Skip to content
Log in

Soul of the Seasons

1 & 3 BHK apartments by NBR Projects LLP · Kachamaranahalli, Sarjapur Road, Bengaluru

Kachamaranahalli, Sarjapur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by NBR Projects LLP

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Soul of the Seasons

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Soul of the Seasons is a residential project by NBR Projects LLP in Kachamaranahalli, Bengaluru with 594 homes, registered with Karnataka RERA. The completion date on RERA is 30 Nov 2029. It is registered in 2 phases.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Soul of the Seasons buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks NBR Projects LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Soul of the Seasons buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
1 BHK, 3 BHK
Carpet area
476 – 1,148 sq ft
Towers
4
Floors
26
Total homes
594
Land
9.43 acres
Possession (RERA)
Nov 2029
Built (RERA update)
Not found in public records yet: construction progress

Soul of the Seasons RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/190625/007855
Registered on
19 Jun 2025
Promised completion
30 Nov 2029
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 1PRM/KA/RERA/1251/310/PR/190625/00785530 Nov 2029282New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 2PRM/KA/RERA/1251/446/PR/260226/00849130 Nov 2029312New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Tower APhase 1221136
Tower BPhase 1241146
Tower CPhase 2252152
Tower DPhase 2262160

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Soul of the Seasons is a residential project by NBR Projects LLP in Kachamaranahalli, Bengaluru South, with 594 homes across 2 phases and 4 towers. Phase 1 has 282 homes and Phase 2 has 312 homes, with completion scheduled for 30 November 2029.

Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Others, BoreWell
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 1
HDFC, Agara Junction, Bangalore
Escrow bank (RERA) · Phase 2
HDFC, AGARA JUNCTION BRANCH BANGALORE

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation
  • Community Hall
  • Piped Gas

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Soul of the Seasons location and address

Address
Survey No. 27/3 (PART), 27/6, 27/26 (PART), 45/1 (PART) of Kachamaranahalli Village, , Varthur Hobli, Bengaluru East Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560087
Village (RERA)
Kachamaranahalli
Locality
Sarjapur RoadAlso known as Sarjapura Road, Sarjapur Main Road, Sarjapura Main Road
PIN code
560087
City
Bengaluru
State
Karnataka
Coordinates
12.90410, 77.73960

Distances to landmarks

Not found in public records yet: landmarks

About Sarjapur Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)6.69 kmapprox. 27 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)9.29 kmapprox. 38 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)10.1 kmapprox. 41 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)20.18 kmapprox. 82 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)20.61 kmapprox. 83 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)33.2 kmapprox. 134 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 11Schools and colleges11 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • Sri Sri Ravishankar Vidya Mandir · 0.86 km
  • Inventure Academy · 1.05 km
  • Global Indian International School (GIIS) · 1.08 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction6.41 km
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction6.45 km
  • Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction6.94 km
  • Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station8.22 km
  • Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station3.68 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Hegondanahalli Lake, 327 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Soul of the Seasons floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure

Floor plans6 files

  • Soul of the Seasons: 6 Ground to 25th & Terrance floor Plan (Tower 3) (filed with Karnataka RERA)
    Phase 2: 6 Ground to 25th & Terrance floor Plan (Tower 3)Filed 8 Feb 2026 · Full PDF on RERA
  • Soul of the Seasons: 6 Ground to 25th & Terrance floor Plan (Tower 3) (filed with Karnataka RERA)
    Phase 2: 6 Ground to 25th & Terrance floor Plan (Tower 3)Filed 8 Feb 2026 · Full PDF on RERA
  • Soul of the Seasons: 6 Ground to 26 & Terrace floor plan Tower 4 (filed with Karnataka RERA)
    Phase 2: 6 Ground to 26 & Terrace floor plan Tower 4Filed 8 Feb 2026 · Full PDF on RERA
  • Soul of the Seasons: 6 Ground to 26 & Terrace floor plan Tower 4 (filed with Karnataka RERA)
    Phase 2: 6 Ground to 26 & Terrace floor plan Tower 4Filed 8 Feb 2026 · Full PDF on RERA
  • Soul of the Seasons: Basement Floor plan - Tower 3 & 4 (filed with Karnataka RERA)
    Phase 2: Basement Floor plan - Tower 3 & 4Filed 8 Feb 2026 · Full PDF on RERA
  • Soul of the Seasons: Basement Floor Plan-Tower 3 & 4 (filed with Karnataka RERA)
    Phase 2: Basement Floor Plan-Tower 3 & 4Filed 8 Feb 2026 · Full PDF on RERA

Elevations4 files

Approved building plan2 files

Home typeCarpet areaHomes
1 BHK476 sq ft4
3 BHK476 – 1,148 sq ft590

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Soul of the Seasons possession date and construction status

  • Phase 142%

    as on · 124 of 282 homes booked

  • Phase 26%

    as on · 49 of 312 homes booked

Timeline

  1. 1 Jun 2025Phase 1: Project start date given to RERA
  2. 19 Jun 2025Phase 1: Registered with Karnataka RERA
  3. 1 Feb 2026Phase 2: Project start date given to RERA
  4. 26 Feb 2026Phase 2: Registered with Karnataka RERA
  5. 30 Nov 2029Phase 1: Completion date given at registration
  6. 30 Nov 2029Phase 2: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 1)

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around Aug 2028 — about 16 months before the completion date on RERA (30 Nov 2029).

