VR Sapphire
2 & 3 BHK apartments by VR Builders And Developers · Kannurahalli, Hoskote, Bengaluru
Kannurahalli, Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
VR Sapphire at a glance
- Possession (RERA)Dec 2026Karnataka RERA
- Construction78% built · on pace for Jun 2027 5 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked26 of 46 (57%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 9.12 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 73 min at peak18.05 km straight line · estimate
- Nearest lakeUnnamed lake · 1,080 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
VR Sapphire is a residential project by VR Builders And Developers in Kannurahalli, Bengaluru with 46 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
VR Sapphire buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks VR Builders And Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the VR Sapphire buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 1,075 – 7,158 sq ft
- Towers
- 2
- Floors
- 5
- Total homes
- 46
- Land
- 0.77 acres
- Possession (RERA)
- Dec 2026
- Built (RERA update)
- 78%
VR Sapphire RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/270924/007086
- Registered on
- 27 Sep 2024
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 26 of 46 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A Block | 5 | 1 | 45 |
| B Block | 2 | 0 | 1 |
A dash (—) means the filing did not state that value.
Summary in plain English
VR Sapphire is a residential project by VR Builders And Developers in Kannurahalli, Hosakote, with 46 homes across 2 towers of up to 5 floors. The project is registered on RERA with a completion date of 31 December 2026.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 62.8% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Canara Bank, HOSKOTE
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. HSK-LBPAS-10643/23-24/BP · dated 6 Mar 2024
- Project cost declared to RERA
- ₹10.77 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
VR Sapphire location and address
- Address
- Sy No 106/1B2,106/6, Kannurahalli Village , Kasaba Hobli,Hoskote Town , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Kannurahalli
- Locality
- HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.06720, 77.79917
Distances to landmarks
Not found in public records yet: landmarksAbout Hoskote
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 11.07 km | approx. 45 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 18.05 km | approx. 73 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.54 km | approx. 79 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 20.44 km | approx. 83 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 26.77 km | approx. 108 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 28.22 km | approx. 114 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges5 schools, 2 colleges, 0 kindergartens
- 7Hospitals and clinics5 hospitals, 2 clinics
Nearest schools and colleges
- M V Jayaram Medical College · 1.47 km
- Kyati Degree College · 1.6 km
- Government Girls High School · 1.62 km
Nearest hospitals and clinics
- Hoskote Government Hospital · 1.11 km
- Kempanna Nursing Home · 1.5 km
- Dhruva Nursing Home And Diagnostic Centre · 1.5 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station9.12 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station8.87 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,080 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,080 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,113 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
VR Sapphire floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure5 pages

BrochureFull PDF on RERA 



Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 duplex | 2,045 sq ft | 1 |
| 2 BHK | 1,075 – 1,210 sq ft | 35 |
| 3 BHK | 1,450 – 7,158 sq ft | 10 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
VR Sapphire possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 35 | 20 | 15 |
| 3 BHK | 11 | 6 | 5 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 18 Apr 2024Project start date given to RERA
- 27 Sep 2024Registered with Karnataka RERA
- 31 Dec 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2027 — about 5 months after the completion date on RERA (31 Dec 2026).
At the pace between the 4 quarterly filings we have (45% → 78% in 9 months), it would be around Mar 2027 — about 3 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 78% | 26 of 46 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 60% | 24 of 46 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 46% | 19 of 46 |
| Q3 2025-26to 31 Dec 2025 | 30 Jan 2026 | 45% | 13 of 46 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 78% ÷ 29.4 months (18 Apr 2024 to 30 Sep 2026) = 2.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 22 ÷ 2.7 = 8.3 months → Jun 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (78% − 45%) ÷ 9 months = 3.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
11 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. HSK-LBPAS-10643/23-24/BP · dated 2024-03-06 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | District Commissioner,Bangalore Rural · No. MLN SR -31-1991-92 and 1 more · dated 2023-03-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. HSK-LBPAS-10643/23-24/BP · dated 6 Mar 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
VR Sapphire RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About VR Builders And Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 4
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
VR Builders And Developers’s RERA recordVR Builders And Developers delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under VR Builders And Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 632Homes and plots registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.6Complaints per 1,000 homes and plots1 complaints ÷ 632 homes and plots in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 78% built, 26 of 46 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 60% built, 24 of 46 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 46% built, 19 of 46 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2026Quarterly update filed for Q3 2025-26: 45% built, 13 of 46 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Sep 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/270924/007086); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Mar 2024Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. HSK-LBPAS-10643/23-24/BP) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
VR Sapphire FAQs
What is the completion date for VR Sapphire?
The completion date on RERA is 31 December 2026.
How many homes are in VR Sapphire?
VR Sapphire has 46 homes across 2 towers.
What types of homes are available in VR Sapphire?
The project has 1 duplex (carpet area 2,045 sq ft), 10 three-bedroom homes (carpet area 1,450 to 7,158 sq ft), and 35 two-bedroom homes (carpet area 1,075 to 1,210 sq ft).
What is the construction progress of VR Sapphire?
As of Q2 2026-27 (ended 30 September 2026), construction is 78% complete with 26 homes booked out of 46.
What is the RERA registration number for VR Sapphire?
The RERA registration number is PRM/KA/RERA/1250/304/PR/270924/007086, registered on 27 September 2024.
Where is VR Sapphire located?
VR Sapphire is in Kannurahalli, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
Are there any RERA complaints on VR Sapphire?
There are no RERA complaints on this project.
Who is the builder of VR Sapphire?
VR Sapphire is built by VR Builders And Developers, a partnership firm with 7 projects in the Bengaluru RERA records.
How many RERA complaints are against VR Builders And Developers?
There is 1 RERA complaint against VR Builders And Developers across all their projects.
What is the escrow bank for VR Sapphire?
The escrow bank for VR Sapphire is Canara Bank.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about VR Sapphire
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from VR Builders And Developers? Review the builder.
Reviews of VR Builders And Developers by verified buyers
No verified reviews of VR Builders And Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Riqueza SiriRiqueza Estates Private Limited | 0.3 km | 128 | Nov 2027 | 94% | 0 | Not collected |
| Aakriti EmeraldAakriti Projects | 0.5 km | 130 | Aug 2028 | 51% | 0 | Not collected |
| Adarsh ParadiseA1 Builders | 1.1 km | 238 | Dec 2026 | 87% | 0 | Not collected |
| Sanjeevini AarnaSanjeevini Projects | 1.5 km | 224 | Sep 2027 | 66% | 0 | Not collected |
| Urban GreensVarun Infra | 1.5 km | 118 | Dec 2030 | — | 0 | Not collected |
| JP JasmineJPHC Private Limited | 1.6 km | 66 | Dec 2028 | 35% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/270924/007086.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hoskote
Kannuralli, HoskoteUnder constructionRERA registeredBuyers’ group openRiqueza Siri
by Riqueza Estates
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 594 – 871 sq ft
- Nov 2027
128 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Riqueza Siri
Varadapura, HoskoteUnder constructionRERA registeredBuyers’ group openAakriti Emerald
by Aakriti
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 641 – 1,137 sq ft
- Aug 2028
130 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aakriti Emerald
Dandupalya, HoskoteUnder constructionRERA registeredBuyers’ group openAdarsh Paradise
by A1 Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 654 – 931 sq ft
- Dec 2026
238 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Paradise