Under The Mango Tree
30×40, 30×45 +1 more plots by Tranquil Timberlands Private Limited · Taralu, near Kanakapura Road, Bengaluru
Taralu, near Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Tranquil Timberlands Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Under The Mango Tree at a glance
- Completion (RERA)Jul 2028Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroSilk Institute · 7.98 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 200 min at peak49.43 km straight line · estimate
- Nearest lakeUnnamed lake · 577 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Under The Mango Tree is a plotted development by Tranquil Timberlands Private Limited in Taralu, Bengaluru with 43 plots, registered with Karnataka RERA. The completion date on RERA is 30 Jul 2028.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Under The Mango Tree buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Tranquil Timberlands Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Under The Mango Tree buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×45, 30×50
- Plot area
- 879 – 2,135 sq ft
- Total plots
- 43
- Layout approved by
- Kanakapura Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 1
- Completion (RERA)
- Jul 2028
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 1 |
| 30×45 | 1,350 sq ft | 2 |
| 30×50 | 1,500 sq ft | 6 |
| Odd-sized (irregular) | varies | 34 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 16/3 | Residential | No. ALNSUSRK 25/14-15, 28 Apr 2016 | Deputy Commisioner Bangalore |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Under The Mango Tree RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/170625/007839
- Registered on
- 17 Jun 2025
- Promised completion
- 30 Jul 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Under The Mango Tree is a plotted layout in Taralu, Bengaluru South, developed by Tranquil Timberlands Private Limited. The project has 43 plots and is registered with RERA. According to the latest update, the layout development is complete, with a RERA completion date of 30 July 2028.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- BANK OF INDIA, V V Puram Branch, Bangalore
- Building plan (RERA)
- Kanakapura Planning Authority · No. LAO/219/2023-24/161 · dated 15 Apr 2025
- Project cost declared to RERA
- ₹8.94 Cr
Amenities
Under The Mango Tree location and address
- Address
- Survey No 16/3 of Taralu Village , Uttarahalli Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560082
- Village (RERA)
- Taralu
- Locality
- Near Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560082
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.78994, 77.53008
Distances to landmarks
Not found in public records yet: landmarksAbout Taralu
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 16.06 km | approx. 65 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.36 km | approx. 87 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.13 km | approx. 90 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 30.31 km | approx. 123 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 31.47 km | approx. 127 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 49.43 km | approx. 200 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges2 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest hospitals and clinics
- Cadambam's Psychiatric Hospital · 0.8 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station7.98 km
- Hejjala (ಹೆಜ್ಜಾಲ)Nearest railway station13.75 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 577 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 577 m
- Tharalu Estate Lake on OpenStreetMap (opens in a new tab) 646 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 651 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Under The Mango Tree layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14*12.19 m | — | 1 |
| 9.14*14 m | — | 2 |
| 9.14*15.24 m | — | 6 |
| Odd-shaped plots | — | 34 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Under The Mango Tree completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 17 Jun 2025Registered with Karnataka RERA
- 1 Jul 2025Project start date given to RERA
- 30 Jul 2028Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Kanakapura Planning Authority · No. LAO/219/2023-24/161 · dated 2025-04-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commisioner Bangalore · No. ALNSUSRK 25/14-15 · dated 2016-04-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Kanakapura Planning Authority · No. LAO/219/2023-24/161 · dated 15 Apr 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Under The Mango Tree RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Tranquil Timberlands Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U02005KA2009PTC048927
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Tranquil Timberlands Private Limited’s RERA recordTranquil Timberlands Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Tranquil Timberlands Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 43Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 43 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 90% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 52% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 0% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jun 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/170625/007839); completion date 30 Jul 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2025Building plan approved by Kanakapura Planning Authority (No. LAO/219/2023-24/161) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Under The Mango Tree FAQs
What plot sizes are available in Under The Mango Tree?
The project has plots in three standard sizes: 30×50 ft (1,500 sq ft, 6 plots), 30×45 ft (1,350 sq ft, 2 plots), and 30×40 ft (1,200 sq ft, 1 plot). There are also 34 odd-sized plots; their exact sizes are not in the RERA record.
How many plots are there in Under The Mango Tree?
There are 43 plots in total in the project.
Who approved the layout for Under The Mango Tree?
The layout was approved by the Kanakapura Planning Authority.
How many land conversion orders are on record for Under The Mango Tree?
There is 1 land conversion order on record for the project.
What is the RERA registration number for Under The Mango Tree?
The RERA registration number is PRM/KA/RERA/1251/310/PR/170625/007839, registered on 17 June 2025.
When will Under The Mango Tree be completed?
The RERA completion date is 30 July 2028.
What is the construction progress of Under The Mango Tree?
According to the latest quarterly update for Q2 2026-27 (ended 30 September 2026), the layout development is 100% complete.
Are there any RERA complaints against Under The Mango Tree or its developer?
There are no RERA complaints on this project or against Tranquil Timberlands Private Limited.
Where is Under The Mango Tree located?
The project is in Taralu, Bengaluru South taluk, Bengaluru Urban district, PIN code 560082.
Is this the developer's only project on RERA record in Bengaluru?
Tranquil Timberlands Private Limited has 1 project in our Bengaluru RERA records, which is this project.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Under The Mango Tree
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Tranquil Timberlands Private Limited? Review the developer.
Reviews of Tranquil Timberlands Private Limited by verified buyers
No verified reviews of Tranquil Timberlands Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Kingstone ValleySLV Housing Development Corporation | 1.2 km | 96 | Sep 2026 | 100% | 0 | Not collected |
| Commune By Are Phase 1R G Anil | 1.2 km | 24 | Jan 2029 | 96% | 0 | Not collected |
| SLV GardensM/S. S L V Gardens | 1.2 km | 29 | Dec 2027 | 100% | 0 | Not collected |
| Concorde Opus IIConcorde I Values Homes India LLP | 1.4 km | 186 | Mar 2027 | — | 0 | Not collected |
| Commune By Are Pahse 2R G Anil | 1.6 km | 4 | Jan 2029 | 96% | 0 | Not collected |
| Shravanthi AtmosphereShravanthi Shelthers | 1.8 km | 129 | Mar 2028 | 12% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/170625/007839.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Taralu, near Kanakapura RoadUnder constructionRERA registeredBuyers’ group openCommune By Are Phase 1
by R G Anil
Price: Price on requestGet brochure & price →
- Odd-sized plots
- 796 – 2,611 sq ft plots
- Approved by Kanakapura Planning Authority
- Jan 2029
24 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Commune By Are Phase 1- Taralu, near Kanakapura Road© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
SLV Gardens
by M/S. S L V Gardens
Price: Price on requestGet brochure & price →
- 30×50, 30×65
- 1,118 – 3,138 sq ft plots
- Approved by Kanakapura Planning Authority
- Dec 2027
29 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SLV Gardens
Taralu, near Kanakapura RoadUnder constructionRERA registeredBuyers’ group openCommune By Are Pahse 2
by R G Anil
Price: Price on requestGet brochure & price →
- Odd-sized plots
- 1,393 – 7,814 sq ft plots
- Approved by Kanakapura Planning Authority
- Jan 2029
4 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Commune By Are Pahse 2