Sattva Forest Ridge at a glance
- Possession (RERA)Dec 2029Karnataka RERA
- Construction18% built · on pace for Sep 2034 56 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked304 of 407 (75%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroVajarahalli · 2.14 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 165 min at peak40.8 km straight line · estimate
- Nearest lakeAvalahalli Lake · 787 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sattva Forest Ridge is a residential project by Sattva Resi Private Limited in Anjanapura, Bengaluru with 407 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sattva Forest Ridge buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sattva Resi Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sattva Forest Ridge buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 465 – 1,211 sq ft
- Towers
- 3
- Floors
- 30
- Total homes
- 407
- Land
- 4 acres
- Possession (RERA)
- Dec 2029
- Built (RERA update)
- 18%
Sattva Forest Ridge RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/241224/007315
- Registered on
- 24 Dec 2024
- Promised completion
- 31 Dec 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 304 of 407 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| 1 Wing 1 | 30 | 2 | 120 |
| 1 Wing 2 | 30 | 2 | 120 |
| 2 | 28 | 2 | 167 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sattva Forest Ridge is a residential project by Sattva Resi Private Limited in Anjanapura, Bengaluru South. The project has 407 homes across 3 towers with up to 30 floors, registered with Karnataka RERA on 24 December 2024. The completion date on RERA is 31 December 2029.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 76.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- FEDERAL BANK OF INDIA, ST MARKS ROAD
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Adl.Dir/JDSOUTH/0059/23-24 · dated 13 Dec 2024
- Project cost declared to RERA
- ₹362 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sattva Forest Ridge location and address
- Address
- Survey No.43/3, presently bearing BBMP Khata No. 114/43/3, situated at Anjanapura Village, Uttarahalli Hobli , Anjanapura 80 Feet Road, Ward No. 196, Bangalore , Bengaluru South , Bengaluru Urban, Karnataka - 560062
- Village (RERA)
- Anjanapura
- Locality
- Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560062
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86279, 77.55760
Distances to landmarks
Not found in public records yet: landmarksAbout Kanakapura Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 11.73 km | approx. 48 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 12.89 km | approx. 52 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.02 km | approx. 61 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.69 km | approx. 88 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.96 km | approx. 97 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 40.8 km | approx. 165 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 11Schools and colleges11 schools, 0 colleges, 0 kindergartens
- 4Hospitals and clinics0 hospitals, 4 clinics
Nearest schools and colleges
- GHPS Anjanapura · 0.71 km
- Florence Public School 4th Blk, Anjanapura · 0.72 km
- Mvs HPS, Anjanapura · 1.15 km
Nearest hospitals and clinics
- Dixit Skin & Ortho Care · 1.4 km
- Shishu Care Clinic · 1.68 km
- GS Family Clinic · 1.84 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Vajarahalli (ವಾಜರಹಳ್ಳಿ)Open now — nearest operating metro station2.14 km
- Jnanabharati (ಜ್ಞಾನಭಾರತಿ)Nearest railway station9.49 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Avalahalli Lake, 787 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Avalahalli Lake on OpenStreetMap (opens in a new tab) (ಅವಲಹಳ್ಳಿ ಕೆರೆ)787 m
- Thippasandra Lake on OpenStreetMap (opens in a new tab) (ತಿಪ್ಪಸಂದ್ರ ಕೆರೆ)856 m
- Baiyannakunte Lake on OpenStreetMap (opens in a new tab) 1,565 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sattva Forest Ridge floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

