by Ars Infraa

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Ars Zurich

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Ars Zurich is a residential project by Ars Infraa in Sompura, Bengaluru with 360 homes, registered with Karnataka RERA. The completion date on RERA is 30 Apr 2027. It is registered in 2 phases.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Ars Zurich buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Ars Infraa for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Ars Zurich buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
865 – 1,535 sq ft
Towers
3
Floors
26
Total homes
360
Land
5.96 acres
Possession (RERA)
Apr 2027
Built (RERA update)
Not found in public records yet: construction progress

Ars Zurich RERA number and registration details

RERA number
PRM/KA/RERA/1251/308/PR/230125/007431
Registered on
23 Jan 2025
Promised completion
30 Apr 2027
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase-1PRM/KA/RERA/1251/308/PR/230125/00743130 Apr 2027104New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase-2PRM/KA/RERA/1251/308/PR/050225/00748231 Dec 2026256New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
ARS SWASAPhase-1261104
RIVAPhase-280128
ZIVAPhase-280128

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Ars Zurich is a residential project by Ars Infraa in Sompura, Anekal, with 360 homes across 2 phases and 3 towers. Phase-1 with 104 homes is scheduled for completion on 30 April 2027, while Phase-2 with 256 homes is scheduled for completion on 31 December 2026.

Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase-1
ICICI Bank, SARJAPURA
Escrow bank (RERA) · Phase-2
ICICI Bank, SARJAPURA

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Club House

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ars Zurich location and address

Address
SY NO 105 SOMPURA VILLAGE SARJAPUR HOBLI ANEKAL TALUK BENGALURU , SY NO 105 SOMPURA VILLAGE SARJAPUR HOBLI ANEKAL TALUK BENGALURU , Anekal , Bengaluru Urban, Karnataka - 562125
Village (RERA)
Sompura
Locality
SarjapurAlso known as Sarjapura
PIN code
562125
City
Bengaluru
State
Karnataka
Coordinates
12.87136, 77.77210

Distances to landmarks

Not found in public records yet: landmarks

About Sarjapur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)11.44 kmapprox. 46 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)11.86 kmapprox. 48 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)13.45 kmapprox. 54 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)24.96 kmapprox. 101 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)25.66 kmapprox. 104 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)37.35 kmapprox. 151 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 7Schools and colleges5 schools, 2 colleges, 0 kindergartens
  • 4Hospitals and clinics3 hospitals, 1 clinics

Nearest schools and colleges

  • International School Of Management Excellence · 1.62 km
  • Sardhar Vallabhbai Patel Education Society · 1.66 km
  • Sri Ram Public School · 1.76 km

Nearest hospitals and clinics

  • Healing Hands Clinic - Sarjapura, Bengaluru · 0.7 km
  • Spandana · 0.73 km
  • Thyrocare · 1.34 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station10.76 km
  • Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station6.8 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Sompura Lake, 104 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Ars Zurich floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure2 files

Floor plans6 files

Elevations

Home typeCarpet areaHomes
2 BHK865 sq ft80
3 BHK1,165 – 1,535 sq ft280

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ars Zurich possession date and construction status

  • Phase-182%

    as on · 38 of 104 homes booked

  • Phase-273%

    as on · 149 of 256 homes booked

Timeline

  1. 17 Dec 2024Phase-1: Project start date given to RERA
  2. 17 Dec 2024Phase-2: Project start date given to RERA
  3. 23 Jan 2025Phase-1: Registered with Karnataka RERA
  4. 5 Feb 2025Phase-2: Registered with Karnataka RERA
  5. 31 Dec 2026Phase-2: Completion date given at registration
  6. 30 Apr 2027Phase-1: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase-1)

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Feb 2027 — about 2 months before the completion date on RERA (30 Apr 2027).

At the pace between the 4 quarterly filings we have (57% → 82% in 9 months), it would be around Apr 2027 — about 1 month before the RERA date.

This project has 2 RERA registrations; the chart uses Phase-1, the one with the most quarterly filings.

