Royal Enclave
2 & 3 BHK apartments by Mega Builders · Yeshwanthpur, Bengaluru
Yeshwanthpur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Royal Enclave at a glance
- Possession (RERA)Mar 2027Karnataka RERA
- Construction90% built · on pace for Jan 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked44 of 60 (73%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroPeenya Industry · 0.42 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 108 min at peak26.56 km straight line · estimate
- Nearest lakeDasarahalli Tank · 1,782 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Royal Enclave is a residential project by Mega Builders in Bengaluru with 60 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2027.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Royal Enclave buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Mega Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Royal Enclave buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 752 – 1,309 sq ft
- Towers
- 1
- Floors
- 6
- Total homes
- 60
- Land
- 0.67 acres
- Possession (RERA)
- Mar 2027
- Built (RERA update)
- 90%
Royal Enclave RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/180524/006902
- Registered on
- 18 May 2024
- Promised completion
- 31 Mar 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 44 of 60 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| ROYAL ENCLAVE | 6 | 1 | 60 |
A dash (—) means the filing did not state that value.
Summary in plain English
Royal Enclave is a residential project by Mega Builders in Bengaluru South with 60 homes in 1 tower. The project has 30 three-bedroom and 30 two-bedroom homes. According to RERA, the project is scheduled for completion on 31 March 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 48.8% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- CITY UNION BANK, Banashankari
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0055/22-23 · dated 15 Feb 2024
- Project cost declared to RERA
- ₹56.17 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Royal Enclave location and address
- Address
- Site No. 39 , S.R.S. Road , Bengaluru South , Bengaluru Urban, Karnataka - 560058
- Village (RERA)
- Not found in public records yet: village
- Locality
- YeshwanthpurAlso known as Yeshwantpur, Yeshwanthapura
- PIN code
- 560058
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.03410, 77.52866
Distances to landmarks
Not found in public records yet: landmarksAbout Yeshwanthpur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 7.64 km | approx. 31 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 10 km | approx. 41 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 20.59 km | approx. 83 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.24 km | approx. 94 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.27 km | approx. 102 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 26.56 km | approx. 108 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 16Schools and colleges6 schools, 10 colleges, 0 kindergartens
- 11Hospitals and clinics9 hospitals, 2 clinics
Nearest schools and colleges
- Government PU College, Peenya · 0.18 km
- GFGC Peenya · 0.28 km
- Nammura Government Model Primary School · 0.29 km
Nearest hospitals and clinics
- Ravi Kirloskar Memorial Hospital · 0.5 km
- KLE Dental College · 0.86 km
- Esi Hospital Peenya 1st Stage · 0.89 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Peenya Industry (ಪೀಣ್ಯ ಇಂಡಸ್ಟ್ರಿ)Open now — nearest operating metro station0.42 km
- Yesvantpur Junction (ಯಶವಂತಪುರ ಜಂಕ್ಷನ್)Nearest railway station2.66 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Dasarahalli Tank, 1,782 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Dasarahalli Tank on OpenStreetMap (opens in a new tab) (ದಾಸರಹಳ್ಳಿ ಕೆರೆ)1,782 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Royal Enclave home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 752 – 966 sq ft | 30 |
| 3 BHK | 1,068 – 1,309 sq ft | 30 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Royal Enclave possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 30 | 20 | 10 |
| 3 BHK | 30 | 24 | 6 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 15 Feb 2024Project start date given to RERA
- 18 May 2024Registered with Karnataka RERA
- 31 Mar 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jan 2027 — about 2 months before the completion date on RERA (31 Mar 2027).
