The Clan
2 & 3 BHK apartments by M/S. Global Edifice Infra · Sarjapur, Bengaluru
Sarjapura, Sarjapur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Clan at a glance
- Possession (RERA)Dec 2028Karnataka RERA
- Construction41% built · on pace for Jul 2028RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked38 of 258 (15%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 12.62 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 160 min at peak39.43 km straight line · estimate
- Nearest lakeSarjapura Lake · 517 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Clan is a residential project by M/S. Global Edifice Infra in Sarjapura, Bengaluru with 258 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
The Clan buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/S. Global Edifice Infra for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the The Clan buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 727 – 1,110 sq ft
- Towers
- 1
- Floors
- 9
- Total homes
- 258
- Land
- 3.29 acres
- Possession (RERA)
- Dec 2028
- Built (RERA update)
- 41%
The Clan RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/091025/008153
- Registered on
- 9 Oct 2025
- Promised completion
- 31 Dec 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 38 of 258 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER-1 | 9 | 2 | 258 |
A dash (—) means the filing did not state that value.
Summary in plain English
The Clan is a residential project by M/S. Global Edifice Infra in Sarjapura, Anekal. It has 258 homes in 1 tower of 9 floors, set to be completed by 31 December 2028.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 49.8% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, SSI KUMARA PARK
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/337/24-25 · dated 12 Mar 2025
- Project cost declared to RERA
- ₹149 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
The Clan location and address
- Address
- Survey number 310/2, Katha number : 150200102300126414(1645/310/2) , Sarjapura village, Sarjapura Hobli, Anekal Taluk, Bangalore , Anekal , Bengaluru Urban, Karnataka - 562125
- Village (RERA)
- Sarjapura
- Locality
- SarjapurAlso known as Sarjapura
- PIN code
- 562125
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.85797, 77.79783
Distances to landmarks
Not found in public records yet: landmarksAbout Sarjapur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 14.43 km | approx. 58 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 14.6 km | approx. 59 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 15.82 km | approx. 64 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 28.12 km | approx. 114 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.62 km | approx. 116 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 39.43 km | approx. 160 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges7 schools, 0 colleges, 0 kindergartens
- 4Hospitals and clinics2 hospitals, 2 clinics
Nearest schools and colleges
- Aikhyatha Public School · 0.69 km
- New Oxford · 1.09 km
- Sri Ram Public School · 1.42 km
Nearest hospitals and clinics
- Nandi Health Care · 0.54 km
- Town Hospital · 0.91 km
- Sri Rama Clinic · 0.98 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station12.62 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station9.47 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Sarjapura Lake, 517 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Sarjapura Lake on OpenStreetMap (opens in a new tab) (ಸರ್ಜಾಪುರ ಕೆರೆ)517 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,215 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,416 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Clan home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan

Approved Building PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 727 – 887 sq ft | 58 |
| 2.5 BHK | 925 – 954 sq ft | 10 |
| 3 BHK | 804 – 1,110 sq ft | 190 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
The Clan possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 58 | 9 | 49 |
| 2.5 BHK | 10 | 0 | 10 |
| 3 BHK | 190 | 29 | 161 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 4 Jul 2025Project start date given to RERA
- 9 Oct 2025Registered with Karnataka RERA
- 31 Dec 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2028 — about 6 months before the completion date on RERA (31 Dec 2028).
At the pace between the 4 quarterly filings we have (15% → 41% in 9 months), it would be around Jun 2028 — about 7 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 41% | 38 of 258 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 30% | 18 of 258 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 24% | 12 of 258 |
| Q3 2025-26to 31 Dec 2025 | 12 Feb 2026 | 15% | 7 of 258 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 41% ÷ 14.9 months (4 Jul 2025 to 30 Sep 2026) = 2.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 59 ÷ 2.8 = 21.4 months → Jul 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (41% − 15%) ÷ 9 months = 2.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/337/24-25 · dated 2025-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner · No. ALN(ASH)SR 02/2014-15 · dated 2014-10-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/337/24-25 · dated 12 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
The Clan RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/S. Global Edifice Infra
- Promoter type
- Partnership Firm
- Projects on this site
- 3
- RERA complaints against promoter
- 2
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/S. Global Edifice Infra’s RERA recordM/S. Global Edifice Infra delivery record
- 3Projects in Bengaluru on RERA3 approved registrations under M/S. Global Edifice Infra in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 405Homes registeredAs stated in each registrations.
