Sree Urban Orchids
1, 2, 3 & 4 BHK apartments by Sree Builders And Developers · Panathur, Bengaluru
Panathur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Sree Builders And Developers
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sree Urban Orchids at a glance
- Possession (RERA)Mar 2028Karnataka RERA
- Construction58% built · on pace for May 2029 13 mo after RERA dateRERA filing to 30 Sep 2026 (Phase-II); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroKodibisanahalli · 2.02 km (under construction)Open now: Kundalahalli, 5.25 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 122 min at peak30.03 km straight line · estimate
- Nearest lakePanathur Chikka Kere · 77 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sree Urban Orchids is a residential project by Sree Builders And Developers in Panathur, Bengaluru with 335 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2028. It is registered in 2 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sree Urban Orchids buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sree Builders And Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sree Urban Orchids buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 516 – 1,435 sq ft
- Towers
- 4
- Floors
- 4
- Total homes
- 335
- Land
- 4.62 acres
- Possession (RERA)
- Mar 2028
- Built (RERA update)
- Not found in public records yet: construction progress
Sree Urban Orchids RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/131022/005317
- Registered on
- 13 Oct 2022
- Promised completion
- 31 Mar 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/446/PR/131022/005317 | 1 Dec 2025 | 79 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-II | PRM/KA/RERA/1251/446/PR/160523/005939 | 31 Mar 2028 | 256 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| SREE URBAN ORCHIDS | Main registration | 4 | 1 | 79 |
| BLOCK-A | Phase-II | 3 | 1 | 112 |
| BLOCk-B | Phase-II | 3 | 1 | 112 |
| BLOCK-C | Phase-II | 3 | 1 | 32 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sree Urban Orchids is a residential project by Sree Builders And Developers in Panathur, Bengaluru East. The project has 335 homes across two phases: Phase 1 with 79 homes in 1 tower (4 floors) completing on 1 December 2025, and Phase 2 with 256 homes in 3 towers (3 floors) completing on 31 March 2028.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- Axis Bank, Panathur
- Escrow bank (RERA) · Phase-II
- Axis Bank, PANATHUR
Amenities
- Electricity
- Community Hall
- Swimming Pool
- Gym
- Power Backup
- CCTV Surveillance
- Club House
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sree Urban Orchids location and address
- Address
- Sy No. 39/7, Panathur Village , Varthur Hobli, , Bangalore East Taluk , Bengaluru, Karnataka - 560103 , Bengaluru East , Bengaluru Urban, Karnataka - 560103
- Village (RERA)
- Panathur
- Locality
- Panathur
- PIN code
- 560103
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.93075, 77.70945
Distances to landmarks
Not found in public records yet: landmarksAbout Panathur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 3.16 km | approx. 13 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 7.03 km | approx. 28 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 10.22 km | approx. 41 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.05 km | approx. 65 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.27 km | approx. 66 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.03 km | approx. 122 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 16Schools and colleges11 schools, 2 colleges, 3 kindergartens
- 9Hospitals and clinics1 hospitals, 8 clinics
Nearest schools and colleges
- Ekya Nava · 1.02 km
- Orchids The International School, Panathur · 1.18 km
- Gunjur Palya Government School · 1.2 km
Nearest hospitals and clinics
- Maya Hospital · 0.83 km
- Sai Clinic · 0.93 km
- Dr Swarna Skin Hair & Laser Clinic · 0.98 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction2.02 km
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction2.38 km
- Marathahalli (ಮಾರತಹಳ್ಳಿ)Blue Line metro, under construction3.15 km
- Kundalahalli (ಕುಂದಲಹಳ್ಳಿ)Open now — nearest operating metro station5.25 km
- Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station0.9 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Panathur Chikka Kere, 77 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Panathur Chikka Kere on OpenStreetMap (opens in a new tab) 77 m
- Panathuru Kere on OpenStreetMap (opens in a new tab) (ಪಣತೂರು ಕೆರೆ)199 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 813 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sree Urban Orchids floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

