Sparkle Atmos
1, 2 & 3 BHK apartments by Barmecha Properties · Kammasandra Agrahara, near Chandapura–Attibele, Bengaluru
Kammasandra Agrahara, near Chandapura–Attibele, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sparkle Atmos at a glance
- Possession (RERA)Dec 2028Karnataka RERA
- Construction30% built · on pace for Mar 2030 14 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked100 of 126 (79%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 9 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 208 min at peak51.31 km straight line · estimate
- Nearest lakeUnnamed lake · 1,380 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sparkle Atmos is a residential project by Barmecha Properties in Kammasandra Agrahara, Bengaluru with 126 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sparkle Atmos buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Barmecha Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sparkle Atmos buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 447 – 923 sq ft
- Towers
- 2
- Floors
- 10
- Total homes
- 126
- Land
- 2.07 acres
- Possession (RERA)
- Dec 2028
- Built (RERA update)
- 30%
Sparkle Atmos RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/030525/007706
- Registered on
- 3 May 2025
- Promised completion
- 31 Dec 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 100 of 126 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SPARKLE ATMOS TOWER A | 10 | 1 | 66 |
| SPARKLE ATMOS TOWER B | 9 | 1 | 60 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sparkle Atmos is a 2-tower residential project by Barmecha Properties in Kammasandra Agrahara, Anekal, with 126 homes. The project is registered with RERA and is expected to be completed on 31 December 2028.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 77.5% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Koramangala
- Building plan (RERA)
- Anekal Planning Authority · No. CC/1053/2024-25 · dated 1 Mar 2025
- Project cost declared to RERA
- ₹84.06 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sparkle Atmos location and address
- Address
- Converted Sy No 42/1 and 42/3 situated at Kammasandra Agrahara Village , Kasaba Hobli Anekal Taluk , Anekal , Bengaluru Urban, Karnataka - 562106
- Village (RERA)
- Kammasandra Agrahara
- Locality
- Near Chandapura–AttibeleAlso known as Chandapura, Attibele
- PIN code
- 562106
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.73934, 77.70085
Distances to landmarks
Not found in public records yet: landmarksAbout Kammasandra Agrahara
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 12.87 km | approx. 52 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 20.61 km | approx. 83 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.9 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.13 km | approx. 122 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 35.44 km | approx. 144 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 51.31 km | approx. 208 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges0 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Alliance University · 1.31 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station9 km
- Anekal Road (ಆನೇಕಲ್ ರಸ್ತೆ)Nearest railway station2.04 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,380 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,380 m
- Marsur Lake on OpenStreetMap (opens in a new tab) 1,806 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,812 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sparkle Atmos home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan

Approved Building PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 447 sq ft | 4 |
| 2 and 3 BHK flats | Not found in public records yet: carpet area | 126 |
| 2.5 BHK | 745 – 753 sq ft | 38 |
| 3 BHK | 860 – 923 sq ft | 84 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sparkle Atmos possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 4 | 4 | 0 |
| 2.5 BHK | 38 | 33 | 5 |
| 3 BHK | 84 | 63 | 21 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 10 Apr 2025Project start date given to RERA
- 3 May 2025Registered with Karnataka RERA
- 31 Dec 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2030 — about 14 months after the completion date on RERA (31 Dec 2028).
At the pace between the 4 quarterly filings we have (4% → 30% in 9 months), it would be around Oct 2028 — about 3 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 30% | 100 of 126 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 30% | 91 of 126 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 20% | 83 of 126 |
| Q3 2025-26to 31 Dec 2025 | 10 Feb 2026 | 4% | 53 of 126 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 30% ÷ 17.7 months (10 Apr 2025 to 30 Sep 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 70 ÷ 1.7 = 41.2 months → Mar 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (30% − 4%) ÷ 9 months = 2.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Anekal Planning Authority · No. CC/1053/2024-25 · dated 2025-03-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Deputy Commissioner Bangalore Urban District · No. 299576 and 1 more · dated 2022-03-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Anekal Planning Authority · No. CC/1053/2024-25 · dated 1 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sparkle Atmos RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Barmecha Properties
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Barmecha Properties’s RERA recordBarmecha Properties delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Barmecha Properties in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 126Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 126 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 30% built, 100 of 126 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 30% built, 91 of 126 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 20% built, 83 of 126 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Feb 2026Quarterly update filed for Q3 2025-26: 4% built, 53 of 126 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 May 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/030525/007706); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2025Building plan approved by Anekal Planning Authority (No. CC/1053/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sparkle Atmos FAQs
What is Sparkle Atmos?
Sparkle Atmos is a residential project by Barmecha Properties located in Kammasandra Agrahara, Anekal, Bengaluru Urban, PIN 562106.
How many homes and towers does Sparkle Atmos have?
The project has 126 homes across 2 towers, each with a maximum of 10 floors.
What home types are available in Sparkle Atmos?
The project offers 3 BHK (84 homes), 2.5 BHK (38 homes), and 1 BHK (4 homes).
What is the carpet area range for homes in Sparkle Atmos?
Carpet areas range from 447 sq ft for 1 BHK homes to 923 sq ft for 3 BHK homes.
When will Sparkle Atmos be completed?
The project completion date on RERA is 31 December 2028.
What is the RERA registration number for Sparkle Atmos?
The RERA registration number is PRM/KA/RERA/1251/308/PR/030525/007706, registered on 3 May 2025.
How many homes have been booked in Sparkle Atmos?
As of Q2 2026-27 (quarter ended 30 September 2026), 100 homes have been booked out of 126.
What is the construction progress of Sparkle Atmos?
As of Q2 2026-27, the project is 30% complete.
Are there any RERA complaints against Sparkle Atmos or its builder?
There are no RERA complaints on this project or against Barmecha Properties.
What is the escrow bank for Sparkle Atmos?
The escrow bank for the project is HDFC.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sparkle Atmos
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Barmecha Properties? Review the builder.
Reviews of Barmecha Properties by verified buyers
No verified reviews of Barmecha Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| LegacyGlobal Edifice Infra | 3 km | 56 | May 2028 | 100% | 0 | Not collected |
| Aavya HomesSon Infra Enterprises | 3.4 km | 80 | Dec 2028 | 70% | 0 | Not collected |
| AradhraAdish Properties | 3.6 km | 56 | Jan 2026extended | 100% | 0 | Not collected |
| LS Mark IxLiving Structures | 3.7 km | 60 | Dec 2029 | 9% | 0 | Not collected |
| Sriven Daksha EliteM/S. Sriven Properties | 4.5 km | 168 | Aug 2026extended | — | 14 | Not collected |
| DS Max SukruthDS Max Realty Private Ltd | 4.6 km | 304 | Feb 2026 | 100% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/030525/007706.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Marasur, Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openLegacy
by Global Edifice Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 679 – 1,033 sq ft
- May 2028
56 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Legacy- Kammasandra, Electronic City Phase 2Under constructionRERA registeredBuyers’ group open
Aavya Homes
by Son Infra Enterprises
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 646 – 960 sq ft
- Dec 2028
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aavya Homes
Madiwala, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openAradhra
by Adish Properties
Price: Price on requestGet brochure & price →
- 2 BHK
- 744 – 1,118 sq ft
- Jan 2026 (extended)
RERA not updated since promised Jan 2026 · 56 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aradhra