Ankuraa Meridian
1, 2 & 3 BHK apartments by Ankuraa Developers · Belatur, near Kadugodi–Hope Farm, Bengaluru
Belatur, near Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Ankuraa Meridian at a glance
- Possession (RERA)Jun 2027Karnataka RERA
- Construction93% built · on pace for Dec 2026RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked287 of 300 (96%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 1.8 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 88 min at peak21.76 km straight line · estimate
- Nearest lakeUnnamed lake · 710 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Ankuraa Meridian is a residential project by Ankuraa Developers in Belatur, Bengaluru with 300 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2027.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Ankuraa Meridian buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Ankuraa Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Ankuraa Meridian buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 513 – 1,124 sq ft
- Towers
- 4
- Floors
- 14
- Total homes
- 300
- Land
- 3.96 acres
- Possession (RERA)
- Jun 2027
- Built (RERA update)
- 93%
Ankuraa Meridian RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/151223/006488
- Registered on
- 15 Dec 2023
- Promised completion
- 30 Jun 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 287 of 300 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Aster | 14 | 1 | 84 |
| Basil | 14 | 1 | 84 |
| Clover | 14 | 1 | 84 |
| Daisy | 14 | 1 | 86 |
A dash (—) means the filing did not state that value.
Summary in plain English
Ankuraa Meridian is a residential project by Ankuraa Developers in Belatur, Bengaluru East, with 300 homes across 4 towers. The project has a RERA completion date of 30 June 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 73.7% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Bangalore IT Park
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23 · dated 30 Sep 2023
- Project cost declared to RERA
- ₹284 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Smart Home Automation
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning And incerntion
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Ankuraa Meridian location and address
- Address
- SY.NO:85,86 OF BELATUR VILLAGE & SY.NO:78 OF KUMBENA AGRAHARA VILLAGE , BIDARAHALLI HOBLI, WARD NO-54 , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Belatur
- Locality
- Near Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.01028, 77.75071
Distances to landmarks
Not found in public records yet: landmarksAbout Belatur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 2.88 km | approx. 12 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 12.22 km | approx. 49 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.79 km | approx. 60 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 19.95 km | approx. 81 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 20.13 km | approx. 82 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 21.76 km | approx. 88 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 13Schools and colleges11 schools, 2 colleges, 0 kindergartens
- 6Hospitals and clinics5 hospitals, 1 clinics
Nearest schools and colleges
- National Public School Whitefield · 0.9 km
- Valistus International School · 1.08 km
- Mount Litera Zee School · 1.21 km
Nearest hospitals and clinics
- Nationwide Kadugodi Clinic · 0.75 km
- Miracle Hospital · 0.91 km
- Telerad RXDX Kadugodi · 1.07 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station1.8 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station1.93 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 710 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 710 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,281 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Ankuraa Meridian floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure4 pages