BrochureFull PDF on RERA 







5 RERA_brochure_ForestRidge_09102024Filed 21 Dec 2024 · Full PDF on RERA 






Approved building plan12 pages

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 465 – 485 sq ft | 56 |
| 2 BHK | 774 – 776 sq ft | 111 |
| 2.5 BHK | 1,004 – 1,016 sq ft | 2 |
| 3 BHK | 1,022 – 1,211 sq ft | 238 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sattva Forest Ridge possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2.5 BHK | 2 | 0 | 2 |
| 3 BHK | 238 | 191 | 47 |
| 1 BHK | 56 | 19 | 37 |
| 2 BHK | 111 | 94 | 17 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 24 Dec 2024Registered with Karnataka RERA
- 1 Jan 2025Project start date given to RERA
- 31 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Sep 2034 — about 56 months after the completion date on RERA (31 Dec 2029).
At the pace between the 4 quarterly filings we have (10% → 18% in 9 months), it would be around May 2034 — about 53 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 18% | 304 of 407 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 15% | 257 of 407 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 15% | 226 of 407 |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 10% | 191 of 407 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 18% ÷ 20.9 months (1 Jan 2025 to 30 Sep 2026) = 0.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 82 ÷ 0.9 = 95.3 months → Sep 2034. This is an estimate, not a date from the builder or RERA.
Pace between filings = (18% − 10%) ÷ 9 months = 0.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Adl.Dir/JDSOUTH/0059/23-24 · dated 2024-12-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | office of the Deputy Commissioner, Bangalore District · No. B.DIS:ALN:SR(S)403/96-97 · dated 1997-04-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Adl.Dir/JDSOUTH/0059/23-24 · dated 13 Dec 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sattva Forest Ridge RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00849/2025 | 17 Jun 2025 | Refund of advance booking amount paid | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sattva Resi Private Limited
- Promoter type
- Company
- Projects on this site
- 19
- RERA complaints against promoter
- 2
- Company number (CIN)
- U45309KA2022PTC160813
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sattva Resi Private Limited’s RERA recordSattva Resi Private Limited delivery record
- 19Projects in Bengaluru on RERA20 approved registrations under Sattva Resi Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 14,172Homes registeredAs stated in each registrations.
- 2RERA complaints1 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.1Complaints per 1,000 homes2 complaints ÷ 14,172 homes in its 20 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 18% built, 304 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 15% built, 257 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 15% built, 226 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 10% built, 191 of 407 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jun 2025Complaint 00849/2025 filed with RERA: “Refund of advance booking amount paid” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Dec 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/241224/007315); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Dec 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Adl.Dir/JDSOUTH/0059/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sattva Forest Ridge FAQs
What is the completion date for Sattva Forest Ridge?
The project completion date on RERA is 31 December 2029.
How many homes are in Sattva Forest Ridge?
The project has 407 homes across 3 towers.
What home types are available in Sattva Forest Ridge?
The project offers 1 BHK (465–485 sq ft carpet area), 2 BHK (774–776 sq ft), 2.5 BHK (1,004–1,016 sq ft), and 3 BHK (1,022–1,211 sq ft) units.
What is the RERA registration number for Sattva Forest Ridge?
The RERA registration number is PRM/KA/RERA/1251/310/PR/241224/007315, registered on 24 December 2024.
Where is Sattva Forest Ridge located?
The project is in Anjanapura, Bengaluru South taluk, PIN code 560062.
What is the construction progress of Sattva Forest Ridge?
As of 30 September 2026, the project is 18% complete with 304 homes booked out of 407.
How many RERA complaints are there on Sattva Forest Ridge?
There is 1 RERA complaint on the project.
How many other projects does Sattva Resi Private Limited have in Karnataka RERA records?
Sattva Resi Private Limited has 10 projects in the Bengaluru RERA records.
How many RERA complaints are there against Sattva Resi Private Limited across all projects?
There are 2 RERA complaints against the builder across all projects.
What is the land area for Sattva Forest Ridge?
The project land area is 16,187 sq m.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sattva Forest Ridge
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sattva Resi Private Limited? Review the builder.
Reviews of Sattva Resi Private Limited by verified buyers
No verified reviews of Sattva Resi Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Celestial CharmSree Vidhathri Developers | 0.6 km | 12 | Aug 2027 | 100% | 0 | Not collected |
| NCC Urban Lake SpringsNCC Urban Infrastructure Limited | 0.9 km | 272 | Jun 2028 | 67% | 0 | Not collected |
| Anand Somu AspireM/s ANAND GROUP AND C SOMASHEKAR | 1.2 km | 9 | Jun 2031 | 40% | 0 | Not collected |
| AvalonInCiCon-AG | 1.2 km | 29 | Sep 2028 | 89% | 0 | Not collected |
| The Ninth By AmberstoneAmberstone Properties Private Limited | 1.3 km | 56 | Jun 2029 | 35% | 0 | Not collected |
| Salarpuria Sattva Misty CharmSattva Resi Private Limited | 1.4 km | 1,339 | Oct 2024extended | — | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/241224/007315.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kanakapura Road
Alahalli, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openCelestial Charm
by Sree Vidhathri
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,227 – 1,517 sq ft
- Aug 2027
12 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Celestial Charm
Aalahalli, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openNCC Urban Lake Springs
by NCC Urban Infrastructure
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK, 3.5 BHK
- 996 – 1,385 sq ft
- Jun 2028
272 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for NCC Urban Lake Springs
Thippasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openAvalon
by InCiCon-AG
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 778 – 996 sq ft
- Sep 2028
29 homes