Shriram Esquire
2, 3 & 4 BHK apartments by Shriram Properties Limited · Koramangala, Bengaluru
Koramangala, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Shriram Esquire at a glance
- Possession (RERA)Jan 2027Karnataka RERA
- Construction80% built · on pace for Sep 2027 7 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked64 of 64 (100%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroHSR Layout · 1.8 km (under construction)Open now: Central Silk Board, 2.2 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 125 min at peak30.81 km straight line · estimate
- Nearest lakeUnnamed lake · 579 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Shriram Esquire is a residential project by Shriram Properties Limited in Bengaluru with 64 homes, registered with Karnataka RERA. The completion date on RERA is 19 Jan 2027.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Shriram Esquire buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Shriram Properties Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Shriram Esquire buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 936 – 1,551 sq ft
- Towers
- 2
- Floors
- 8
- Total homes
- 64
- Land
- 1.17 acres
- Possession (RERA)
- Jan 2027
- Built (RERA update)
- 80%
Shriram Esquire RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/080223/005702
- Registered on
- 8 Feb 2023
- Promised completion
- 19 Jan 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 64 of 64 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 7 | 1 | 31 |
| B | 8 | 1 | 33 |
A dash (—) means the filing did not state that value.
Summary in plain English
Shriram Esquire is a residential project by Shriram Properties Limited in Bengaluru South with 64 homes across 2 towers. The project has 2 BHK, 3 BHK, and 4 BHK apartments with carpet areas ranging from 936 to 1,551 sq ft. Completion is scheduled for 19 January 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 70.6% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, RICHMOND ROAD, BANGALORE
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/AA-1/TN-4/E-40/2022-23 · dated 11 Jan 2023
- Project cost declared to RERA
- ₹59.65 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Shriram Esquire location and address
- Address
- PID No-600005711 Site No-91 to 98 at HBCS LTD , Nirguna Mandir Layout , Bengaluru South , Bengaluru Urban, Karnataka - 560034
- Village (RERA)
- Not found in public records yet: village
- Locality
- Koramangala
- PIN code
- 560034
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.93264, 77.63249
Distances to landmarks
Not found in public records yet: landmarksAbout Koramangala
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 5.37 km | approx. 22 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 8.49 km | approx. 34 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 9.87 km | approx. 40 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.92 km | approx. 52 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.94 km | approx. 52 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.81 km | approx. 125 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 57Schools and colleges43 schools, 9 colleges, 5 kindergartens
- 62Hospitals and clinics40 hospitals, 22 clinics
Nearest schools and colleges
- GLPS Sheenivagilu · 0.5 km
- Patriyot Vidyanikethan LPS · 0.52 km
- Chinmaya Vidyalaya, Koramangala · 0.58 km
Nearest hospitals and clinics
- Magnus Diagnostic Lab · 0.33 km
- Fj Merrit Hydrotherapy And Wellness · 0.34 km
- Cherish Fertinity Clinic · 0.35 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- HSR Layout (ಎಚ್ಎಸ್ಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction1.8 km
- Agara Lake (ಅಗರ)Blue Line metro, under construction1.8 km
- Central Silk Board (ಸೆಂಟ್ರಲ್ ಸಿಲ್ಕ ಬೋರ್ಡ್)Blue Line metro, under construction1.96 km
- Central Silk Board (ಸೆಂಟ್ರಲ್ ಸಿಲ್ಕ ಬೋರ್ಡ್)Open now — nearest operating metro station2.2 km
- Baiyyappanahalli Junction (ಬೈಯಪ್ಪನಹಳ್ಳಿ)Nearest railway station6.84 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 579 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 579 m
- Bellandur Lake on OpenStreetMap (opens in a new tab) (ಬೆಳ್ಳಂದೂರು ಕೆರೆ)1,202 m
- Agara Lake on OpenStreetMap (opens in a new tab) (ಅಗರ ಕೆರೆ)1,331 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Shriram Esquire home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan6 pages

Area Development Plan Of Project AreaFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Approved Building/Plotting PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 940 sq ft | 1 |
| 3 BHK | 1,243 – 1,257 sq ft | 40 |
| 4 BHK | 1,524 – 1,551 sq ft | 23 |
| Apartment-2 BHK-type-1 | 936 sq ft | 1 |
| Apartment-3 BHK-type-1 | 1,238 sq ft | 24 |
| Apartment-3 BHK-type-2 | 1,259 sq ft | 16 |
| Apartment-4 BHK-type-1 | 1,550 sq ft | 7 |
| Apartment-4 BHK-type-2 | 1,528 sq ft | 7 |
| Apartment-4 BHK-type-2-1 | 1,528 sq ft | 1 |
| Apartment-4 BHK-type-3 | 1,539 sq ft | 7 |
| Apartment-4 BHK-type-3-1 | 1,539 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Shriram Esquire possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 40 | 40 | 0 |
| 4 BHK | 23 | 23 | 0 |
| 2 BHK | 1 | 1 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 24 Jan 2023Project start date given to RERA
- 8 Feb 2023Registered with Karnataka RERA
- 19 Jan 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Sep 2027 — about 7 months after the completion date on RERA (19 Jan 2027).
