Adarsh Park Heights
1, 2 & 3 BHK apartments by Akarsha Realty Private Limited · Gunjur, Bengaluru
Gunjur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Akarsha Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Adarsh Park Heights at a glance
- Possession (RERA)May 2027 ExtendedWas May 2027 · Karnataka RERA
- Construction74% built · on pace for Nov 2027 5 mo after RERA dateRERA filing to 30 Sep 2026 (Phase-2); estimate from average pace
- RERA complaints (project)9 complaintsKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroKodibisanahalli · 4.12 km (under construction)Open now: Nallurahalli, 5.28 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 123 min at peak30.29 km straight line · estimate
- Nearest lakeUnnamed lake · 1,202 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Adarsh Park Heights is a residential project by Akarsha Realty Private Limited in Gunjur, Bengaluru with 2,068 homes, registered with Karnataka RERA. The completion date on RERA is 31 May 2027. It is registered in 2 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Adarsh Park Heights buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Akarsha Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Adarsh Park Heights buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 260 – 1,289 sq ft
- Towers
- 8
- Floors
- 29
- Total homes
- 2,068
- Land
- 20.24 acres
- Possession (extended)
- May 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Adarsh Park Heights RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/210525/004163
- Registered on
- 25 May 2021
- Promised completion
- 31 May 2027
- Extended to
- 31 May 2027
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1251/446/PR/210525/004163 | 31 May 2025Extended to 31 May 2027 | 1,574 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-2 | PRM/KA/RERA/1251/446/PR/200923/006275 | 31 May 2027 | 494 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower 1 | Phase 1 | 29 | 2 | 328 |
| Tower 2 | Phase 1 | 29 | 2 | 459 |
| BLOCK G | Phase-2 | 23 | 2 | 84 |
| BLOCK H | Phase-2 | 23 | 2 | 86 |
| BLOCK J | Phase-2 | 23 | 2 | 74 |
| BLOCK K | Phase-2 | 23 | 2 | 74 |
| BLOCK L | Phase-2 | 23 | 2 | 96 |
| BLOCK M | Phase-2 | 19 | 2 | 80 |
A dash (—) means the filing did not state that value.
Summary in plain English
Adarsh Park Heights is a residential project by Akarsha Realty Private Limited in Gunjur, Bengaluru East, with 2,068 homes across 2 phases. Phase 1 has 1,574 homes in 2 towers (up to 29 floors) and Phase 2 has 494 homes in 6 towers (up to 23 floors), with completion expected by 31 May 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- RATNAKAR BANK, Residency Road, Bangalore
- Escrow bank (RERA) · Phase-2
- RATNAKAR BANK, Residency Road, Bangalore
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Adarsh Park Heights location and address
- Address
- KATHA NO 1778 , GUNJUR VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK, WARD NO.149,, MAHADEVAPURA ZONE, BANGALORE
- Village (RERA)
- Gunjur
- Locality
- Gunjur
- PIN code
- 560025
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.92972, 77.73265
Distances to landmarks
Not found in public records yet: landmarksAbout Gunjur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 5.61 km | approx. 23 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 6.46 km | approx. 26 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 11.53 km | approx. 47 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.96 km | approx. 73 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 18.48 km | approx. 75 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.29 km | approx. 123 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 16Schools and colleges12 schools, 1 colleges, 3 kindergartens
