Soul of the Seasons
1 & 3 BHK apartments by NBR Projects LLP · Kachamaranahalli, Sarjapur Road, Bengaluru
Kachamaranahalli, Sarjapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Soul of the Seasons at a glance
- Possession (RERA)Nov 2029Karnataka RERA
- Construction42% built · on pace for Aug 2028RERA filing to 30 Sep 2026 (Phase 1); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroKodibisanahalli · 6.41 km (under construction)Open now: Nallurahalli, 8.22 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 134 min at peak33.2 km straight line · estimate
- Nearest lakeHegondanahalli Lake · 327 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Soul of the Seasons is a residential project by NBR Projects LLP in Kachamaranahalli, Bengaluru with 594 homes, registered with Karnataka RERA. The completion date on RERA is 30 Nov 2029. It is registered in 2 phases.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Soul of the Seasons buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks NBR Projects LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Soul of the Seasons buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 3 BHK
- Carpet area
- 476 – 1,148 sq ft
- Towers
- 4
- Floors
- 26
- Total homes
- 594
- Land
- 9.43 acres
- Possession (RERA)
- Nov 2029
- Built (RERA update)
- Not found in public records yet: construction progress
Soul of the Seasons RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/190625/007855
- Registered on
- 19 Jun 2025
- Promised completion
- 30 Nov 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1251/310/PR/190625/007855 | 30 Nov 2029 | 282 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/446/PR/260226/008491 | 30 Nov 2029 | 312 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower A | Phase 1 | 22 | 1 | 136 |
| Tower B | Phase 1 | 24 | 1 | 146 |
| Tower C | Phase 2 | 25 | 2 | 152 |
| Tower D | Phase 2 | 26 | 2 | 160 |
A dash (—) means the filing did not state that value.
Summary in plain English
Soul of the Seasons is a residential project by NBR Projects LLP in Kachamaranahalli, Bengaluru South, with 594 homes across 2 phases and 4 towers. Phase 1 has 282 homes and Phase 2 has 312 homes, with completion scheduled for 30 November 2029.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Others, BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- HDFC, Agara Junction, Bangalore
- Escrow bank (RERA) · Phase 2
- HDFC, AGARA JUNCTION BRANCH BANGALORE
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Community Hall
- Piped Gas
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Soul of the Seasons location and address
- Address
- Survey No. 27/3 (PART), 27/6, 27/26 (PART), 45/1 (PART) of Kachamaranahalli Village, , Varthur Hobli, Bengaluru East Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560087
- Village (RERA)
- Kachamaranahalli
- Locality
- Sarjapur RoadAlso known as Sarjapura Road, Sarjapur Main Road, Sarjapura Main Road
- PIN code
- 560087
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.90410, 77.73960
Distances to landmarks
Not found in public records yet: landmarksAbout Sarjapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.69 km | approx. 27 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 9.29 km | approx. 38 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 10.1 km | approx. 41 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 20.18 km | approx. 82 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 20.61 km | approx. 83 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 33.2 km | approx. 134 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 11Schools and colleges11 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Sri Sri Ravishankar Vidya Mandir · 0.86 km
- Inventure Academy · 1.05 km
- Global Indian International School (GIIS) · 1.08 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction6.41 km
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction6.45 km
- Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction6.94 km
- Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station8.22 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station3.68 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Hegondanahalli Lake, 327 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Hegondanahalli Lake on OpenStreetMap (opens in a new tab) 327 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 569 m
- Hagondahalli Lake on OpenStreetMap (opens in a new tab) 677 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Soul of the Seasons floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

Phase 2: BrochureFull PDF on RERA
Floor plans6 files

Phase 2: 6 Ground to 25th & Terrance floor Plan (Tower 3)Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Ground to 25th & Terrance floor Plan (Tower 3)Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Ground to 26 & Terrace floor plan Tower 4Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Ground to 26 & Terrace floor plan Tower 4Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: Basement Floor plan - Tower 3 & 4Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: Basement Floor Plan-Tower 3 & 4Filed 8 Feb 2026 · Full PDF on RERA
Elevations4 files

Phase 2: 6 Elevation Plan-Tower 3Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Elevation Plan-Tower 3Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Elevation Plan -Tower 4Filed 8 Feb 2026 · Full PDF on RERA 
Phase 2: 6 Elevation Plan -Tower 4Filed 8 Feb 2026 · Full PDF on RERA
Approved building plan2 files

