Sapthagiri Sampada B Block at a glance
- Possession (RERA)Dec 2031Karnataka RERA
- Construction41% built · on pace for May 2029RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked2 of 108 (2%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 8.42 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 153 min at peak37.87 km straight line · estimate
- Nearest lakeDommasandra Lake · 1,053 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sapthagiri Sampada B Block is a residential project by Sapthagiri Constructions in Sonnadenahalli, Bengaluru with 108 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2031.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sapthagiri Sampada B Block buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sapthagiri Constructions for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sapthagiri Sampada B Block buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 370 – 970 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 108
- Land
- 0.95 acres
- Possession (RERA)
- Dec 2031
- Built (RERA update)
- 41%
Sapthagiri Sampada B Block RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/120626/008720
- Registered on
- 12 Jun 2026
- Promised completion
- 31 Dec 2031
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 2 of 108 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| 4 | 4 | 1 | 108 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sapthagiri Sampada B Block is a residential project by Sapthagiri Constructions in Sonnadenahalli, Hosakote. The project has 108 homes across 1 tower with up to 4 floors, with an expected completion date of 31 December 2031.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 49.2% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Battarahalli
- Building plan (RERA)
- Hoskote Planning Authority · No. HYP/CC/13/2024-25 · dated 30 Nov 2024
- Project cost declared to RERA
- ₹23.44 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sapthagiri Sampada B Block location and address
- Address
- Sy No 3/2, 3/6, & 3/7 of Sonnadenahalli Village, Kasaba Hobli, , Bengaluru Rural district , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Sonnadenahalli
- Locality
- Near Dommasandra
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86328, 77.75164
Distances to landmarks
Not found in public records yet: landmarksAbout Sonnadenahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 9.52 km | approx. 39 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.17 km | approx. 41 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.91 km | approx. 56 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 23.51 km | approx. 95 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 25.03 km | approx. 101 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 37.87 km | approx. 153 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges5 schools, 3 colleges, 0 kindergartens
- 4Hospitals and clinics3 hospitals, 1 clinics
Nearest schools and colleges
- ALLEN Career Institute · 1.27 km
- Head Start Educational Academy · 1.86 km
- Bethany High Sarjapur · 1.93 km
Nearest hospitals and clinics
- Spandana · 1.72 km
- Healing Hands Clinic - Sarjapura, Bengaluru · 1.79 km
- Balaji Nursing Home · 1.8 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station8.42 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station4.48 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Dommasandra Lake, 1,053 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Dommasandra Lake on OpenStreetMap (opens in a new tab) 1,053 m
- Yamare Lake on OpenStreetMap (opens in a new tab) 1,251 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,408 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sapthagiri Sampada B Block home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan4 files

Approved Plan - Ground flr & Typical flr PlanFiled 6 May 2026 · Full PDF on RERA 
Approved PlanFiled 6 May 2026 · Full PDF on RERA 
Approved PlanFiled 26 May 2026 · Full PDF on RERA 
Approved Plan - Site & Terrace PlanFiled 6 May 2026 · Full PDF on RERA
Approved layout plan

Single Layout Plan - SS B BlockFiled 5 Jun 2026 · Full PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 370 – 382 sq ft | 5 |
| 2 BHK | 648 – 757 sq ft | 74 |
| 3 BHK | 678 – 970 sq ft | 29 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sapthagiri Sampada B Block possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 5 | 0 | 5 |
| 2 BHK | 74 | 2 | 72 |
| 3 BHK | 29 | 0 | 29 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 30 Nov 2024Project start date given to RERA
- 12 Jun 2026Registered with Karnataka RERA
- 31 Dec 2031Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around May 2029 — about 31 months before the completion date on RERA (31 Dec 2031).
