Sipani Samuha
1, 2 & 3 BHK apartments by Sipani Developers Private Limited · Doddabidarakallu, near Tumkur Road, Bengaluru
Doddabidarakallu, near Tumkur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Sipani Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sipani Samuha at a glance
- Possession (RERA)Dec 2029Karnataka RERA
- Construction38% built · on pace for Jun 2029RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked182 of 237 (77%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroChikkabidarakallu · 2.1 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 123 min at peak30.32 km straight line · estimate
- Nearest lakeAnchepalya Lake · 1,352 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sipani Samuha is a residential project by Sipani Developers Private Limited in Doddabidarakallu, Bengaluru with 237 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sipani Samuha buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sipani Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sipani Samuha buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 465 – 983 sq ft
- Towers
- 1
- Floors
- 20
- Total homes
- 237
- Land
- 2 acres
- Possession (RERA)
- Dec 2029
- Built (RERA update)
- 38%
Sipani Samuha RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/310125/007462
- Registered on
- 31 Jan 2025
- Promised completion
- 31 Dec 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 182 of 237 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SIPANI SAMUHA | 20 | 2 | 237 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sipani Samuha is a residential project by Sipani Developers Private Limited in Doddabidarakallu, Bengaluru North, with 237 homes in 1 tower. The project is registered on RERA and is scheduled for completion on 31 December 2029.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 75.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- FEDERAL BANK OF INDIA, BANGALORE / BANNERGHATTA IIMB
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JD/SOUTH/0073/23-24 · dated 6 Jan 2025
- Project cost declared to RERA
- ₹171 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sipani Samuha location and address
- Address
- KHATHA NO 26/47, SY NO 122/3, DODDABIDARAKALLU VILLAGE, , YESHWANTHAPURA HOBLI, , Bengaluru North , Bengaluru Urban, Karnataka - 560073
- Village (RERA)
- Doddabidarakallu
- Locality
- Near Tumkur RoadAlso known as Tumakuru Road, Tumkur Main Road, NH 48 (Tumkur Road)
- PIN code
- 560073
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.03418, 77.48268
Distances to landmarks
Not found in public records yet: landmarksAbout Doddabidarakallu
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 11.29 km | approx. 46 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.94 km | approx. 61 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.77 km | approx. 100 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 28.12 km | approx. 114 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 28.48 km | approx. 115 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.32 km | approx. 123 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
- 3Hospitals and clinics3 hospitals, 0 clinics
Nearest schools and colleges
- Delhi World Public School · 0.65 km
- Ganga International School · 1.55 km
- Sri Chaitanya Techno School · 1.69 km
Nearest hospitals and clinics
- Thippenalli Government Hospital · 0.36 km
- Shri Vishnu Ent Speciality Center · 1.54 km
- Jindal Naturecure Institute hospital · 1.82 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Chikkabidarakallu (ಚಿಕ್ಕಬಿದರಕಲ್ಲು)Open now — nearest operating metro station2.1 km
- Chikka Banavara (ಚಿಕ್ಕ ಬಾಣವಾರ)Nearest railway station5.14 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Anchepalya Lake, 1,352 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Anchepalya Lake on OpenStreetMap (opens in a new tab) (ಅಂಚೇಪಾಳ್ಯ ಕೆರೆ)1,352 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,358 m
- Doddabidirakallu Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಬಿದರಕಲ್ಲು ಕೆರೆ)1,460 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sipani Samuha floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure18 pages

BrochureFull PDF on RERA 






Floor plans6 files

2ND FLOOR PLAN.pdfFull PDF on RERA 
FLOOR PLAN 2.pdfFull PDF on RERA 
FLOOR PLAN.pdfFull PDF on RERA 
BASEMENT 1 FLOOR PLAN.pdfFull PDF on RERA 
BASEMENT 2 FLOOR PLAN.pdfFull PDF on RERA 
STILT GROUND FLOOR PLAN.pdfFull PDF on RERA
Approved building plan4 pages

