The Arbour Residences
3 & 4 BHK apartments by F4 Estates LLP and G Corp Housing Pvt Ltd · Frazer Town, Bengaluru
Frazer Town, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by F4 Estates LLP and G Corp Housing Pvt Ltd
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Arbour Residences at a glance
- Possession (RERA)Oct 2028Karnataka RERA
- Construction29% built · on pace for Nov 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked2 of 16 (13%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroTannery Road · 1.38 km (under construction)Open now: Halasuru, 2.84 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 96 min at peak23.76 km straight line · estimate
- Nearest lakeKacharakanahalli Lake · 1,576 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Arbour Residences is a residential project by F4 Estates LLP and G Corp Housing Pvt Ltd in Bengaluru with 16 homes, registered with Karnataka RERA. The completion date on RERA is 30 Oct 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
The Arbour Residences buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks F4 Estates LLP and G Corp Housing Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the The Arbour Residences buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 1,292 – 2,549 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 16
- Land
- 0.32 acres
- Possession (RERA)
- Oct 2028
- Built (RERA update)
- 29%
The Arbour Residences RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/290426/008607
- Registered on
- 29 Apr 2026
- Promised completion
- 30 Oct 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 2 of 16 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 4 | 0 | 16 |
A dash (—) means the filing did not state that value.
Summary in plain English
The Arbour Residences is a residential project by F4 Estates LLP and G Corp Housing Pvt Ltd in Bengaluru North with 16 homes across 1 tower of 4 floors. The project is registered with Karnataka RERA and is expected to be completed on 30 October 2028.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 36.6% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, MG ROAD
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BNCC/0798/25-26IN · dated 10 Mar 2026
- Project cost declared to RERA
- ₹35.69 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
The Arbour Residences location and address
- Address
- “The Arbour Residences”, No 17, New Municipal No 174, D'Costa Layout, Wheeler Road Extension, , Cooke Town, Maruthi Seva Nagar Bengaluru – 560 084 , Bengaluru North , Bengaluru Urban, Karnataka - 560084
- Village (RERA)
- Not found in public records yet: village
- Locality
- Frazer TownAlso known as Pulikeshi Nagar
- PIN code
- 560084
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.00190, 77.62394
Distances to landmarks
Not found in public records yet: landmarksAbout Frazer Town
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 5.16 km | approx. 21 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 6.46 km | approx. 26 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.68 km | approx. 43 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.43 km | approx. 50 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.5 km | approx. 71 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 23.76 km | approx. 96 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 44Schools and colleges33 schools, 5 colleges, 6 kindergartens
- 47Hospitals and clinics19 hospitals, 28 clinics
Nearest schools and colleges
- Santorini Montessori · 0.15 km
- Maria Niketana School · 0.32 km
- Trotters Montessori School · 0.39 km
Nearest hospitals and clinics
- Prestige Medical Healthcare PMHS · 0.12 km
- Katherina Kasper Leprosy Control Scheme · 0.26 km
- Katherina Kasper Clinic · 0.26 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Tannery Road (ತನ್ನೆರಿ ರೋಡ್)Pink Line metro, under construction1.38 km
- Pottery Town (ಪೊಟರಿ ಟೌನ್)Pink Line metro, under construction1.58 km
- Venkateshapura (ವೆಂಕಟೇಶಪುರ)Pink Line metro, under construction1.83 km
- Halasuru (ಹಲಸೂರು)Open now — nearest operating metro station2.84 km
- Bengaluru East (ಬೆಂಗಳೂರು ಪೂರ್ವ)Nearest railway station0.61 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kacharakanahalli Lake, 1,576 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kacharakanahalli Lake on OpenStreetMap (opens in a new tab) (ಕಾಚರಕನಹಳ್ಳಿ ಕೆರೆ)1,576 m
- Halasuru lake on OpenStreetMap (opens in a new tab) (ಹಲಸೂರು ಕೆರೆ)1,603 m
- Immersion Tank on OpenStreetMap (opens in a new tab) 1,725 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Arbour Residences floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan3 files

Approved Building PlanFull PDF on RERA 
TAR Sanction Plan GBA_BNCC_0798_25-26 (1)Filed 17 Apr 2026 · Full PDF on RERA 
TAR Sanction Plan GBA_BNCC_0798_25-26 (1)Filed 23 Apr 2026 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,512 – 1,866 sq ft | 12 |
| 3 BHK smart | 1,292 sq ft | 1 |
| 3 BHK type 1 | 1,636 sq ft | 6 |
| 3 BHK type 1 ph | 1,636 sq ft | 1 |
| 3 BHK type 2 | 1,647 sq ft | 2 |
| 3 BHK type 2 ph | 1,636 sq ft | 1 |
| 3 BHK type 3 ph | 1,647 sq ft | 1 |
| 4 BHK | 2,549 sq ft | 4 |
| 4 BHK + servant room | 2,239 sq ft | 3 |
| 4 BHK ph | 2,239 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
The Arbour Residences possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-12.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 12 | 2 | 10 |
| 4 BHK | 4 | 0 | 4 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 11 Apr 2026Project start date given to RERA
- 29 Apr 2026Registered with Karnataka RERA
- 30 Oct 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Nov 2027 — about 11 months before the completion date on RERA (30 Oct 2028).