- 2RERA complaints0 open, 2 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 4.9Complaints per 1,000 homes2 complaints ÷ 405 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 41% built, 38 of 258 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 30% built, 18 of 258 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 24% built, 12 of 258 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Feb 2026Quarterly update filed for Q3 2025-26: 15% built, 7 of 258 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Oct 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/091025/008153); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2025Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/CC/337/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
The Clan FAQs
What is The Clan project?
The Clan is a residential project by M/S. Global Edifice Infra located in Sarjapura, Anekal, PIN code 562125.
How many homes does The Clan have?
The Clan has 258 homes across 1 tower with 9 floors.
What home types are available in The Clan?
The Clan offers 2 BHK (58 homes, 727-887 carpet sq ft), 3 BHK (190 homes, 804-1,110 carpet sq ft), and 2.5 BHK (10 homes, 925-954 carpet sq ft).
When will The Clan be completed?
The Clan is scheduled for completion by 31 December 2028 according to the RERA record.
What is the construction progress of The Clan?
As of Q2 2026-27 (period ended 30 September 2026), The Clan was 41% complete with 38 homes booked out of 258.
What is the RERA registration number for The Clan?
The Clan is registered on Karnataka RERA as PRM/KA/RERA/1251/308/PR/091025/008153.
Are there any RERA complaints against The Clan?
There are no RERA complaints on record against The Clan project.
Who is the builder of The Clan?
The Clan is built by M/S. Global Edifice Infra, a Partnership Firm.
What is the builder's track record?
M/S. Global Edifice Infra has 4 projects in the Bengaluru RERA records with 2 complaints filed against the builder across all projects.
Which bank holds the escrow for The Clan?
State Bank of India holds the escrow account for The Clan.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Clan
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/S. Global Edifice Infra? Review the builder.
Reviews of M/S. Global Edifice Infra by verified buyers
No verified reviews of M/S. Global Edifice Infra yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Spring WoodsBuildiko Ventures LLP | 0.4 km | 103 | Oct 2027 | 64% | 0 | Not collected |
| fourwalls avenueFourwalls Avenue | 0.6 km | 203 | Dec 2026extended | 100% | 0 | Not collected |
| T G AuraTG Prime Realty Private Limited | 0.7 km | 61 | Dec 2031 | 9% | 0 | Not collected |
| Divine MeadowsMAX GLOBAL Developers | 1.1 km | 216 | Dec 2031 | — | 0 | Not collected |
| Mythri SereneMythri Developers | 1.3 km | 32 | Dec 2028 | — | 0 | Not collected |
| S S SerenityS.S. Developers | 1.5 km | 112 | Oct 2027 | 70% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/091025/008153.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Sarjapur
Sarjapura, SarjapurUnder constructionRERA registeredBuyers’ group openSpring Woods
by Buildiko Ventures
Price: Price on requestGet brochure & price →
- 3.5 BHK, 4 BHK
- 1,870 – 2,451 sq ft
- Oct 2027
103 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Spring Woods
Mahalchowdadenahalli, SarjapurUnder constructionRERA registeredBuyers’ group openDivine Meadows
by MAX GLOBAL
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK, 4.5 BHK, 5 BHK, +1 more
- 1,676 – 4,602 sq ft
- Dec 2031
2 phases on RERA · 216 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Divine Meadows
Sarjapura, SarjapurUnder constructionRERA registeredBuyers’ group openMythri Serene
by Mythri
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 593 – 917 sq ft
- Dec 2028
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mythri Serene