, Aerospace Park
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.12236, 77.64958
Distances to landmarks
Not found in public records yet: landmarksAbout Bagalur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 8.86 km | approx. 36 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 10.54 km | approx. 43 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 17.77 km | approx. 72 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 18.23 km | approx. 74 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.35 km | approx. 91 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 30.37 km | approx. 123 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges3 schools, 3 colleges, 1 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Delhi Public School Bangalore North · 0.96 km
- Euro Kids · 1.01 km
- CMR University Campus (Lakeside) · 1.06 km
Nearest hospitals and clinics
- Reva Health Centre · 1.67 km
- Apex Hospital · 1.88 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction4.32 km
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction5.81 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction7.36 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station13.95 km
- Yelahanka Junction (ಯಲಹಂಕ ಜಂಕ್ಷನ್)Nearest railway station6.54 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 141 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 141 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,476 m
- Bagaluru Kere on OpenStreetMap (opens in a new tab) (ಬಾಗಲೂರು ಕೆರೆ)1,813 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Rosevista Grande layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

3) landuse analysis,development details,project address as per approved planFiled 12 Sep 2026 · Full PDF on RERA 
4) Area details in the project details page not matching with the Approved Plan(Site area and Total area)Filed 12 Sep 2026 · Full PDF on RERA
Approved layout plan3 files

Approved Layout Plan/Demarcation PlanFull PDF on RERA 
1) Approved Proposed original Layout planFiled 12 Sep 2026 · Full PDF on RERA 
3)Demarcation of proposed land in Approved Master plan Certified by the competent_compressed-compressedFiled 12 Sep 2026 · Full PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 15.24 m | — | 42 |
| Odd-shaped plots | — | 34 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Rosevista Grande completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 1 Aug 2026Project start date given to RERA
- 29 Sep 2026Registered with Karnataka RERA
- 31 May 2028Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BDA - Bangalore Development Authority · No. BDA/TPM/PRL-392/517/2026-27 ( E-207981) · dated 2026-05-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy Commissioner · No. 787333/4/5/6/7/8 and 2 more · dated 2025-09-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPM/PRL-392/517/2026-27 ( E-207981) · dated 11 May 2026
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 15 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Rosevista Grande RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/S. Taapasi Properties
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (15 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/S. Taapasi Properties’s RERA recordM/S. Taapasi Properties delivery record
- 1Projects in Bengaluru on RERA1 approved registration under M/S. Taapasi Properties in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 76Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 76 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2026
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 2% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Sep 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/290926/008976); completion date 31 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Aug 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/PRL-392/517/2026-27 ( E-207981)) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Rosevista Grande FAQs
What are the plot sizes in Rosevista Grande?
The layout has 42 plots of 30×50 feet (1,500 sq ft each) and 34 odd-sized plots. The sizes of the odd-sized plots are not in the RERA record.
How many plots are in Rosevista Grande?
The project has 76 plots in total.
Who approved the layout for Rosevista Grande?
The layout was approved by the BDA (Bangalore Development Authority).
How many land conversion orders has Rosevista Grande received?
The project has 3 land conversion orders on record.
What is the RERA registration number for Rosevista Grande?
The RERA registration number is PRM/KA/RERA/1251/472/PR/290926/008976, registered on 29 September 2026.
When will Rosevista Grande be completed?
The project completion date on RERA is 31 May 2028.
How many plots have been booked in Rosevista Grande?
The latest quarterly update for Q2 2026-27 (ended 30 September 2026) does not specify the number of plots booked.
What is the development progress of Rosevista Grande?
As of Q2 2026-27 (ended 30 September 2026), the layout development is 2 percent complete.
Are there any RERA complaints against Rosevista Grande?
There are no complaints on this project and no complaints against the developer across all projects on RERA.
Where is Rosevista Grande located?
The project is in Biayappanahalli, Yelahanka taluk, Bengaluru Urban district, PIN code 560049.
Written by AI from the RERA record above on 15 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Rosevista Grande
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from M/S. Taapasi Properties? Review the developer.
Reviews of M/S. Taapasi Properties by verified buyers
No verified reviews of M/S. Taapasi Properties yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Natures BoulevardM/s NATURES BOULEVARD | 3.2 km | 52 | Dec 2030 | 43% | 0 | Not collected |
| Arsh GreensVaishnavi Residences | 3.6 km | 77 | Jun 2026 | 100% | 0 | Not collected |
| Shiva Prasad EnclaveSuryanarayana Y N | 4.4 km | 17 | Dec 2031 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 15 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/290926/008976.
- RERA record last checked: 15 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bagalur
- Huttanahalli, Bagalur© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Arsh Greens
by Vaishnavi Residences
Price: Price on requestGet brochure & price →
- 30×40
- 1,199 – 2,134 sq ft plots
- Approved by BIAAPA
- Jun 2026
77 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Arsh Greens
Bagaluru, BagalurUnder constructionRERA registeredBuyers’ group openDR Elita
by DR Infra
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 922 – 2,382 sq ft plots
- Approved by Hoskote Planning Authority
- Jan 2028
74 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DR Elita
Hunsamaranahalli, near BagalurUnder constructionRERA registeredBuyers’ group openNatures Boulevard
by M/s NATURES BOULEVARD
Price: Price on requestGet brochure & price →
- 20×30, 30×40, 40×66
- 600 – 5,014 sq ft plots
- Approved by BDA
- Dec 2030
52 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Natures Boulevard