Phase 1: Approved Building PlanFull PDF on RERA 
Phase 2: Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 476 sq ft | 4 |
| 3 BHK | 476 – 1,148 sq ft | 590 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Soul of the Seasons possession date and construction status
Timeline
- 1 Jun 2025Phase 1: Project start date given to RERA
- 19 Jun 2025Phase 1: Registered with Karnataka RERA
- 1 Feb 2026Phase 2: Project start date given to RERA
- 26 Feb 2026Phase 2: Registered with Karnataka RERA
- 30 Nov 2029Phase 1: Completion date given at registration
- 30 Nov 2029Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 1)
At the average pace so far, construction would reach 100% around Aug 2028 — about 16 months before the completion date on RERA (30 Nov 2029).
At the pace between the 4 quarterly filings we have (12% → 42% in 9 months), it would be around Mar 2028 — about 21 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 42% | 124 of 282 |
| Q1 2026-27to 30 Jun 2026 | 10 Jul 2026 | 31% | 124 of 282 |
| Q4 2025-26to 31 Mar 2026 | 10 Apr 2026 | 21% | 117 of 282 |
| Q3 2025-26to 31 Dec 2025 | 11 Jan 2026 | 12% | 80 of 282 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 42% ÷ 16 months (1 Jun 2025 to 30 Sep 2026) = 2.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 58 ÷ 2.6 = 22 months → Aug 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (42% − 12%) ÷ 9 months = 3.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
18 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | BDA - Bangalore Development Authority · No. BDA/TPM/DLP-14/3203/24-25 · dated 2025-03-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) (Phase 1) | District Collector, Bengaluru · No. 676348 and 3 more · dated 2024-11-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26 · dated 2025-10-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase 2) | DC , BANGALORE URBAN DISTRICT · No. 629124 and 2 more · dated 2024-06-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26 · dated 8 Oct 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Soul of the Seasons RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About NBR Projects LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ABB-5602
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
NBR Projects LLP’s RERA recordNBR Projects LLP delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under NBR Projects LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 594Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 594 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 14 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 42% built, 124 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 6% built, 49 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 2% built, 22 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 31% built, 124 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 21% built, 117 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 1% built, 0 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Feb 2026Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/260226/008491); completion date 30 Nov 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2026Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 12% built, 80 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Oct 2025Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Jun 2025Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/190625/007855); completion date 30 Nov 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2025Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Mar 2025Phase 1: Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP-14/3203/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Soul of the Seasons FAQs
What is the RERA registration number for Soul of the Seasons?
Phase 1 is registered as PRM/KA/RERA/1251/310/PR/190625/007855 and Phase 2 as PRM/KA/RERA/1251/446/PR/260226/008491.
When will Soul of the Seasons be completed?
Both phases are scheduled for completion on 30 November 2029 according to the RERA record.
What home types are available in Soul of the Seasons?
Phase 1 offers 280 units of 3 BHK (948 to 1,148 sq ft carpet area) and 2 units of 1 BHK (476 sq ft carpet area). Phase 2 offers 310 units of 3 BHK (476 to 1,148 sq ft carpet area) and 2 units of 1 BHK (476 sq ft carpet area).
How many homes are in each phase of Soul of the Seasons?
Phase 1 has 282 homes across 2 towers with a maximum of 24 floors, and Phase 2 has 312 homes across 2 towers with a maximum of 26 floors.
What is the construction progress of Soul of the Seasons?
As of Q2 2026-27 (quarter ended 30 September 2026), Phase 1 is 42% complete and Phase 2 is 6% complete.
How many homes have been booked in Soul of the Seasons?
As of Q2 2026-27 (quarter ended 30 September 2026), 124 homes have been booked in Phase 1 and 49 homes in Phase 2.
Where is Soul of the Seasons located?
Soul of the Seasons is located in Kachamaranahalli, Bengaluru South taluk, with PIN code 560087.
Are there any RERA complaints filed against Soul of the Seasons?
There are no RERA complaints on record for this project or against the builder NBR Projects LLP.
Which bank holds the escrow for Soul of the Seasons?
HDFC is the escrow bank for both Phase 1 and Phase 2.
How many projects does NBR Projects LLP have in the RERA record?
NBR Projects LLP has 1 project in the Bengaluru RERA records, which is Soul of the Seasons.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Soul of the Seasons
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from NBR Projects LLP? Review the builder.
Reviews of NBR Projects LLP by verified buyers
No verified reviews of NBR Projects LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| The Right LifeNeobuild Ventures LLP | 0.9 km | 683 | Dec 2035 | 43% | 0 | Not collected |
| Mana Skanda The Right Life T789Neobuild Ventures LLP | 1.1 km | 825 | Dec 2029 | 25% | 1 | Not collected |
| Mana Skanda The Right Life T45Neobuild Ventures LLP | 1.1 km | 592 | Jun 2030 | 20% | 1 | Not collected |
| Mana Skanda The Right Life T6Neobuild Ventures LLP | 1.1 km | 126 | Jun 2030 | 15% | 0 | Not collected |
| Abhee Celestial CityNexplace Infrastructure | 1.2 km | 399 | Jun 2029 | 64% | 0 | Not collected |
| Abhee AariaAbhee Ventures Private Limited | 1.2 km | 1,017 | May 2031 | 23% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/190625/007855, PRM/KA/RERA/1251/446/PR/260226/008491.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Sarjapur Road
Chikkavaderapura, Sarjapur RoadUnder constructionRERA registeredBuyers’ group openThe Right Life
by Neobuild Ventures
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
- 226 – 1,314 sq ft
- Dec 2035
683 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for The Right Life
Doddakanelli, Sarjapur RoadReady to moveRERA registeredBuyers’ group openLand Capital Primero
by Landcapital Estates
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 721 – 13,089 sq ft
- Sep 2021 (extended)
65 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Land Capital Primero
Bhoganahalli, Sarjapur RoadUnder constructionRERA registeredBuyers’ group openGalaxy Tower
by Ashish Kumar
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,046 – 1,098 sq ft
- Jun 2028
24 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Galaxy Tower