The Loft
2 & 3 BHK apartments by Vrise Constructions LLP · Channasandra, Kadugodi–Hope Farm, Bengaluru
Channasandra, Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Loft at a glance
- Possession (RERA)Dec 2029Karnataka RERA
- Construction19% built · on pace for Apr 2030 3 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked35 of 144 (24%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroHopefarm Channasandra · 1.19 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 102 min at peak25.07 km straight line · estimate
- Nearest lakePattandur Agrahara Lake · 1,889 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Loft is a residential project by Vrise Constructions LLP in Channasandra, Bengaluru with 144 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
The Loft buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Vrise Constructions LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the The Loft buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 977 – 1,355 sq ft
- Towers
- 1
- Floors
- 25
- Total homes
- 144
- Land
- 2.15 acres
- Possession (RERA)
- Dec 2029
- Built (RERA update)
- 19%
The Loft RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/070126/008387
- Registered on
- 7 Jan 2026
- Promised completion
- 31 Dec 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 35 of 144 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| THE LOFT | 25 | 3 | 144 |
A dash (—) means the filing did not state that value.
Summary in plain English
The Loft is a residential project by Vrise Constructions LLP in Channasandra, Bengaluru East. The project has 144 homes across 1 tower and is registered for completion by 31 December 2029.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 88.9% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, Whitefield Branch
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0042/25-26 · dated 29 Oct 2025
- Project cost declared to RERA
- ₹195 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
The Loft location and address
- Address
- KATHA NO. 839, SY NO. 118/1 & 118/2, CHANNASANDRA VILLAGE, , BIDARAHALLI HOBLI, MAHADEVAPURA ZONE, WARD NO. 83 , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Channasandra
- Locality
- Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98282, 77.76384
Distances to landmarks
Not found in public records yet: landmarksAbout Kadugodi–Hope Farm
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 2.87 km | approx. 12 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.11 km | approx. 45 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.21 km | approx. 70 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 18.28 km | approx. 74 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.06 km | approx. 85 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 25.07 km | approx. 102 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 26Schools and colleges19 schools, 2 colleges, 5 kindergartens
- 7Hospitals and clinics4 hospitals, 3 clinics
Nearest schools and colleges
- M V Jayaram College of Engineering · 0.26 km
- Government Model Middle School · 0.5 km
- Government Polytechnic College · 0.65 km
Nearest hospitals and clinics
- Bhagwan Mahavir Jain Health Center · 1.25 km
- Whitefield Clinic of Nephro-Urology · 1.29 km
- New Life Hospital bangalore · 1.63 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station1.19 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station1.53 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Pattandur Agrahara Lake, 1,889 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Pattandur Agrahara Lake on OpenStreetMap (opens in a new tab) (ಪಟ್ಟಂದೂರು ಅಗ್ರಹಾರ ಕೆರೆ)1,889 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Loft home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan9 pages

Approved Building PlanFull PDF on RERA
Approved layout plan2 files

Location Demarcation.pdfFull PDF on RERA 
VILLAGE MAP DEMARCATION.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 977 sq ft | 1 |
| 3 BHK | 1,162 – 1,355 sq ft | 143 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
The Loft possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-09.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 1 | 0 | 1 |
| 3 BHK | 143 | 35 | 108 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Dec 2025Project start date given to RERA
- 7 Jan 2026Registered with Karnataka RERA
- 31 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2030 — about 3 months after the completion date on RERA (31 Dec 2029).
At the pace between the 3 quarterly filings we have (15% → 19% in 6 months), it would be around Nov 2036 — about 83 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 9 Oct 2026 | 19% | 35 of 144 |
| Q1 2026-27to 30 Jun 2026 | 13 Jul 2026 | 17% | 25 of 144 |
| Q4 2025-26to 31 Mar 2026 | 8 Apr 2026 | 15% | 13 of 144 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 19% ÷ 10 months (1 Dec 2025 to 30 Sep 2026) = 1.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 81 ÷ 1.9 = 42.4 months → Apr 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (19% − 15%) ÷ 6 months = 0.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-09.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0042/25-26 · dated 2025-10-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC Bengaluru · No. 35028 and 1 more · dated 2025-04-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0042/25-26 · dated 29 Oct 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
The Loft RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Vrise Constructions LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACG-4606
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Vrise Constructions LLP’s RERA recordVrise Constructions LLP delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Vrise Constructions LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 144Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 144 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2025
- 9 Oct 2026Quarterly update filed for Q2 2026-27: 19% built, 35 of 144 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Quarterly update filed for Q1 2026-27: 17% built, 25 of 144 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Apr 2026Quarterly update filed for Q4 2025-26: 15% built, 13 of 144 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/070126/008387); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Dec 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Oct 2025Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0042/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
The Loft FAQs
What is The Loft project?
The Loft is a residential project by Vrise Constructions LLP located in Channasandra, Bengaluru East (PIN 560067).
How many homes are in The Loft?
The project has 144 homes.
What home types are available in The Loft?
The project offers 3 BHK homes (143 units) with carpet area between 1,162 and 1,355 sq ft, and 2 BHK homes (1 unit) with 977 sq ft carpet area.
When will The Loft be completed?
According to the RERA record, the project completion date is 31 December 2029.
What is the construction progress of The Loft?
As of Q2 2026-27 (quarter ended 30 September 2026), construction is 19% complete with 35 homes booked out of 144.
What is The Loft's RERA registration number?
The project is registered as PRM/KA/RERA/1251/446/PR/070126/008387.
Are there any RERA complaints against The Loft?
There are no RERA complaints on this project registration.
What is the builder's complaint history?
Vrise Constructions LLP has no RERA complaints against it across all projects.
Which bank is the escrow agent for The Loft?
Kotak Mahindra Bank is the escrow bank for this project.
How many floors does The Loft have?
The project has 1 tower with a maximum of 25 floors.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Loft
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Vrise Constructions LLP? Review the builder.
Reviews of Vrise Constructions LLP by verified buyers
No verified reviews of Vrise Constructions LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Ark Oak TreeArk Infra Developers Private Limited | 0.2 km | 176 | Feb 2028 | 100% | 0 | Not collected |
| Prestige Elm ParkPrestige Estates Projects Ltd | 0.5 km | 192 | Aug 2026 | 90% | 0 | Not collected |
| DSR EvoqDSR Green Homes | 0.6 km | 448 | Dec 2029 | 13% | 0 | Not collected |
| Cloud ForestShreno Limited | 0.8 km | 798 | Oct 2029 | 38% | 0 | Not collected |
| Vintage ValleyReviva Projects | 0.9 km | 48 | Jan 2030 | 95% | 0 | Not collected |
| Lorven Cascade GardenLorven Ventures | 1 km | 312 | Dec 2028 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/070126/008387.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kadugodi–Hope Farm
Channasandra, Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openArk Oak Tree
by Ark Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 738 – 1,218 sq ft
- Feb 2028
176 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ark Oak Tree
Channasandra, WhitefieldUnder constructionRERA registeredBuyers’ group openPrestige Elm Park
by Prestige Estates
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,120 – 1,606 sq ft
- Aug 2026
RERA not updated since promised Aug 2026 · 192 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Elm Park
Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openDSR Evoq
by DSR Green Homes
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 729 – 1,535 sq ft
- Dec 2029
448 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DSR Evoq