0%25%50%75%100%202520262027RERA date57%72%80%82%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202682%38 of 104
Q1 2026-27to 30 Jun 202615 Jul 202680%33 of 104
Q4 2025-26to 31 Mar 202615 Jul 202672%28 of 104
Q3 2025-26to 31 Dec 202515 Jul 202657%13 of 104
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 82% ÷ 21.4 months (17 Dec 2024 to 30 Sep 2026) = 3.8% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 18 ÷ 3.8 = 4.7 months → Feb 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (82% − 57%) ÷ 9 months = 2.8% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

18 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase-1)Local Planing Authority · No. APA/CC/552/2024-25 · dated 2024-12-12Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (4 orders) (Phase-1)DC OFFICE BANGALORE URBAN · No. ALN(ASH)SR 146/23-24 and 3 more · dated 2023-07-28Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase-1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase-2)Local Planing Authority · No. APA/CC/551/2024-25 · dated 2024-12-12Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (11 orders) (Phase-2)DC OFFICE BANGALORE URBAN · No. ALN(ASH)SR35/23-24 and 10 more · dated 2023-08-11Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase-2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase-1)

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. APA/CC/552/2024-25 · dated 12 Dec 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ars Zurich RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Ars Infraa

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Ars Infraa’s RERA record

Ars Infraa delivery record

As on 21 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Dec 2024

As on 20 Oct 2026
  1. 15 Oct 2026Phase-1: Quarterly update filed for Q2 2026-27: 82% built, 38 of 104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Oct 2026Phase-2: Quarterly update filed for Q2 2026-27: 73% built, 149 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 20 Jul 2026Phase-2: Quarterly update filed for Q4 2025-26: 42% built, 116 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 Jul 2026Phase-2: Quarterly update filed for Q1 2026-27: 47% built, 127 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 17 Jul 2026Phase-2: Quarterly update filed for Q3 2025-26: 32% built, 92 of 256 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Jul 2026Phase-1: Quarterly update filed for Q3 2025-26: 57% built, 13 of 104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Jul 2026Phase-1: Quarterly update filed for Q4 2025-26: 72% built, 28 of 104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 15 Jul 2026Phase-1: Quarterly update filed for Q1 2026-27: 80% built, 33 of 104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 5 Feb 2025Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/050225/007482); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 23 Jan 2025Phase-1: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/230125/007431); completion date 30 Apr 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 17 Dec 2024Phase-1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 17 Dec 2024Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 12 Dec 2024Phase-1: Building plan approved by Local Planing Authority (No. APA/CC/552/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 12 Dec 2024Phase-2: Building plan approved by Local Planing Authority (No. APA/CC/551/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Ars Zurich FAQs

What is Ars Zurich and where is it located?

Ars Zurich is a residential project by Ars Infraa located in Sompura, Anekal taluk, Bengaluru Urban, with PIN code 562125.

How many homes are in Ars Zurich?

Ars Zurich has 360 homes total: 104 homes in Phase-1 and 256 homes in Phase-2.

What home types are available in Ars Zurich?

Phase-1 offers 104 units of 3 BHK with carpet area from 1,343 to 1,535 sq ft. Phase-2 offers 176 units of 3 BHK with carpet area from 1,165 to 1,532 sq ft, and 80 units of 2 BHK with carpet area of 865 sq ft.

When will Phase-1 of Ars Zurich be completed?

Phase-1 is scheduled for completion on 30 April 2027.

When will Phase-2 of Ars Zurich be completed?

Phase-2 is scheduled for completion on 31 December 2026.

What is the construction progress of Ars Zurich as of the latest update?

As of Q2 2026-27 (ended 30 September 2026), Phase-1 is 82% complete and Phase-2 is 73% complete.

How many homes are booked in Ars Zurich?

As of Q2 2026-27 (ended 30 September 2026), 38 homes are booked in Phase-1 and 149 homes are booked in Phase-2.

Are there any RERA complaints against Ars Zurich?

There are no RERA complaints registered on this project.

What are the RERA registration numbers for Ars Zurich?

Phase-1 is registered as PRM/KA/RERA/1251/308/PR/230125/007431 and Phase-2 is registered as PRM/KA/RERA/1251/308/PR/050225/007482.

Are there any RERA complaints against the builder Ars Infraa?

There are no RERA complaints registered against Ars Infraa across all their projects.

Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Ars Zurich

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Ars Infraa? Review the builder.

Reviews of Ars Infraa by verified buyers

No verified reviews of Ars Infraa yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Bilva Phase-II By Bhavisha HomesBhavisha Properties0.3 km226Apr 202737%0Not collected
Sri Sai ViharSri Sai Ventures0.6 km88Nov 202895%0Not collected
Aston Park @ The Prestige CityPrestige Projects Private Limited0.7 km701Sep 202690%0Not collected
Eaton Park @ The Prestige CityPrestige Projects Private Limited0.7 km366Jun 20308%0Not collected
Fernvale @ The Prestige CityPrestige Projects Private Limited0.8 km387Mar 203020%0Not collected
Eden Park @ The Prestige CityPrestige Projects Private Limited0.8 km4,434Nov 2025extended100%2Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/230125/007431, PRM/KA/RERA/1251/308/PR/050225/007482.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Sarjapur