Ambience Downtown

3, 4 & 5 BHK apartments by Parakite Builders Private Limited · near Frazer Town, Bengaluru

Near Frazer Town, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Parakite Builders Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Ambience Downtown

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Ambience Downtown is a residential project by Parakite Builders Private Limited in Bengaluru with 184 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 13 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Ambience Downtown buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Parakite Builders Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Ambience Downtown buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 13 Oct 2026
Home types
3 BHK, 4 BHK, 5 BHK
Carpet area
1,485 – 3,251 sq ft
Towers
1
Floors
13
Total homes
184
Land
2.13 acres
Possession (extended)
Dec 2026
Built (RERA update)
47%

Ambience Downtown RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/191107/002995
Registered on
7 Nov 2019
Promised completion
31 Mar 2023
Extended to
31 Dec 2026
RERA status
New launch
Homes booked
45 of 184 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
TOWER A13292

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Ambience Downtown is a residential project by Parakite Builders Private Limited in Bengaluru East with 184 homes in 1 tower. The project includes simplex, duplex, and 3 BHK to 5 BHK homes. The completion date on RERA is 31 December 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
76% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, Old Airport Road
Project cost declared to RERA
₹218 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Ambience Downtown location and address

Address
Survey No 59/2 of Lingarajapuram ,Village, Kasaba Hobli,, BBMP Ward No 28, Banaswadi Layout,
Village (RERA)
Not found in public records yet: village
Locality
Near Frazer TownAlso known as Pulikeshi Nagar
PIN code
560008
City
Bengaluru
State
Karnataka
Coordinates
13.00250, 77.63133

Distances to landmarks

Not found in public records yet: landmarks

About the locality

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)5.22 kmapprox. 21 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)7.22 kmapprox. 29 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)10.3 kmapprox. 42 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)11.65 kmapprox. 47 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)17.38 kmapprox. 70 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)23.42 kmapprox. 95 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 37Schools and colleges24 schools, 5 colleges, 8 kindergartens
  • 38Hospitals and clinics14 hospitals, 24 clinics

Nearest schools and colleges

  • Maria Niketana School · 0.49 km
  • Chrysalis Hub · 0.56 km
  • Peniel Community College for Women · 0.62 km

Nearest hospitals and clinics

  • Dr Zamindar's Micro Surgical Eye Centre · 0.17 km
  • Kamath Nursing Home · 0.44 km
  • Prestige Medical Healthcare PMHS · 0.86 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Tannery Road (ತನ್ನೆರಿ ರೋಡ್)Pink Line metro, under construction2.04 km
  • Venkateshapura (ವೆಂಕಟೇಶಪುರ)Pink Line metro, under construction2.19 km
  • Swami Vivekananda Road (ಸ್ವಾಮಿ ವಿವೇಕಾನಂದ ರಸ್ತೆ)Open now — nearest operating metro station2.36 km
  • Banaswadi (ಬಾಣಸವಾಡಿ)Nearest railway station0.51 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Kacharakanahalli Lake, 1,523 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Ambience Downtown home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan10 pages

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Ambience Downtown

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
3 BHK1,485 – 1,701 sq ft64
4 BHK1,873 – 2,971 sq ft26
5 BHK3,208 – 3,251 sq ft2
Simplex- 88 & duplex -4 total 92 units1,712 sq ft92

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ambience Downtown possession date and construction status

  • Whole project (promoter’s RERA update)47%

    as on · 45 of 184 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
3 BHK642836
4 BHK261610
5 BHK211

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 19 Oct 2019Project start date given to RERA
  2. 7 Nov 2019Registered with Karnataka RERA
  3. 31 Mar 2023Completion date given at registration
  4. 31 Dec 2023Covid Extension: completion date moved to this date
  5. 30 Dec 2024Section 6 Extension: completion date moved to this date
  6. 31 Dec 2026Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Jul 2026

At the average pace so far, construction would reach 100% around Jan 2034 — about 85 months after the completion date on RERA (31 Dec 2026).

0%25%50%75%100%20202022202420262028203020322034RERA date47%47%47%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q1 2026-27to 30 Jun 202615 Jul 202647%45 of 92
Q4 2025-26to 31 Mar 202615 Apr 202647%45 of 92
Q3 2025-26to 31 Dec 202520 Feb 202647%45 of 92
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 47% ÷ 80.4 months (19 Oct 2019 to 30 Jun 2026) = 0.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 53 ÷ 0.6 = 90.6 months → Jan 2034. This is an estimate, not a date from the builder or RERA.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 13 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 13 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ambience Downtown RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Parakite Builders Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
U45309KA2016PTC098163

From Karnataka RERA, as collected so far (13 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Parakite Builders Private Limited’s RERA record

Parakite Builders Private Limited delivery record

As on 13 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Oct 2019

As on 13 Oct 2026
  1. 31 Dec 2026Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 47% built, 45 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 47% built, 45 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 Feb 2026Quarterly update filed for Q3 2025-26: 47% built, 45 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 7 Nov 2019Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/191107/002995); completion date 31 Mar 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 19 Oct 2019Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Ambience Downtown FAQs

What is the completion date for Ambience Downtown?

The RERA completion date is 31 December 2026. The project has had three extensions: a Covid extension to 31 December 2023, a Section 6 extension to 30 December 2024, and a further extension to 31 December 2026.

What is the RERA registration number for Ambience Downtown?

The registration number is PRM/KA/RERA/1251/446/PR/191107/002995, registered on 7 November 2019.

How many homes are in Ambience Downtown?

There are 184 homes total: 92 simplex and duplex units, 26 4 BHK homes, 64 3 BHK homes, and 2 5 BHK homes.

What are the carpet areas for homes in Ambience Downtown?

Simplex and duplex homes are 1,712 sq ft. 3 BHK homes are 1,485 to 1,701 sq ft. 4 BHK homes are 1,873 to 2,971 sq ft. 5 BHK homes are 3,208 to 3,251 sq ft.

Where is Ambience Downtown located?

The project is in Bengaluru East taluk, Bengaluru Urban district, PIN code 560008.

How many storeys does Ambience Downtown have?

The project has 1 tower with a maximum of 13 floors.

What is the construction progress for Ambience Downtown?

As of 30 June 2026, construction is 47% complete. 45 homes have been booked, with 92 homes in the booking table.

Are there any RERA complaints on Ambience Downtown?

There are no RERA complaints on this project and no complaints against the builder on record.

What is the land area for Ambience Downtown?

The land area is 8,627 sq m.

How many projects does Parakite Builders Private Limited have in the RERA record?

Ambience Downtown is the only project by this builder in our Bengaluru RERA records.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Ambience Downtown

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Parakite Builders Private Limited? Review the builder.

Reviews of Parakite Builders Private Limited by verified buyers

No verified reviews of Parakite Builders Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
DS Max SwastikaAsha Satish3 km68Mar 202789%0Not collected
Nithya Infra SunshineNithya Infra Sunshine3.2 km40Dec 202787%0Not collected
Magnolia DelightMagnolia Infrastructure Development Limited3.9 km48Mar 202850%0Not collected
Pavani HeightsAnjani Constructions4.1 km111Jun 2027extended50%0Not collected
Nava GokulamNavajyothi Constructions4.2 km180Dec 2025—0Not collected
S K DwarakaS K Builders And Developers Inc4.5 km156Jun 2026extended96%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 13 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/191107/002995.

  • RERA record last checked: 13 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error