Skip to content
Log in

Aston Park @ The Prestige City

Apartments by Prestige Projects Private Limited · VK Halli, Sarjapur, Bengaluru

VK Halli, Sarjapur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Sep 2026; no extension or completion filed
  • residential

by Prestige Projects Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Aston Park @ The Prestige City

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Aston Park @ The Prestige City is a residential project by Prestige Projects Private Limited in VK Halli, Bengaluru with 701 homes, registered with Karnataka RERA. The completion date on RERA is 14 Sep 2026.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Aston Park @ The Prestige City buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Prestige Projects Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Aston Park @ The Prestige City buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
758 – 1,596 sq ft
Towers
5
Floors
27
Total homes
701
Land
4.35 acres
Possession (RERA)
Sep 2026
Built (RERA update)
90%

Aston Park @ The Prestige City RERA number and registration details

RERA number
PRM/KA/RERA/1251/308/PR/080323/005778
Registered on
8 Mar 2023
Promised completion
14 Sep 2026
Extended to
No extension recorded
RERA status
New launch
Homes booked
701 of 701 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Tower - 1272135
Tower - 2272133
Tower - 3262150
Tower - 4262128
Tower - 5262155

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Aston Park @ The Prestige City is a residential project by Prestige Projects Private Limited in VK Halli, Anekal, with 701 homes across 5 towers, each up to 27 floors. The project is registered with Karnataka RERA and is scheduled for completion on 14 September 2026.

Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
68.5% of land
Water and power
Water source filed with RERA: BoreWell,Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
ICICI Bank, M G ROAD
Building plan (RERA)
BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 29 Jan 2021
Project cost declared to RERA
₹530 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Aston Park @ The Prestige City location and address

Address
Proposed Residential Development at Sy. No. 31/2, 32/1, 32/2, 32/3 and 32/5 of VK Halli Village, , Sarjapur Hobli Anekul Taluk Bengaluru , Anekal , Bengaluru Urban, Karnataka - 562125
Village (RERA)
VK Halli
Locality
SarjapurAlso known as Sarjapura
PIN code
562125
City
Bengaluru
State
Karnataka
Coordinates
12.87771, 77.77193

Distances to landmarks

Not found in public records yet: landmarks

About Sarjapur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)11.08 kmapprox. 45 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)12.01 kmapprox. 49 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)12.77 kmapprox. 52 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)24.61 kmapprox. 100 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)25.11 kmapprox. 102 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)36.66 kmapprox. 148 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 4Schools and colleges2 schools, 2 colleges, 0 kindergartens
  • 4Hospitals and clinics2 hospitals, 2 clinics

Nearest schools and colleges

  • International School Of Management Excellence · 1.33 km

Nearest hospitals and clinics

  • Thyrocare · 1.02 km
  • Spandana · 1.31 km
  • Healing Hands Clinic - Sarjapura, Bengaluru · 1.31 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction10.97 km
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction10.97 km
  • Huskur Road (ಹುಸ್ಕೂರು ರಸ್ತೆ)Open now — nearest operating metro station11.11 km
  • Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station6.95 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Sarjapur Doddakere Lake, 338 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Aston Park @ The Prestige City floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure63 pages

Floor plans2 files

Approved layout plan

Home typeCarpet areaHomes
2 bed (odd)776 sq ft1
2 bed odd842 – 936 sq ft15
2 bed regular758 sq ft102
2bed (regular)758 sq ft102
3 bed compact904 sq ft26
3 bed large1,596 sq ft4
3 bed medium1,079 sq ft554
3 bed odd - duplex1,595 sq ft4
3bed (compact)904 sq ft26
3bed (medium)1,029 – 1,112 sq ft555

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Aston Park @ The Prestige City possession date and construction status

  • Whole project (promoter’s RERA update)90%

    as on · 701 of 701 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

By tower (Q2 2026-27)

  • Tower - 167%
  • Tower - 265%
  • Tower - 362%
  • Tower - 470%
  • Tower - 570%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
2 BED ODD13130
2BED (REGULAR)1021020
3 BED ODD - DUPLEX440
3BED (MEDIUM)5555550
2 BED (ODD)110
3BED (COMPACT)26260

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 8 Mar 2023Registered with Karnataka RERA
  2. 15 Mar 2023Project start date given to RERA
  3. 14 Sep 2026Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Feb 2027 — about 5 months after the completion date on RERA (14 Sep 2026).

At the pace between the 4 quarterly filings we have (77% → 90% in 9 months), it would be around Apr 2027 — about 7 months after the RERA date.

