Abhee Siliconshine

1, 2, 3 & 4 BHK apartments by Abhee Ventures Private Limited · Mullur, Kodathi–Carmelaram, Bengaluru

Mullur, Kodathi–Carmelaram, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Aug 2026; no extension or completion filed
  • residential

by Abhee Ventures Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Abhee Siliconshine

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Abhee Siliconshine is a residential project by Abhee Ventures Private Limited in Mullur, Bengaluru with 250 homes, registered with Karnataka RERA. The completion date on RERA is 31 Aug 2026.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Abhee Siliconshine buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Abhee Ventures Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Abhee Siliconshine buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
Carpet area
452 – 1,507 sq ft
Towers
4
Floors
5
Total homes
250
Land
4.03 acres
Possession (extended)
Aug 2026
Built (RERA update)
98%

Abhee Siliconshine RERA number and registration details

RERA number
TOR/PRM/KA/RERA/1251/446/PR/230914/004587
Registered on
14 Sep 2023
Promised completion
31 Aug 2025
Extended to
31 Aug 2026
RERA status
New launch
Homes booked
256 of 250 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
BUILDING 140212
BUILDING 251100
BUILDING 35145
BUILDING 451105

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Abhee Siliconshine is a residential project by Abhee Ventures Private Limited in Mullur, Bengaluru East, with 250 homes across 4 towers. The project is scheduled for completion on 31 August 2026.

Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
50.1% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, 27TH MAIN SECTOR 1 HSR LAYOUT
Project cost declared to RERA
₹142 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Abhee Siliconshine location and address

Address
SY NO 34/2B1, 34/5, 34/6, 34/7 MULLUR VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK, BANGALORE
Village (RERA)
Mullur
Locality
Kodathi–CarmelaramAlso known as Kodathi, Carmelaram
PIN code
560066
City
Bengaluru
State
Karnataka
Coordinates
12.90236, 77.71880

Distances to landmarks

Not found in public records yet: landmarks

About Kodathi–Carmelaram

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)4.71 kmapprox. 19 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)8.27 kmapprox. 33 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)9.7 kmapprox. 39 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)18.24 kmapprox. 74 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)19.43 kmapprox. 79 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)33.21 kmapprox. 135 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 14Schools and colleges10 schools, 3 colleges, 1 kindergartens
  • 5Hospitals and clinics3 hospitals, 2 clinics

Nearest schools and colleges

  • New Baldwin International School · 0.45 km
  • St Patrick's Academy · 0.46 km
  • St. Jerome's College · 0.6 km

Nearest hospitals and clinics

  • Camillian Pastoral Health Centre · 0.23 km
  • Snehadaan Hospital · 0.34 km
  • Kodathi Primary Health Centre · 1.3 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.74 km
  • Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction5.04 km
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction5.27 km
  • Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station7.87 km
  • Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station1.51 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Chikkabelanduru Kere, 447 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Abhee Siliconshine home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Abhee Siliconshine

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK452 – 484 sq ft50
2 BHK753 – 850 sq ft20
2.5 BHK936 – 1,001 sq ft70
3 BHK990 – 1,130 sq ft100
4 BHK1,432 – 1,507 sq ft10

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Abhee Siliconshine possession date and construction status

  • Whole project (promoter’s RERA update)98%

    as on · 256 of 250 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

By tower (Q2 2026-27)

  • BUILDING 1100%
  • BUILDING 296%
  • BUILDING 398%
  • BUILDING 498%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
2.5 BHK1347559
2 BHK1205268
3 BHK14811533
1 BHK50446
4 BHK10100

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 26 Aug 2021Project start date given to RERA
  2. 14 Sep 2023Registered with Karnataka RERA
  3. 31 Aug 2025Completion date given at registration
  4. 31 Aug 2026Section 6 Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Nov 2026 — about 2 months after the completion date on RERA (31 Aug 2026).

At the pace between the 4 quarterly filings we have (61% → 98% in 9 months), it would be around Oct 2026 — about 1 month after the RERA date.