At the pace between the 4 quarterly filings we have (12% → 42% in 9 months), it would be around Mar 2028 — about 21 months before the RERA date.

This project has 2 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.

0%25%50%75%100%20262027202820292030RERA date12%21%31%42%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202642%124 of 282
Q1 2026-27to 30 Jun 202610 Jul 202631%124 of 282
Q4 2025-26to 31 Mar 202610 Apr 202621%117 of 282
Q3 2025-26to 31 Dec 202511 Jan 202612%80 of 282
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 42% ÷ 16 months (1 Jun 2025 to 30 Sep 2026) = 2.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 58 ÷ 2.6 = 22 months → Aug 2028. This is an estimate, not a date from the builder or RERA.

Pace between filings = (42% − 12%) ÷ 9 months = 3.3% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

18 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 1)BDA - Bangalore Development Authority · No. BDA/TPM/DLP-14/3203/24-25 · dated 2025-03-05Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (4 orders) (Phase 1)District Collector, Bengaluru · No. 676348 and 3 more · dated 2024-11-28Source (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 2)BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26 · dated 2025-10-08Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders) (Phase 2)DC , BANGALORE URBAN DISTRICT · No. 629124 and 2 more · dated 2024-06-28Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 2)

As on 19 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26 · dated 8 Oct 2025
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Soul of the Seasons RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About NBR Projects LLP

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
ABB-5602

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

NBR Projects LLP’s RERA record

NBR Projects LLP delivery record

As on 20 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2025

As on 20 Oct 2026
  1. 14 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 42% built, 124 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 6% built, 49 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 11 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 2% built, 22 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 10 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 31% built, 124 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 10 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 21% built, 117 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 10 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 1% built, 0 of 312 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 26 Feb 2026Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/260226/008491); completion date 30 Nov 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 1 Feb 2026Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 11 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 12% built, 80 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 8 Oct 2025Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. BDA/NM/AS/AA-1/TS-4/P/47/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 19 Jun 2025Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/190625/007855); completion date 30 Nov 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 1 Jun 2025Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 5 Mar 2025Phase 1: Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP-14/3203/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Soul of the Seasons FAQs

What is the RERA registration number for Soul of the Seasons?

Phase 1 is registered as PRM/KA/RERA/1251/310/PR/190625/007855 and Phase 2 as PRM/KA/RERA/1251/446/PR/260226/008491.

When will Soul of the Seasons be completed?

Both phases are scheduled for completion on 30 November 2029 according to the RERA record.

What home types are available in Soul of the Seasons?

Phase 1 offers 280 units of 3 BHK (948 to 1,148 sq ft carpet area) and 2 units of 1 BHK (476 sq ft carpet area). Phase 2 offers 310 units of 3 BHK (476 to 1,148 sq ft carpet area) and 2 units of 1 BHK (476 sq ft carpet area).

How many homes are in each phase of Soul of the Seasons?

Phase 1 has 282 homes across 2 towers with a maximum of 24 floors, and Phase 2 has 312 homes across 2 towers with a maximum of 26 floors.

What is the construction progress of Soul of the Seasons?

As of Q2 2026-27 (quarter ended 30 September 2026), Phase 1 is 42% complete and Phase 2 is 6% complete.

How many homes have been booked in Soul of the Seasons?

As of Q2 2026-27 (quarter ended 30 September 2026), 124 homes have been booked in Phase 1 and 49 homes in Phase 2.

Where is Soul of the Seasons located?

Soul of the Seasons is located in Kachamaranahalli, Bengaluru South taluk, with PIN code 560087.

Are there any RERA complaints filed against Soul of the Seasons?

There are no RERA complaints on record for this project or against the builder NBR Projects LLP.

Which bank holds the escrow for Soul of the Seasons?

HDFC is the escrow bank for both Phase 1 and Phase 2.

How many projects does NBR Projects LLP have in the RERA record?

NBR Projects LLP has 1 project in the Bengaluru RERA records, which is Soul of the Seasons.

Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Soul of the Seasons

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from NBR Projects LLP? Review the builder.

Reviews of NBR Projects LLP by verified buyers

No verified reviews of NBR Projects LLP yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
The Right LifeNeobuild Ventures LLP0.9 km683Dec 203543%0Not collected
Mana Skanda The Right Life T789Neobuild Ventures LLP1.1 km825Dec 202925%1Not collected
Mana Skanda The Right Life T45Neobuild Ventures LLP1.1 km592Jun 203020%1Not collected
Mana Skanda The Right Life T6Neobuild Ventures LLP1.1 km126Jun 203015%0Not collected
Abhee Celestial CityNexplace Infrastructure1.2 km399Jun 202964%0Not collected
Abhee AariaAbhee Ventures Private Limited1.2 km1,017May 203123%1Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/190625/007855, PRM/KA/RERA/1251/446/PR/260226/008491.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Sarjapur Road