- 16Hospitals and clinics5 hospitals, 11 clinics
Nearest schools and colleges
- The Cambridge International School · 0.78 km
- Gunjuru Government School · 0.85 km
- Bachpan · 0.87 km
Nearest hospitals and clinics
- Pranathi Clinic · 0.71 km
- Miracle Hospital · 0.79 km
- Government Hospital, Gunjur · 0.9 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.12 km
- Marathahalli (ಮಾರತಹಳ್ಳಿ)Blue Line metro, under construction4.62 km
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.9 km
- Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station5.28 km
- Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station2.93 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,202 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,202 m
- Varthur Lake on OpenStreetMap (opens in a new tab) (ವರ್ತೂರು ಕೆರೆ)1,273 m
- Gunjuru Lake on OpenStreetMap (opens in a new tab) (ಗುಂಜೂರು ಕೆರೆ)1,362 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Adarsh Park Heights floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans13 files

Phase-2: scan 10 T3 FLOOR PLANS 4 of 4Filed 31 Jul 2023 · Full PDF on RERA 
Phase-2: scan 10 T3 FLOOR PLANS 4 of 4Filed 6 Sep 2023 · Full PDF on RERA 
Phase-2: scan 10 T3 FLOOR PLANS 4 of 4Filed 28 Aug 2023 · Full PDF on RERA 
Phase 1: scan 4 T1 FLOOR PLANSFiled 2 Apr 2021 · Full PDF on RERA 
Phase-2: scan 7 T3 FLOOR PLANS 1 of 4Filed 6 Sep 2023 · Full PDF on RERA 
Phase-2: scan 7 T3 FLOOR PLANS 1 of 4Filed 31 Jul 2023 · Full PDF on RERA 
Phase-2: scan 7 T3 FLOOR PLANS 1 of 4Filed 28 Aug 2023 · Full PDF on RERA 
Phase-2: scan 8 T3 FLOOR PLANS 2 of 4Filed 28 Aug 2023 · Full PDF on RERA 
Phase-2: scan 8 T3 FLOOR PLANS 2 of 4Filed 6 Sep 2023 · Full PDF on RERA 
Phase-2: scan 8 T3 FLOOR PLANS 2 of 4Filed 31 Jul 2023 · Full PDF on RERA 
Phase-2: scan 9 T3 FLOOR PLANS 3 of 4Filed 6 Sep 2023 · Full PDF on RERA 
Phase-2: scan 9 T3 FLOOR PLANS 3 of 4Filed 28 Aug 2023 · Full PDF on RERA 
Phase-2: scan 9 T3 FLOOR PLANS 3 of 4Filed 31 Jul 2023 · Full PDF on RERA
Elevations3 files

Phase-2: scan 12 ELEVATIONFiled 31 Jul 2023 · Full PDF on RERA 
Phase-2: scan 12 ELEVATIONFiled 6 Sep 2023 · Full PDF on RERA 
Phase-2: scan 12 ELEVATIONFiled 28 Aug 2023 · Full PDF on RERA
Approved building plan2 files

Phase-2: 8 - Building PlanFiled 31 Jul 2023 · Full PDF on RERA 
Phase 1: GUNJUR PHASEWISE SANCTION PLANFiled 2 Apr 2021 · Full PDF on RERA
Approved layout plan3 files

Phase-2: Approved Layout PlanFull PDF on RERA 
Phase-2: Existing Layout PlanFull PDF on RERA 
Phase-2: Phase wise demarcation -park heights -2Filed 31 Jul 2023 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 260 – 317 sq ft | 130 |
| 1 br | 301 sq ft | 130 |
| 2 BHK | 909 – 975 sq ft | 437 |
| 2 br | 936 sq ft | 432 |
| 3 BHK | 956 – 1,289 sq ft | 714 |
| 3 br | 1,270 sq ft | 225 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Adarsh Park Heights possession date and construction status
Timeline
- 21 May 2021Phase 1: Project start date given to RERA
- 25 May 2021Phase 1: Registered with Karnataka RERA
- 1 Aug 2023Phase-2: Project start date given to RERA
- 20 Sep 2023Phase-2: Registered with Karnataka RERA
- 31 May 2025Phase 1: Completion date given at registration
- 31 May 2026Phase 1: Section 6 Extension: completion date moved to this date
- 31 May 2027Phase 1: Further Extension: completion date moved to this date
- 31 May 2027Phase-2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase-2)
At the average pace so far, construction would reach 100% around Nov 2027 — about 5 months after the completion date on RERA (31 May 2027).