At the pace between the 2 quarterly filings we have (11% → 41% in 3 months), it would be around Mar 2027 — about 57 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 41% | 2 of 108 |
| Q1 2026-27to 30 Jun 2026 | 12 Oct 2026 | 11% | 0 of 108 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 41% ÷ 22 months (30 Nov 2024 to 30 Sep 2026) = 1.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 59 ÷ 1.9 = 31.6 months → May 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (41% − 11%) ÷ 3 months = 9.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Hoskote Planning Authority · No. HYP/CC/13/2024-25 · dated 2024-11-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy Commissioner · No. 241833 and 2 more · dated 2021-03-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Hoskote Planning Authority · No. HYP/CC/13/2024-25 · dated 30 Nov 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sapthagiri Sampada B Block RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sapthagiri Constructions
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 6
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sapthagiri Constructions’s RERA recordSapthagiri Constructions delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Sapthagiri Constructions in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 204Homes registeredAs stated in each registrations.
- 6RERA complaints0 open, 6 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 29.4Complaints per 1,000 homes6 complaints ÷ 204 homes in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
6 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 41% built, 2 of 108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Oct 2026Quarterly update filed for Q1 2026-27: 11% built, 0 of 108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jun 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/120626/008720); completion date 31 Dec 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Nov 2024Building plan approved by Hoskote Planning Authority (No. HYP/CC/13/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Nov 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sapthagiri Sampada B Block FAQs
What is the RERA registration number for Sapthagiri Sampada B Block?
The RERA registration number is PRM/KA/RERA/1250/304/PR/120626/008720, registered on 12 June 2026.
How many homes are in Sapthagiri Sampada B Block and what types are available?
There are 108 homes: 74 two-bedroom units (648 to 757 carpet sq ft), 5 one-bedroom units (370 to 382 carpet sq ft), and 29 three-bedroom units (678 to 970 carpet sq ft).
What is the expected completion date of Sapthagiri Sampada B Block?
The expected completion date is 31 December 2031.
What is the construction progress of Sapthagiri Sampada B Block?
As of the quarter ending 30 September 2026, the project is 41% complete, with 2 homes booked out of 108.
Where is Sapthagiri Sampada B Block located?
The project is located in Sonnadenahalli, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
Are there any RERA complaints against Sapthagiri Sampada B Block?
There are no RERA complaints on this project registration.
How many RERA complaints are there against Sapthagiri Constructions?
There are 6 RERA complaints against Sapthagiri Constructions across all their projects on the Karnataka RERA record.
How many other projects does Sapthagiri Constructions have in the Bengaluru RERA records?
Sapthagiri Constructions has 3 projects in total in the Bengaluru RERA records.
What is the land area of Sapthagiri Sampada B Block?
The land area is 3,845 square metres.
Which bank is the escrow bank for Sapthagiri Sampada B Block?
The escrow bank is ICICI Bank.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sapthagiri Sampada B Block
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sapthagiri Constructions? Review the builder.
Reviews of Sapthagiri Constructions by verified buyers
No verified reviews of Sapthagiri Constructions yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Trifecta VeranzaTrifecta Projects Private Limited | 0 km | 444 | Dec 2029 | 25% | 0 | Not collected |
| Godrej Regent ParkGodrej Properties Limited | 0.2 km | 534 | Jul 2031 | 3% | 0 | from ₹1.3 Cr |
| Axis NiranAxis Concept Construction Pvt Ltd | 0.2 km | 49 | Sep 2028 | 25% | 0 | Not collected |
| Engrace 3Modern Spaces | 0.5 km | 76 | Jun 2026 | 100% | 0 | Not collected |
| Engrace 4Modern Spaces | 0.7 km | 145 | Dec 2026 | 85% | 0 | Not collected |
| Engrace VistaModern Spaaces Ventures | 0.9 km | 392 | Dec 2028 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/120626/008720.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Sonnadenahalli, near NelamangalaUnder constructionRERA registeredBuyers’ group openSapthagiri Sampadha
by Sapthagiri Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 388 – 1,052 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 96 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sapthagiri Sampadha
Yamare, near DommasandraUnder constructionRERA registeredBuyers’ group openTrifecta Veranza
by Trifecta
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 738 – 1,083 sq ft
- Dec 2029
444 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Trifecta Veranza
Kadaagrahara, near DommasandraUnder constructionRERA registeredBuyers’ group openGodrej Regent Park
by Godrej Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 758 – 1,119 sq ft
- Jul 2031
534 homes
Be one of the first 10 buyers in this groupFounding members — it’s free