Aikam Golf Estates
30×39, 30×40 +3 more plots by BCD Emprasa Limited Liability Partnership · Kambalipura, near Hoskote, Bengaluru
Kambalipura, near Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by BCD Emprasa Limited Liability Partnership
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Aikam Golf Estates at a glance
- Completion (RERA)Oct 2028Karnataka RERA
- RERA complaints (project)3 complaintsKarnataka RERA · as on 16 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroKIAL Terminals · 13.56 km (under construction)Open now: Whitefield (Kadugodi), 14.55 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 59 min at peak14.45 km straight line · estimate
- Nearest lakeUnnamed lake · 1,706 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Aikam Golf Estates is a plotted development by BCD Emprasa Limited Liability Partnership in Kambalipura, Bengaluru with 212 plots, registered with Karnataka RERA. The completion date on RERA is 15 Oct 2028. It is registered in 2 phases.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Aikam Golf Estates buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks BCD Emprasa Limited Liability Partnership for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Aikam Golf Estates buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×39, 30×40, 30×48, 30×50 +1 more
- Plot area
- 1,143 – 13,647 sq ft
- Total plots
- 212
- Layout approved by
- Hoskote Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 3
- Completion (RERA)
- Oct 2028
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×39 | 1,170 sq ft | 4 |
| 30×40 | 1,200 sq ft | 82 |
| 30×48 | 1,440 sq ft | 7 |
| 30×50 | 1,500 sq ft | 37 |
| 30×52 | 1,560 sq ft | 9 |
| Odd-sized (irregular) | varies | 72 |
| Commercial | — | 1 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase I | 151/1 | Residential | No. LND10006570, 20 Sep 2018 | Deputy Commissioner |
| Phase II | 144 | Residential | No. 571123, 16 Feb 2022 | DC Office, Bangalore Rural |
| Phase II | 145 | Residential | No. LND10018128, 16 Jun 2022 | DC Office, Bangalore Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Aikam Golf Estates RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/220425/007684
- Registered on
- 22 Apr 2025
- Promised completion
- 15 Oct 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Phase I | PRM/KA/RERA/1250/304/PR/220425/007684 | 31 Dec 2026 | 62 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase II | PRM/KA/RERA/1250/304/PR/110926/008934 | 15 Oct 2028 | 150 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Aikam Golf Estates is a plotted layout by BCD Emprasa Limited Liability Partnership in Kambalipura, Hosakote, with 212 plots across 2 phases. Phase I (62 plots) is due for completion on 31 December 2026, and Phase II (150 plots) on 15 October 2028.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell, Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase I
- ICICI Bank, Wilson Garden
- Escrow bank (RERA) · Phase II
- ICICI Bank, WILSON GARDEN
Amenities
Aikam Golf Estates location and address
- Address
- No.151/1, of Kambalipura Village, Sulibele Hobli, Hoskote Taluk, Bangalore Rural District - 562114 , No.151/1, of Kambalipura Village, Sulibele Hobli, Hoskote Taluk, Bangalore Rural District - 562114 , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Kambalipura
- Locality
- Near HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.11759, 77.80693
Distances to landmarks
Not found in public records yet: landmarksAbout Kambalipura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 14.45 km | approx. 59 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 16.28 km | approx. 66 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.68 km | approx. 88 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 25.5 km | approx. 103 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.03 km | approx. 122 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 33.53 km | approx. 136 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges0 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Rajiv Gandhi Institute of Petroleum Technology, Bangalore · 0.93 km
- Centre For Research & Education in Science & Technology, Indian Institute of Astrophysics · 0.94 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction13.56 km
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station14.55 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station14.35 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,706 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,706 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,980 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,997 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Aikam Golf Estates layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

Phase I: BrochureFull PDF on RERA 
Phase II: BrochureFull PDF on RERA
Approved layout plan3 files

Phase I: Approved Layout Plan/Demarcation PlanFull PDF on RERA 
Phase II: Approved Layout Plan/Demarcation PlanFull PDF on RERA 
Phase I: Approved Layout PlanFiled 3 Apr 2025 · Full PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9 m × 12 m | — | 36 |
| Plot 9 m × 11.80 m | — | 4 |
| Plot 9 m × 12 m | — | 46 |
| Plot 9 m × 14.51 m | — | 7 |
| Plot 9 m × 15.95 m | — | 9 |
| Plot 9 m × 15 m | — | 37 |
| Commercial | — | 1 |
| Odd-shaped plots | — | 72 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Aikam Golf Estates completion date and development status
Timeline
- 5 Apr 2025Phase I: Project start date given to RERA
- 22 Apr 2025Phase I: Registered with Karnataka RERA
- 1 Sep 2026Phase II: Project start date given to RERA
- 11 Sep 2026Phase II: Registered with Karnataka RERA
- 31 Dec 2026Phase I: Completion date given at registration
- 15 Oct 2028Phase II: Completion date given at registration
Approvals and documents checklist
11 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Phase I) | Hoskote Planning Authority · No. HPA/LAO/59/2023-24/3049 · dated 2025-02-21 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase I) | Deputy Commissioner · No. LND10006570 · dated 2018-09-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase II) | Hoskote Planning Authority · No. HPA/LAO/05/2025-26 · dated 2026-07-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) (Phase II) | DC Office, Bangalore Rural · No. 571123 and 1 more · dated 2022-06-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (If Applicable) (Phase II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase II)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Hoskote Planning Authority · No. HPA/LAO/05/2025-26 · dated 27 Jul 2026
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Aikam Golf Estates RERA complaints and orders
3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00067/2026 | 30 Jan 2026 | Misrepresentation regarding private STRR access and failure to refund booking amount despite cancellation | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01507/2025 | 22 Dec 2025 | Non-refund of booking amount after cancellation due to material discrepancies in project assurances – Plot No. 39, AIKAM Golf Estates Phase I | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01371/2025 | 11 Nov 2025 | Non transparency and misrepresentation of cost structure by BCD City Aikam Phase 1 Request for correct cost clarification fair allotment of Plot No 21 compensation for harassment and Fair Allotment | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About BCD Emprasa Limited Liability Partnership
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 3
- Company number (CIN)
- AAT-1938
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
BCD Emprasa Limited Liability Partnership’s RERA recordBCD Emprasa Limited Liability Partnership delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under BCD Emprasa Limited Liability Partnership in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 212Plots registeredAs stated in each registrations.