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 465 sq ft | 1 |
| 2 BHK | 642 – 761 sq ft | 157 |
| 3 BHK | 981 – 983 sq ft | 79 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sipani Samuha possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-10.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 1 | 1 | 0 |
| 2 BHK | 157 | 112 | 45 |
| 3 BHK | 79 | 69 | 10 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 31 Jan 2025Registered with Karnataka RERA
- 1 Feb 2025Project start date given to RERA
- 31 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2029 — about 7 months before the completion date on RERA (31 Dec 2029).
At the pace between the 4 quarterly filings we have (16% → 38% in 9 months), it would be around Nov 2028 — about 14 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 10 Oct 2026 | 38% | 182 of 237 |
| Q1 2026-27to 30 Jun 2026 | 28 Jul 2026 | 33% | 164 of 237 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 20% | 171 of 237 |
| Q3 2025-26to 31 Dec 2025 | 16 Jan 2026 | 16% | 155 of 237 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 38% ÷ 19.9 months (1 Feb 2025 to 30 Sep 2026) = 1.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 62 ÷ 1.9 = 32.5 months → Jun 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (38% − 16%) ÷ 9 months = 2.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-10.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JD/SOUTH/0073/23-24 · dated 6 Jan 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sipani Samuha RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sipani Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U70102WB2005PTC104095
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sipani Developers Private Limited’s RERA recordSipani Developers Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sipani Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 237Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 237 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2025
- 10 Oct 2026Quarterly update filed for Q2 2026-27: 38% built, 182 of 237 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Jul 2026Quarterly update filed for Q1 2026-27: 33% built, 164 of 237 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 20% built, 171 of 237 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Quarterly update filed for Q3 2025-26: 16% built, 155 of 237 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/310125/007462); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jan 2025Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/ADDL.DIR/JD/SOUTH/0073/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sipani Samuha FAQs
When will Sipani Samuha be completed?
The project completion date on RERA is 31 December 2029.
How many homes does Sipani Samuha have?
Sipani Samuha has 237 homes across 1 tower.
What home types are available in Sipani Samuha?
The project has 2 BHK homes (157 units, 642 to 761 carpet sq ft), 3 BHK homes (79 units, 981 to 983 carpet sq ft), and 1 BHK homes (1 unit, 465 carpet sq ft).
What is the RERA registration number for Sipani Samuha?
The RERA registration number is PRM/KA/RERA/1251/309/PR/310125/007462, registered on 31 January 2025.
Where is Sipani Samuha located?
The project is in Doddabidarakallu, Bengaluru North taluk, Bengaluru Urban district, PIN code 560073.
What is the construction progress of Sipani Samuha?
As of Q2 2026-27 (quarter ended 30 September 2026), construction is 38% complete.
How many homes in Sipani Samuha have been booked?
As of Q2 2026-27, 182 out of 237 homes have been booked.
Are there any RERA complaints against Sipani Samuha?
There are no RERA complaints on this project registration.
Are there any RERA complaints against Sipani Developers Private Limited?
There are no RERA complaints against the builder across all their projects on record.
What bank holds the escrow for Sipani Samuha?
Federal Bank of India holds the escrow for this project.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sipani Samuha
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sipani Developers Private Limited? Review the builder.
Reviews of Sipani Developers Private Limited by verified buyers
No verified reviews of Sipani Developers Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Brigade LuminaBrigade Enterprises Ltd | 2 km | 416 | Dec 2030 | 11% | 0 | from ₹1.45 Cr |
| Pride AltiusPride Housing | 2.3 km | 152 | Jun 2026 | 100% | 0 | Not collected |
| Kumar PlatinaKumar Properties Private Limited | 2.5 km | 184 | Mar 2031 | 9% | 0 | Not collected |
| Natures Lap By 5 Elements5 Elements Homes | 2.8 km | 365 | Dec 2029 | 69% | 0 | Not collected |
| Vruksha GreensVruksha Infra | 4.6 km | 80 | Jun 2027extended | 60% | 0 | Not collected |
| Krishvi BVL StaturaBVL Estate Pvt. Ltd. | 4.9 km | 352 | Mar 2026extended | — | 3 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/310125/007462.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Chikkabidarakallu, Tumkur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openBrigade Lumina
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 713 – 1,139 sq ft
- Dec 2030
416 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Brigade Lumina
Doddabidarikallu, Tumkur RoadReady to moveRERA registeredBuyers’ group openPride Altius
by Pride Housing
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 667 – 1,098 sq ft
- Jun 2026
152 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pride Altius
Nagasandra, Tumkur RoadUnder constructionRERA registeredBuyers’ group openKumar Platina
by Kumar Properties
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK
- 965 – 1,099 sq ft
- Mar 2031
184 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Platina