At the pace between the 4 quarterly filings we have (76% → 90% in 9 months), it would be around Apr 2027 — the same month as the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 90% | 44 of 60 |
| Q1 2026-27to 30 Jun 2026 | 14 Oct 2026 | 86% | 37 of 60 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 83% | 28 of 60 |
| Q3 2025-26to 31 Dec 2025 | 22 Jan 2026 | 76% | 17 of 60 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 90% ÷ 31.5 months (15 Feb 2024 to 30 Sep 2026) = 2.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 10 ÷ 2.9 = 3.5 months → Jan 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (90% − 76%) ÷ 9 months = 1.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0055/22-23 · dated 2024-02-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Office of Tahsildar, Bengaluru North Taluk · No. ALN.SR.1687/67/ALNP120.68. DR.207/68-69 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDSOUTH/0055/22-23 · dated 15 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Royal Enclave RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Mega Builders
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Mega Builders’s RERA recordMega Builders delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Mega Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 60Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 60 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 14 Oct 2026Quarterly update filed for Q1 2026-27: 86% built, 37 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 90% built, 44 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 83% built, 28 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jan 2026Quarterly update filed for Q3 2025-26: 76% built, 17 of 60 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/180524/006902); completion date 31 Mar 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Feb 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDSOUTH/0055/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Feb 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Royal Enclave FAQs
What is Royal Enclave and where is it located?
Royal Enclave is a residential project by Mega Builders in Bengaluru South, Bengaluru Urban, PIN code 560058.
How many homes are in Royal Enclave?
The project has 60 homes: 30 three-bedroom homes and 30 two-bedroom homes.
What are the carpet area ranges for homes in Royal Enclave?
Three-bedroom homes range from 1,068 to 1,309 sq ft carpet area, and two-bedroom homes range from 752 to 966 sq ft carpet area.
When is Royal Enclave scheduled for completion?
According to RERA, the project is scheduled for completion on 31 March 2027.
What is the current construction progress of Royal Enclave?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 90% complete.
How many homes have been booked in Royal Enclave?
As of Q2 2026-27, 44 homes have been booked out of 60 homes.
What is the RERA registration number for Royal Enclave?
The RERA registration number is PRM/KA/RERA/1251/310/PR/180524/006902, registered on 18 May 2024.
Are there any RERA complaints against Royal Enclave?
There are no RERA complaints on this project or against the builder Mega Builders.
Which bank holds the escrow for Royal Enclave?
City Union Bank holds the escrow for the project.
How many towers does Royal Enclave have?
Royal Enclave has 1 tower with a maximum of 6 floors.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Royal Enclave
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Mega Builders? Review the builder.
Reviews of Mega Builders by verified buyers
No verified reviews of Mega Builders yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Kumar PlatinaKumar Properties Private Limited | 3.1 km | 184 | Mar 2031 | 9% | 0 | Not collected |
| Durga SamrudhiSree Shivadurga Builders | 3.3 km | 79 | Dec 2026 | 98% | 0 | Not collected |
| Vruksha GreensVruksha Infra | 3.8 km | 80 | Jun 2027extended | 60% | 0 | Not collected |
| Pride AltiusPride Housing | 4 km | 152 | Jun 2026 | 100% | 0 | Not collected |
| Brigade LuminaBrigade Enterprises Ltd | 4.4 km | 416 | Dec 2030 | 11% | 0 | from ₹1.45 Cr |
| Natures Lap By 5 Elements5 Elements Homes | 4.7 km | 365 | Dec 2029 | 69% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/180524/006902.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Yeshwanthpur
Nagasandra, Tumkur RoadUnder constructionRERA registeredBuyers’ group openKumar Platina
by Kumar Properties
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK
- 965 – 1,099 sq ft
- Mar 2031
184 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Platina
Jarakabandekaval, Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group openDurga Samrudhi
by Sree Shivadurga Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 765 – 1,384 sq ft
- Dec 2026
79 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Durga Samrudhi
Shettihalli, Hesaraghatta RoadUnder constructionRERA registeredBuyers’ group openVruksha Greens
by Vruksha Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 732 – 859 sq ft
- Jun 2027 (extended)
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vruksha Greens