Main registration: BrochureFull PDF on RERA 







Phase-II: BrochureFull PDF on RERA 




Approved building plan5 pages

Phase-II: Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan5 files

Phase-II: Approved Layout PlanFull PDF on RERA 
Phase-II: Existing Layout PlanFull PDF on RERA 
Main registration: Single Layout PlanFiled 22 Sep 2022 · Full PDF on RERA 
Phase-II: Single Layout PlanFiled 18 Apr 2023 · Full PDF on RERA 
Main registration: SINGLE LAYOUT PLANFiled 6 Oct 2022 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 516 sq ft | 5 |
| 2 BHK | 695 – 933 sq ft | 138 |
| 3 BHK | 769 – 1,218 sq ft | 173 |
| 4 BHK | 920 – 1,435 sq ft | 14 |
| Flats | 949 sq ft | 256 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sree Urban Orchids possession date and construction status
Timeline
- 1 Apr 2022Main registration: Project start date given to RERA
- 13 Oct 2022Main registration: Registered with Karnataka RERA
- 3 Mar 2023Phase-II: Project start date given to RERA
- 16 May 2023Phase-II: Registered with Karnataka RERA
- 1 Dec 2025Main registration: Completion date given at registration
- 31 Mar 2028Phase-II: Completion date given at registration
Construction pace from RERA quarterly filings (Phase-II)
At the average pace so far, construction would reach 100% around May 2029 — about 13 months after the completion date on RERA (31 Mar 2028).
At the pace between the 4 quarterly filings we have (45% → 58% in 9 months), it would be around Feb 2029 — about 11 months after the RERA date.
This project has 2 RERA registrations; the chart uses Phase-II, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 58% | 120 of 256 |
| Q1 2026-27to 30 Jun 2026 | 14 Oct 2026 | 56% | 116 of 256 |
| Q4 2025-26to 31 Mar 2026 | 14 Oct 2026 | 50% | 111 of 256 |
| Q3 2025-26to 31 Dec 2025 | 14 Oct 2026 | 45% | 105 of 255 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 58% ÷ 42.9 months (3 Mar 2023 to 30 Sep 2026) = 1.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 42 ÷ 1.4 = 31.1 months → May 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (58% − 45%) ÷ 9 months = 1.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
24 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/0008/22-23 · dated 2022-05-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Main registration) | Special Deputy Commissioner, Bangalore · No. ALN(VA-2)/(P)/SR/7/2016-17 · dated 2016-08-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase-II) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. No BBMP/Ad.Com/MDp/0563/22-23 & PRJ No.8832/22-23 · dated 2023-03-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase-II) | DC BANGALORE URBAN · No. ALN/V-2/P/SR/45/2017-18 · dated 2018-04-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase-II)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. No BBMP/Ad.Com/MDp/0563/22-23 & PRJ No.8832/22-23 · dated 3 Mar 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Sree Urban Orchids RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sree Builders And Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sree Builders And Developers’s RERA recordSree Builders And Developers delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Sree Builders And Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 335Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 335 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2022
- 15 Oct 2026Phase-II: Quarterly update filed for Q2 2026-27: 58% built, 120 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase-II: Quarterly update filed for Q3 2025-26: 45% built, 105 of 255 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase-II: Quarterly update filed for Q4 2025-26: 50% built, 111 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase-II: Quarterly update filed for Q1 2026-27: 56% built, 116 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Mar 2026Main registration: Quarterly update filed for Q3 2025-26: 99% built, 79 of 79 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 May 2023Phase-II: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/160523/005939); completion date 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Mar 2023Phase-II: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. No BBMP/Ad.Com/MDp/0563/22-23 & PRJ No.8832/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Mar 2023Phase-II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Oct 2022Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/131022/005317); completion date 1 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 May 2022Main registration: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/CC/0008/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2022Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sree Urban Orchids FAQs
What is the completion date for Sree Urban Orchids Phase 1?
Phase 1 is scheduled to complete on 1 December 2025 according to the RERA record.
When will Phase 2 of Sree Urban Orchids be completed?
Phase 2 is scheduled to complete on 31 March 2028.
How many homes are in Sree Urban Orchids?
The project has 335 homes in total: 79 homes in Phase 1 and 256 homes in Phase 2.
What home types are available in Sree Urban Orchids Phase 1?
Phase 1 has 1 BHK (516 sq ft carpet area), 2 BHK (695-933 sq ft), and 3 BHK (917-1,077 sq ft).
What home types are available in Sree Urban Orchids Phase 2?
Phase 2 has 2 BHK (769-920 sq ft), 3 BHK (769-1,218 sq ft), and 4 BHK (920-1,435 sq ft) homes.
What is the construction progress of Sree Urban Orchids Phase 2?
As of Q2 2026-27 (ended 30 September 2026), Phase 2 is 58% complete with 120 homes booked out of 256.
How many homes are booked in Sree Urban Orchids Phase 1?
As of Q3 2025-26 (ended 31 December 2025), all 79 homes in Phase 1 have been booked.
What are the RERA registration numbers for Sree Urban Orchids?
Phase 1 is registered as PRM/KA/RERA/1251/446/PR/131022/005317 and Phase 2 is registered as PRM/KA/RERA/1251/446/PR/160523/005939.
Are there any RERA complaints against Sree Urban Orchids or the builder?
There are no RERA complaints filed against this project or against Sree Builders And Developers.
Where is Sree Urban Orchids located?
The project is located in Panathur, Bengaluru East, PIN code 560103.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sree Urban Orchids
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sree Builders And Developers? Review the builder.
Reviews of Sree Builders And Developers by verified buyers
No verified reviews of Sree Builders And Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh Parkland Phase 1Akarsha Realty Private Limited | 0.3 km | 644 | Dec 2027 | 74% | 0 | Not collected |
| Adarsh Parkland Phase 2Shivakar Infra Private Limited | 0.3 km | 1,050 | Mar 2030 | 6% | 0 | Not collected |
| Meda East WindsMeda Projects | 0.6 km | 542 | Dec 2028 | 53% | 0 | Not collected |
| SV PolarisSV Housing | 0.8 km | 223 | Dec 2026 | 67% | 0 | Not collected |
| Infinity GreenwoodsInfinity Builders And Constructions | 0.8 km | 84 | Dec 2026 | 86% | 0 | Not collected |
| D C Capitol Phase – IID.C.Hi-Rise LLP | 0.9 km | 164 | Dec 2028 | 83% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/131022/005317, PRM/KA/RERA/1251/446/PR/160523/005939.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Panathur
PanathurUnder constructionRERA registeredBuyers’ group openAdarsh Parkland Phase 1
by Akarsha Realty
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK
- 420 – 662 sq ft
- Dec 2027
644 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Parkland Phase 1
PanathurUnder constructionRERA registeredBuyers’ group openAdarsh Parkland Phase 2
by Shivakar Infra
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 250 – 1,224 sq ft
- Mar 2030
1,050 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Parkland Phase 2
PanathurUnder constructionRERA registeredBuyers’ group openMeda East Winds
by Meda
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, +1 more
- 397 – 1,581 sq ft
- Dec 2028
542 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Meda East Winds