At the pace between the 4 quarterly filings we have (65% → 80% in 9 months), it would be around Sep 2027 — about 8 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 80% | 64 of 64 |
| Q1 2026-27to 30 Jun 2026 | 10 Jul 2026 | 74% | 64 of 64 |
| Q4 2025-26to 31 Mar 2026 | 13 Apr 2026 | 68% | 64 of 64 |
| Q3 2025-26to 31 Dec 2025 | 4 Feb 2026 | 65% | 64 of 64 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 80% ÷ 44.2 months (24 Jan 2023 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 20 ÷ 1.8 = 11 months → Sep 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (80% − 65%) ÷ 9 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/AA-1/TN-4/E-40/2022-23 · dated 2023-01-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/AA-1/TN-4/E-40/2022-23 · dated 11 Jan 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Shriram Esquire RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Shriram Properties Limited
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 123
- Company number (CIN)
- U72200TN2000PLC044560
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Shriram Properties Limited’s RERA recordShriram Properties Limited delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under Shriram Properties Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,092Homes registeredAs stated in each registrations.
- 123RERA complaints13 open, 110 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 112.6Complaints per 1,000 homes123 complaints ÷ 1,092 homes in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
123 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2023
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 80% built, 64 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2026Quarterly update filed for Q1 2026-27: 74% built, 64 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Quarterly update filed for Q4 2025-26: 68% built, 64 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Feb 2026Quarterly update filed for Q3 2025-26: 65% built, 64 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Feb 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/080223/005702); completion date 19 Jan 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jan 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jan 2023Building plan approved by BDA - Bangalore Development Authority (No. BDA/AA-1/TN-4/E-40/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Shriram Esquire FAQs
When will Shriram Esquire be completed?
The completion date on RERA is 19 January 2027.
What is the RERA registration number for Shriram Esquire?
The RERA registration number is PRM/KA/RERA/1251/310/PR/080223/005702.
How many homes are in Shriram Esquire?
The project has 64 homes across 2 towers.
What home types are available in Shriram Esquire?
The project offers 2 BHK, 3 BHK, and 4 BHK apartments. Carpet areas range from 936 sq ft for a 2 BHK to 1,551 sq ft for a 4 BHK.
What is the carpet area range for 3 BHK homes in Shriram Esquire?
3 BHK apartments in Shriram Esquire have carpet areas between 1,238 and 1,259 sq ft.
What is the construction progress of Shriram Esquire?
As of Q2 2026-27, the project is 80% complete.
How many homes are booked in Shriram Esquire?
As of Q2 2026-27, all 64 homes are booked.
Where is Shriram Esquire located?
Shriram Esquire is located in Bengaluru South taluk, Bengaluru Urban district, with PIN code 560034.
Are there any RERA complaints on Shriram Esquire?
There are no RERA complaints on this project.
What is the builder's record with RERA?
Shriram Properties Limited has 123 RERA complaints across all projects and 8 projects on record in Bengaluru.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Shriram Esquire
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Shriram Properties Limited? Review the builder.
Reviews of Shriram Properties Limited by verified buyers
No verified reviews of Shriram Properties Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Signature 4Nazeema Aslam | 0.2 km | 12 | Dec 2028 | 58% | 0 | Not collected |
| Aydin Infra Signature 3Aydin Infra | 0.2 km | 12 | Aug 2027 | 85% | 0 | Not collected |
| BelakuMillennial Luxury Estates Private Limited | 0.5 km | 23 | Mar 2027extended | 21% | 0 | Not collected |
| Raheja VivareaChalet Hotels Limited | 0.7 km | 321 | Dec 2026extended | — | 0 | Not collected |
| TelosaKinglife Infra Private Limited | 0.8 km | 8 | Mar 2030 | — | 0 | Not collected |
| BelvoirKinglife Infra Private Limited | 0.8 km | 18 | Dec 2031 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/080223/005702.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Koramangala
Srinivagilu Amanikere, KoramangalaUnder constructionRERA registeredBuyers’ group openSignature 4
by Nazeema Aslam
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,005 – 1,338 sq ft
- Dec 2028
12 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Signature 4
Srinivagilu Amanikere, KoramangalaUnder constructionRERA registeredBuyers’ group openAydin Infra Signature 3
by Aydin Infra
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,019 – 1,847 sq ft
- Aug 2027
12 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aydin Infra Signature 3
Jakkasandra, KoramangalaUnder constructionRERA registeredBuyers’ group openBelaku
by Millennial Luxury Estates
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 2,142 – 2,746 sq ft
- Mar 2027 (extended)
23 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Belaku