- 3RERA complaints3 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 14.2Complaints per 1,000 plots3 complaints ÷ 212 plots in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2025
- 15 Oct 2026Phase II: Quarterly update filed for Q2 2026-27: 1% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Sep 2026Phase II: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/110926/008934); completion date 15 Oct 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2026Phase II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jul 2026Phase II: Building plan approved by Hoskote Planning Authority (No. HPA/LAO/05/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2026Complaint 00067/2026 filed with RERA: “Misrepresentation regarding private STRR access and failure to refund booking amount despite cancellation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Dec 2025Complaint 01507/2025 filed with RERA: “Non-refund of booking amount after cancellation due to material discrepancies in project assurances – Plot No. 39, AIKAM Golf Estates Phase I” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Nov 2025Complaint 01371/2025 filed with RERA: “Non transparency and misrepresentation of cost structure by BCD City Aikam Phase 1 Request for correct cost clarification fair allotment of Plot No 21 compensation for harassment and Fair Allotment” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Apr 2025Phase I: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/220425/007684); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Apr 2025Phase I: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Feb 2025Phase I: Building plan approved by Hoskote Planning Authority (No. HPA/LAO/59/2023-24/3049) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Aikam Golf Estates FAQs
What plot sizes are available in Aikam Golf Estates?
Phase I has 30×40 plots (1,200 sq ft). Phase II offers multiple sizes: 30×40 (1,200 sq ft), 30×50 (1,500 sq ft), 30×52 (1,560 sq ft), 30×48 (1,440 sq ft), and 30×39 (1,170 sq ft). Both phases also have odd-sized plots.
How many plots are in each phase of Aikam Golf Estates?
Phase I has 62 plots, and Phase II has 150 plots, for a total of 212 plots.
What are the RERA registration numbers for Aikam Golf Estates?
Phase I is registered as PRM/KA/RERA/1250/304/PR/220425/007684, and Phase II as PRM/KA/RERA/1250/304/PR/110926/008934.
When is Aikam Golf Estates expected to be completed?
Phase I is expected to be completed on 31 December 2026, and Phase II on 15 October 2028.
Who approved the layout for Aikam Golf Estates?
The layout was approved by Hoskote Planning Authority.
How many land conversion orders are on record for Aikam Golf Estates?
Phase I has 1 land conversion order, and Phase II has 2 land conversion orders.
What is the development progress of Aikam Golf Estates Phase II?
As of Q2 2026-27 (quarter ended 30 September 2026), Phase II is 1% developed.
How many RERA complaints have been filed against Aikam Golf Estates?
There are 3 RERA complaints on the project: all 3 are on Phase I, and none on Phase II.
Where is Aikam Golf Estates located?
The project is in Kambalipura, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
What is the developer's track record on RERA?
BCD Emprasa Limited Liability Partnership has 3 RERA complaints against it across all projects, with 1 project recorded in our Bengaluru register.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Aikam Golf Estates
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from BCD Emprasa Limited Liability Partnership? Review the developer.
Reviews of BCD Emprasa Limited Liability Partnership by verified buyers
No verified reviews of BCD Emprasa Limited Liability Partnership yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Agm BuildersAgm Builders | 2.4 km | 28 | Dec 2029 | 100% | 0 | Not collected |
| Elements Of Nature Happy HiveUrban Fields Realty LLP | 2.9 km | 301 | Oct 2028 | — | 0 | Not collected |
| Palm County Phase-IIArk Global Estates | 3.4 km | 369 | Sep 2028 | — | 0 | Not collected |
| M1 Terra Alegria Phase 2M1 Housing LLP | 3.9 km | 224 | Jun 2026 | 100% | 0 | Not collected |
| AlcorNagarjuna Structural Corporation Private Limited | 4.8 km | 71 | Dec 2029 | 70% | 0 | Not collected |
| Carpe DiemVijayasri Vijetha Infra Projects | 4.9 km | 125 | Dec 2027 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/304/PR/220425/007684, PRM/KA/RERA/1250/304/PR/110926/008934.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Chokkahalli, near Hoskote© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Agm Builders
by Agm Builders
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 963 – 1,835 sq ft plots
- Approved by Hoskote Planning Authority
- Dec 2029
28 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Agm Builders
Lakkondanahalli, near HoskoteUnder constructionRERA registeredBuyers’ group openElements Of Nature Happy Hive
by Urban Fields Realty
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60
- 907 – 8,464 sq ft plots
- Approved by Local Planning Authority
- Oct 2028
2 phases on RERA · 301 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Elements Of Nature Happy Hive
Doddahullur, near HoskoteUnder constructionRERA registeredBuyers’ group openPalm County Phase-II
by Ark Global Estates
Price: Price on requestGet brochure & price →
- 20×40, 20×45, 25×40 +3 more
- 610 – 5,951 sq ft plots
- Approved by Hoskote Planning Authority
- Sep 2028
369 plots
Be one of the first 10 buyers in this groupFounding members — it’s free