0%25%50%75%100%2024202520262027RERA date77%79%83%90%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202690%701 of 701
Q1 2026-27to 30 Jun 202615 Jul 202683%701 of 701
Q4 2025-26to 31 Mar 202615 Apr 202679%701 of 701
Q3 2025-26to 31 Dec 202515 Jan 202677%701 of 701
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 90% ÷ 42.5 months (15 Mar 2023 to 30 Sep 2026) = 2.1% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 10 ÷ 2.1 = 4.7 months → Feb 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (90% − 77%) ÷ 9 months = 1.4% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 2021-01-29Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (5 orders)Deputy Commissioner · No. ALN (A)(S)CR:44/2019-20 and 4 more · dated 2020-01-23Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 22 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 29 Jan 2021
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Aston Park @ The Prestige City RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Prestige Projects Private Limited

Promoter type
Company
Projects on this site
7
RERA complaints against promoter
17
Company number (CIN)
U45201KA2008PTC046784

From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Prestige Projects Private Limited’s RERA record

Prestige Projects Private Limited delivery record

As on 22 Oct 2026
  • 7Projects in Bengaluru on RERA9 approved registrations under Prestige Projects Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 13,158Homes registeredAs stated in each registrations.
  • 17RERA complaints12 open, 5 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1.3Complaints per 1,000 homes17 complaints ÷ 13,158 homes in its 9 registrations on Karnataka RERA in Bengaluru.
  • 4Completion filed on RERARegistrations where the promoter applied to RERA for completion; 4 with an occupancy certificate on RERA.
  • 0 of 4Filed by the date given at registrationMedian gap 6.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Delay in possession or delay interest14
  • Other3

17 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Meridian Park Phase III @ The Prestige CityOC on RERA28 Feb 2026extended to 27 Aug 202610 Sep 20266 months after
Meridian Park Phase II @ The Prestige CityOC on RERA14 Jan 2026extended to 13 Jul 202631 Jul 20267 months after
Meridian Park Phase I @ The Prestige CityOC on RERA14 Jul 2025extended to 14 Jan 202614 Jan 20266 months after
Eden Park @ The Prestige CityOC on RERA31 May 2025extended to 30 Nov 202528 Nov 20256 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jan 2021

As on 22 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 90% built, 701 of 701 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 83% built, 701 of 701 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 79% built, 701 of 701 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Jan 2026Quarterly update filed for Q3 2025-26: 77% built, 701 of 701 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Mar 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 8 Mar 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/080323/005778); completion date 14 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 29 Jan 2021Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. APA/LAO/44/2018-19) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Aston Park @ The Prestige City FAQs

What is the RERA registration number for Aston Park @ The Prestige City?

The project is registered with RERA as PRM/KA/RERA/1251/308/PR/080323/005778, registered on 8 March 2023.

What are the home types and carpet areas in Aston Park @ The Prestige City?

The project has 2-bed homes from 758 to 936 sq ft and 3-bed homes from 904 to 1,596 sq ft carpet area. There are also a small number of 3-bed duplexes.

How many homes are in Aston Park @ The Prestige City?

The project has 701 homes.

When will Aston Park @ The Prestige City be completed?

The project completion date on RERA is 14 September 2026.

What is the construction progress of Aston Park @ The Prestige City as of the latest update?

As of Q2 2026-27, the project is 90% complete.

How many homes have been booked in Aston Park @ The Prestige City?

As per the latest quarterly update for Q2 2026-27, 701 homes are in the booking table.

Are there any RERA complaints on Aston Park @ The Prestige City?

There are no complaints filed against this project on RERA.

Where is Aston Park @ The Prestige City located?

The project is in VK Halli, Anekal taluk, Bengaluru Urban district, PIN code 562125.

Who is the builder of Aston Park @ The Prestige City?

Prestige Projects Private Limited is the builder.

How many other projects does the builder have on RERA record in Bengaluru?

Prestige Projects Private Limited has 10 projects in our Bengaluru RERA records and 17 complaints against the builder across all projects.

Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Aston Park @ The Prestige City

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Prestige Projects Private Limited? Review the builder.

Reviews of Prestige Projects Private Limited by verified buyers

No verified reviews of Prestige Projects Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Fernvale @ The Prestige CityPrestige Projects Private Limited0.2 km387Mar 203020%0Not collected
Eaton Park @ The Prestige CityPrestige Projects Private Limited0.3 km366Jun 20308%0Not collected
Eden Park @ The Prestige CityPrestige Projects Private Limited0.3 km4,434Nov 2025extended100%2Not collected
Sri Sai ViharSri Sai Ventures0.3 km88Nov 202895%0Not collected
Aban DazzleAban Developers Private Limited0.6 km38Dec 2028—3Not collected
Bilva Phase-II By Bhavisha HomesBhavisha Properties0.6 km226Apr 202737%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/080323/005778.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Sarjapur