BrochureFull PDF on RERA 


Approved building plan2 files

Approved Building/Plotting PlanFull PDF on RERA 
Approved plan.pdfFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
STP Demarcation.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 513 sq ft | 12 |
| 2 BHK | 807 – 833 sq ft | 72 |
| 2.5 BHK | 935 – 989 sq ft | 120 |
| 3 BHK | 1,123 – 1,124 sq ft | 96 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Ankuraa Meridian possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 84 | 65 | 19 |
| 2.5 BHK | 140 | 124 | 16 |
| 3 BHK | 114 | 98 | 16 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Oct 2023Project start date given to RERA
- 15 Dec 2023Registered with Karnataka RERA
- 30 Jun 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2026 — about 6 months before the completion date on RERA (30 Jun 2027).
At the pace between the 4 quarterly filings we have (48% → 93% in 9 months), it would be around Nov 2026 — about 8 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 93% | 287 of 338 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 82% | 271 of 338 |
| Q4 2025-26to 31 Mar 2026 | 6 Jul 2026 | 65% | 271 of 338 |
| Q3 2025-26to 31 Dec 2025 | 31 Mar 2026 | 48% | 249 of 338 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 93% ÷ 36 months (1 Oct 2023 to 30 Sep 2026) = 2.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 7 ÷ 2.6 = 2.7 months → Dec 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (93% − 48%) ÷ 9 months = 5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
16 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23 · dated 2023-09-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | DC Bengaluru · No. ALN(PU)(B)SR131/2008-09 and 2 more · dated 2009-06-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23 · dated 30 Sep 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Ankuraa Meridian RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Ankuraa Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Ankuraa Developers’s RERA recordAnkuraa Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Ankuraa Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 300Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 3.3Complaints per 1,000 homes1 complaints ÷ 300 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2023
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 93% built, 287 of 338 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 82% built, 271 of 338 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jul 2026Quarterly update filed for Q4 2025-26: 65% built, 271 of 338 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Quarterly update filed for Q3 2025-26: 48% built, 249 of 338 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Dec 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/151223/006488); completion date 30 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2023Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Ankuraa Meridian FAQs
When will Ankuraa Meridian be completed?
The RERA completion date is 30 June 2027.
How many homes are in Ankuraa Meridian?
The project has 300 homes.
What types of homes does Ankuraa Meridian offer?
The project offers 1 BHK (513 sq ft), 2 BHK (807-833 sq ft), 2.5 BHK (935-989 sq ft), and 3 BHK (1123-1124 sq ft) homes.
What is the RERA registration number for Ankuraa Meridian?
The RERA registration number is PRM/KA/RERA/1251/446/PR/151223/006488, registered on 15 December 2023.
How many towers does Ankuraa Meridian have?
The project has 4 towers with a maximum of 14 floors.
What is the construction progress of Ankuraa Meridian?
As of the latest quarterly update (Q2 2026-27 ending 30 September 2026), the project is 93% complete.
How many homes have been booked in Ankuraa Meridian?
As of Q2 2026-27, 287 homes have been booked out of 300.
Where is Ankuraa Meridian located?
The project is located in Belatur, Bengaluru East, with PIN code 560067.
Are there any RERA complaints against Ankuraa Meridian?
There are no RERA complaints on this project registration.
What is Ankuraa Developers' RERA record?
Ankuraa Developers has 1 RERA complaint across all projects and 2 projects in the Bengaluru RERA records.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Ankuraa Meridian
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Ankuraa Developers? Review the builder.
Reviews of Ankuraa Developers by verified buyers
No verified reviews of Ankuraa Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Saranya SwarovskiSaranya Builders | 0 km | 129 | Dec 2027 | 34% | 0 | Not collected |
| Godrej SplendourGodrej Properties Limited | 0.5 km | 2,052 | Jan 2028 | — | 5 | from ₹1.1 Crabout ₹21,300/sq ft carpet |
| Sampoojitha HeightsSampoojitha Developers | 0.7 km | 100 | Dec 2029 | 30% | 0 | Not collected |
| Sekhar OakwoodsSekhar Builders And Infratech Private Limited | 0.9 km | 96 | Mar 2027 | 92% | 0 | Not collected |
| SSVD SerenitySri Sai Venkateshwara Developers | 1 km | 56 | Jun 2029 | 12% | 0 | Not collected |
| Sai Green WoodsUnited Infrastructures | 1.1 km | 236 | Dec 2026 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/151223/006488.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Kumbena Agrahara, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSaranya Swarovski
by Saranya Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 792 – 1,249 sq ft
- Dec 2027
129 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Saranya Swarovski
DommasandraArtist’s impressionUnder constructionRERA registeredBuyers’ group openGodrej Splendour
by Godrej Properties
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 231 – 985 sq ft
- Jan 2028
2 phases on RERA · 2,052 homes · 5 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Godrej Splendour
Belathur, Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSampoojitha Heights
by Sampoojitha
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 750 – 1,127 sq ft
- Dec 2029
100 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sampoojitha Heights