0%25%50%75%100%202220232024202520262027RERA date61%64%95%98%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202698%256 of 462
Q1 2026-27to 30 Jun 202615 Jul 202695%255 of 462
Q4 2025-26to 31 Mar 202615 Apr 202664%254 of 462
Q3 2025-26to 31 Dec 202515 Jan 202661%244 of 462
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 98% ÷ 61.1 months (26 Aug 2021 to 30 Sep 2026) = 1.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 2 ÷ 1.6 = 1.2 months → Nov 2026. This is an estimate, not a date from the builder or RERA.

Pace between filings = (98% − 61%) ÷ 9 months = 4.1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBDA - Bangalore Development AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 22 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Abhee Siliconshine RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Abhee Ventures Private Limited

Promoter type
Company
Projects on this site
6
RERA complaints against promoter
1
Company number (CIN)
U45203KA2021PTC153091

From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Abhee Ventures Private Limited’s RERA record

Abhee Ventures Private Limited delivery record

As on 22 Oct 2026
  • 6Projects in Bengaluru on RERA7 approved registrations under Abhee Ventures Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 3,504Homes and plots registeredAs stated in each registrations.
  • 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0.3Complaints per 1,000 homes and plots1 complaints ÷ 3,504 homes and plots in its 7 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 1.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Refund of booking or other money1

1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Abhee PrideOC on RERA30 Jun 20266 Aug 20261 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Aug 2021

As on 22 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 98% built, 256 of 462 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 31 Aug 2026Completion date extended to 31 Aug 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Jul 2026Quarterly update filed for Q1 2026-27: 95% built, 255 of 462 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Apr 2026Quarterly update filed for Q4 2025-26: 64% built, 254 of 462 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Jan 2026Quarterly update filed for Q3 2025-26: 61% built, 244 of 462 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 14 Sep 2023Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/446/PR/230914/004587); completion date 31 Aug 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 26 Aug 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Abhee Siliconshine FAQs

When will Abhee Siliconshine be completed?

The project completion date on RERA is 31 August 2026. This date was extended under Section 6 Extension from the original date of 31 August 2025.

How many homes are in Abhee Siliconshine?

The project has 250 homes across 4 towers, with a maximum of 5 floors per tower.

What home types are available in Abhee Siliconshine?

The project offers 1 BHK (452 to 484 sq ft carpet area), 2 BHK (753 to 850 sq ft), 2.5 BHK (936 to 1,001 sq ft), 3 BHK (990 to 1,130 sq ft), and 4 BHK (1,432 to 1,507 sq ft) homes.

How many of each home type are in Abhee Siliconshine?

The project has 50 units of 1 BHK, 20 units of 2 BHK, 70 units of 2.5 BHK, 100 units of 3 BHK, and 10 units of 4 BHK.

What is the location of Abhee Siliconshine?

The project is located in Mullur, Bengaluru East taluk, Bengaluru Urban district, PIN code 560066.

How many complaints are registered against Abhee Siliconshine on RERA?

There are no RERA complaints on this project.

What is the construction progress of Abhee Siliconshine?

As of Q2 2026-27 (ended 30 September 2026), the project is 98% complete with 256 homes booked.

How many projects does Abhee Ventures Private Limited have on RERA record in Bengaluru?

Abhee Ventures Private Limited has 9 projects in the RERA records for Bengaluru.

Are there any complaints against Abhee Ventures Private Limited?

There is 1 RERA complaint registered against the builder across all their projects.

Which bank holds the escrow for Abhee Siliconshine?

HDFC is the escrow bank for this project.

Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Abhee Siliconshine

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Abhee Ventures Private Limited? Review the builder.

Reviews of Abhee Ventures Private Limited by verified buyers

No verified reviews of Abhee Ventures Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Arvind SylvaArvind SmartSpaces Limited0.5 km374Aug 20310%0from ₹2.2 Cr
Avana FlorestaAvana Constructions1 km30Jan 202852%0Not collected
Bandu Eco CrestSnark Developers1.1 km110Dec 203015%0Not collected
Mana Jardin NeoMana Constructions LLP1.1 km78Dec 203250%0Not collected
Orion HeightsSri Balaji Ventures1.1 km115Dec 202558%0Not collected
Land Capital PrimeroLandcapital Estates Pvt Ltd1.5 km65Sep 2021extended—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/446/PR/230914/004587.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error