At the pace between the 2 quarterly filings we have (17% → 29% in 3 months), it would be around Mar 2028 — about 7 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 12 Oct 2026 | 29% | 2 of 16 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 17% | 1 of 16 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 29% ÷ 5.7 months (11 Apr 2026 to 30 Sep 2026) = 5.1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 71 ÷ 5.1 = 13.8 months → Nov 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (29% − 17%) ÷ 3 months = 4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-12.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BNCC/0798/25-26IN · dated 2026-03-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BNCC/0798/25-26IN · dated 10 Mar 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
The Arbour Residences RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About F4 Estates LLP and G Corp Housing Pvt Ltd
- Promoter type
- Other ( LLP & Company )
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
F4 Estates LLP and G Corp Housing Pvt Ltd’s RERA recordF4 Estates LLP and G Corp Housing Pvt Ltd delivery record
- 1Projects in Bengaluru on RERA1 approved registration under F4 Estates LLP and G Corp Housing Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 16Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 16 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2026
- 12 Oct 2026Quarterly update filed for Q2 2026-27: 29% built, 2 of 16 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 17% built, 1 of 16 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Apr 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/290426/008607); completion date 30 Oct 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Apr 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2026Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. GBA/BNCC/0798/25-26IN) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
The Arbour Residences FAQs
What is the RERA registration number for The Arbour Residences?
The RERA registration number is PRM/KA/RERA/1251/309/PR/290426/008607, registered on 29 April 2026.
Where is The Arbour Residences located?
The project is located in Bengaluru North taluk, Bengaluru Urban district, with PIN code 560084.
How many homes does The Arbour Residences have?
The project has 16 homes in total.
What home types are available in The Arbour Residences?
The project offers 3 BHK homes with carpet areas from 1,292 to 1,866 sq ft, and 4 BHK homes with carpet areas from 2,239 to 2,549 sq ft, along with a 4 BHK penthouse.
What is the expected completion date for The Arbour Residences?
The project is expected to be completed on 30 October 2028.
What is the construction progress of The Arbour Residences?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 29% complete.
How many homes have been booked in The Arbour Residences?
As of Q2 2026-27, 2 homes have been booked out of 16 homes available.
Are there any RERA complaints against The Arbour Residences?
There are no RERA complaints on record for this project or against the builder.
Who are the builders of The Arbour Residences?
The project is built by F4 Estates LLP and G Corp Housing Pvt Ltd.
How many other projects does the builder of The Arbour Residences have on RERA record?
The builder has 1 project in the Bengaluru records, which is The Arbour Residences.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Arbour Residences
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from F4 Estates LLP and G Corp Housing Pvt Ltd? Review the builder.
Reviews of F4 Estates LLP and G Corp Housing Pvt Ltd by verified buyers
No verified reviews of F4 Estates LLP and G Corp Housing Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| DS Max SwastikaAsha Satish | 2.9 km | 68 | Mar 2027 | 89% | 0 | Not collected |
| Magnolia DelightMagnolia Infrastructure Development Limited | 3.3 km | 48 | Mar 2028 | 50% | 0 | Not collected |
| Nithya Infra SunshineNithya Infra Sunshine | 3.5 km | 40 | Dec 2027 | 87% | 0 | Not collected |
| Nava GokulamNavajyothi Constructions | 4.7 km | 180 | Dec 2025 | — | 0 | Not collected |
| Inspira Tropical GardenIinspira Tropical Garden LLP | 4.8 km | 181 | Jun 2026 | 95% | 1 | Not collected |
| Pavani HeightsAnjani Constructions | 4.8 km | 111 | Jun 2027extended | 50% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/290426/008607.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Frazer Town
Doddagubbi, near Hennur RoadUnder constructionRERA registeredBuyers’ group openDS Max Swastika
by Asha Satish
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 529 – 1,131 sq ft
- Mar 2027
68 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DS Max Swastika
Matadahalli, HebbalUnder constructionRERA registeredBuyers’ group openMagnolia Delight
by Magnolia Infrastructure Development
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,433 – 1,641 sq ft
- Mar 2028
48 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Magnolia Delight
Chelkere, Kalyan Nagar–HRBRUnder constructionRERA registeredBuyers’ group openNithya Infra Sunshine
by Nithya Infra Sunshine
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 647 – 1,165 sq ft
- Dec 2027
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Nithya Infra Sunshine