At the pace between the 4 quarterly filings we have (33% → 74% in 9 months), it would be around Mar 2027 — about 2 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase-2, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 74% | 471 of 494 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 65% | 458 of 494 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 42% | 460 of 494 |
| Q3 2025-26to 31 Dec 2025 | 31 Jan 2026 | 33% | 419 of 494 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 74% ÷ 38 months (1 Aug 2023 to 30 Sep 2026) = 1.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 26 ÷ 1.9 = 13.3 months → Nov 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (74% − 33%) ÷ 9 months = 4.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
17 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase-2) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0055/19-20 · dated 2020-09-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (14 orders) (Phase-2) | Deputy Commissioner · No. ALN:(E.V.H)SR:/169/14-15 and 13 more · dated 2017-08-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase-2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0055/19-20 · dated 23 Sep 2020
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Adarsh Park Heights RERA complaints and orders
9 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01171/2026 | 1 Oct 2026 | Compensation for the delay in OC and handover | Scrutiny completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01041/2026 | 24 Aug 2026 | Compensation for Misleading information on Open Stormwater drain and Sewage canal, reduced ground and amentities size,building higher floors than approved | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01004/2026 | 14 Aug 2026 | Illegal Construction of floors without approval . I am the buyer of flat H-602 in Adarsh Park Heights | Under enquiry ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00985/2026 | 10 Aug 2026 | Complaint seeking delay interest under Section 18(1) of RERA for delayed possession & Deviation of Project | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00919/2026 | 29 Jul 2026 | Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA - ADARSH PARK HEIGHTS PHASE 1 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00835/2026 | 20 Jul 2026 | Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA - ADARSH PARK HEIGHTS PHASE 1 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01342/2025 | 6 Nov 2025 | Litigation on land not disclosed at the time of booking | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00759/2024 | 20 Aug 2024 | Refund of booking amount for flat L-1002 on cancellation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00219/2023 | 21 Feb 2023 | refund of cancelled flat B2003 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Akarsha Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 9
- Company number (CIN)
- U70102KA2007PTC043642
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Akarsha Realty Private Limited’s RERA recordAkarsha Realty Private Limited delivery record
- 2Projects in Bengaluru on RERA3 approved registrations under Akarsha Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 2,712Homes registeredAs stated in each registrations.
- 9RERA complaints6 open, 3 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 3.3Complaints per 1,000 homes9 complaints ÷ 2,712 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
9 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2020
- 31 May 2027Phase 1: Completion date extended to 31 May 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase-2: Quarterly update filed for Q2 2026-27: 74% built, 471 of 494 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2026Complaint 01171/2026 filed with RERA: “Compensation for the delay in OC and handover” — now scrutiny completed Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Aug 2026Complaint 01041/2026 filed with RERA: “Compensation for Misleading information on Open Stormwater drain and Sewage canal, reduced ground and amentities size,building higher floors than approved” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Aug 2026Complaint 01004/2026 filed with RERA: “Illegal Construction of floors without approval . I am the buyer of flat H-602 in Adarsh Park Heights” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Aug 2026Complaint 00985/2026 filed with RERA: “Complaint seeking delay interest under Section 18(1) of RERA for delayed possession & Deviation of Project” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2026Complaint 00919/2026 filed with RERA: “Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA - ADARSH PARK HEIGHTS PHASE 1” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jul 2026Complaint 00835/2026 filed with RERA: “Delay in Possession and Non-payment of Statutory Compensation under Section 18(1) of RERA - ADARSH PARK HEIGHTS PHASE 1” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 81% built, 773 of 787 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase-2: Quarterly update filed for Q1 2026-27: 65% built, 458 of 494 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 81% built, 773 of 787 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase-2: Quarterly update filed for Q4 2025-26: 42% built, 460 of 494 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Phase-2: Quarterly update filed for Q3 2025-26: 33% built, 419 of 494 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 81% built, 769 of 787 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Nov 2025Complaint 01342/2025 filed with RERA: “Litigation on land not disclosed at the time of booking” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Aug 2024Complaint 00759/2024 filed with RERA: “Refund of booking amount for flat L-1002 on cancellation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Sep 2023Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200923/006275); completion date 31 May 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Aug 2023Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Feb 2023Complaint 00219/2023 filed with RERA: “refund of cancelled flat B2003” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 May 2021Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/210525/004163); completion date 31 May 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2021Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Sep 2020Phase-2: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0055/19-20) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Adarsh Park Heights FAQs
When will Adarsh Park Heights be completed?
Phase 1 is expected to be completed by 31 May 2027 (extended twice from the original date of 31 May 2025). Phase 2 is also expected by 31 May 2027.
What is the RERA registration number for Adarsh Park Heights?
Phase 1 is registered as PRM/KA/RERA/1251/446/PR/210525/004163 and Phase 2 as PRM/KA/RERA/1251/446/PR/200923/006275.
How many homes are available in Adarsh Park Heights?
The project has 2,068 homes total: 1,574 homes in Phase 1 and 494 homes in Phase 2.
What home types are available in Adarsh Park Heights?
Phase 1 offers 1 BR (301 sq ft), 1 BHK (260–317 sq ft), 2 BR (936 sq ft), 2 BHK (909–975 sq ft), and 3 BR/3 BHK (956–1,289 sq ft). Phase 2 offers 2 BHK (956–975 sq ft) and 3 BHK (1,235–1,289 sq ft).
What is the construction progress in Adarsh Park Heights?
As of Q1 2026–27, Phase 1 is 81% complete with 773 homes booked out of 787 in the booking table. As of Q2 2026–27, Phase 2 is 74% complete with 471 homes booked out of 494 in the booking table.
How many RERA complaints are there on Adarsh Park Heights?
There are 9 complaints on this project: 6 on Phase 1 and 3 on Phase 2.
Where is Adarsh Park Heights located?
The project is located in Gunjur, Bengaluru East taluk, PIN code 560001.
How many towers does Adarsh Park Heights have?
Phase 1 has 2 towers with up to 29 floors, and Phase 2 has 6 towers with up to 23 floors.
How many RERA complaints are there against the builder Akarsha Realty Private Limited?
There are 9 complaints against the builder across all projects on record.
How many other projects does Akarsha Realty Private Limited have in the RERA records?
The builder has 2 projects in the Karnataka RERA Bengaluru records.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Adarsh Park Heights
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Akarsha Realty Private Limited? Review the builder.
Reviews of Akarsha Realty Private Limited by verified buyers
No verified reviews of Akarsha Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Myhna VistaraMyhna Properties Private Limited | 0.5 km | 1,127 | Dec 2030 | 4% | 0 | Not collected |
| Prestige Serenity ShoresPrestige Habitat Ventures | 0.5 km | 657 | Aug 2027 | 84% | 0 | Not collected |
| Vertex WellingtonVertex Infras | 0.7 km | 32 | Dec 2025 | — | 0 | Not collected |
| Spirit Of OneSkandaavani Shelters Pvt Ltd | 0.7 km | 104 | Dec 2029 | — | 1 | Not collected |
| Candeur Novo GardeniaNovolife Innovative Structures LLP | 0.7 km | 332 | Dec 2027 | 80% | 0 | Not collected |
| Orchid LifeGoyal Hariyana Associates | 0.7 km | 772 | Feb 2030 | 84% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/210525/004163, PRM/KA/RERA/1251/446/PR/200923/006275.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Gunjur
GunjurUnder constructionRERA registeredBuyers’ group openMyhna Vistara
by Myhna Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 724 – 18,634 sq ft
- Dec 2030
1,127 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Myhna Vistara
Gunjur, VarthurUnder constructionRERA registeredBuyers’ group openPrestige Serenity Shores
by Prestige Habitat Ventures
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 412 – 1,773 sq ft
- Aug 2027
657 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Serenity Shores
GunjurReady to moveRERA registeredBuyers’ group openVertex Wellington
by Vertex Infras
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 603 – 1,238 sq ft
- Dec 2025
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vertex Wellington