Arvind The Park
30×40, 30×43 +5 more plots by Arvind Homes Private Limited · Devanahalli, Bengaluru
Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Arvind Homes Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Arvind The Park at a glance
- Completion (RERA)Dec 2029Karnataka RERA
- Construction90% built · on pace for Dec 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)1 complaintKarnataka RERA · as on 16 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDoddajala · 8.57 km (under construction)Open now: Dasarahalli, 25.52 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 50 min at peak12.39 km straight line · estimate
- Nearest lakeUnnamed lake · 886 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Arvind The Park is a plotted development by Arvind Homes Private Limited in Bengaluru with 340 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Arvind The Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Arvind Homes Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Arvind The Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×43, 30×45, 30×50 +3 more
- Plot area
- 1,086 – 14,016 sq ft
- Total plots
- 340
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 32
- Completion (RERA)
- Dec 2029
- Development (RERA update)
- 90%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 146 |
| 30×43 | 1,290 sq ft | 7 |
| 30×45 | 1,350 sq ft | 2 |
| 30×50 | 1,500 sq ft | 42 |
| 40×42 | 1,680 sq ft | 2 |
| 30×60 | 1,800 sq ft | 4 |
| 40×48 | 1,920 sq ft | 5 |
| Odd-sized (irregular) | varies | 131 |
| Commercial | — | 1 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
32 rows: land conversion orders. Scroll inside the table to see them all.
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 16/1 | Residential | No. 416182, 23 Nov 2022 | DC Office Bangalore rural |
| 16/3 | Residential | No. 416185, 23 Nov 2022 | DC Office Bangalore rural |
| 34/1 | Residential | No. 707259, 15 Nov 2024 | DC Office Bangalore rural |
| 34/2 | Residential | No. 707330, 15 Nov 2024 | DC Office Bangalore rural |
| 34/3 | Residential | No. 707329, 15 Nov 2024 | DC Office Bangalore rural |
| 34/4 | Residential | No. 707331, 15 Nov 2024 | DC Office Bangalore rural |
| 34/5 | Residential | No. 707324, 15 Nov 2024 | DC Office Bangalore rural |
| 34/6 | Residential | No. 707327, 15 Nov 2024 | 707327 |
| 40/1 | Residential | No. 707326, 15 Nov 2024 | DC Office Bangalore rural |
| 40/3 | Residential | No. 707323, 15 Nov 2024 | DC Office Bangalore rural |
| 40/4 | Residential | No. 707321, 15 Nov 2024 | DC Office Bangalore rural |
| 41 | Residential | No. 707322, 15 Nov 2024 | DC Office Bangalore rural |
| 42 | Residential | No. 374714, 5 Sep 2022 | DC Office Bangalore rural |
| 43/2 | Residential | No. 707328, 15 Nov 2024 | DC Office Bangalore rural |
| 43/3 | Residential | No. 353299, 5 Sep 2022 | DC Office Bangalore rural |
| 43/4 | Residential | No. 353302, 5 Sep 2022 | DC Office Bangalore rural |
| SY no 44/2 | Residential | No. 353305, 5 Sep 2022 | DC Office Bangalore rural |
| SY no 44/3 | Residential | No. 353306, 5 Sep 2022 | DC Office Bangalore rural |
| SY no 45 | Residential | No. 374720, 5 Sep 2022 | DC Office Bangalore rural |
| SY no 46 | Residential | No. 374712, 5 Sep 2022 | DC Office Bangalore rural |
| SY no 59/2 | Residential | No. 725445, 29 Nov 2024 | DC Office Bangalore rural |
| SY no 60/2 | Residential | No. 725447, 29 Nov 2024 | DC Office Bangalore rural |
| SY no 62/1 | Residential | No. 416175, 23 Nov 2022 | DC Office Bangalore rural |
| SY no 62/2 | Residential | No. 725446, 29 Nov 2024 | DC Office Bangalore rural |
| SY no 62/4 | Residential | No. 416174, 23 Nov 2022 | DC Office Bangalore rural |
| SY no 62/5 | Residential | No. 416173, 23 Nov 2022 | DC Office Bangalore rural |
| 62/6 | Residential | No. 416191, 23 Nov 2022 | DC Office Bangalore rural |
| 63/1 | Residential | No. 416176, 28 Nov 2022 | DC Office Bangalore rural |
| 63/3 | Residential | No. 416172, 23 Nov 2022 | DC Office Bangalore rural |
| 63/4 | Residential | No. 416177, 23 Nov 2022 | DC Office Bangalore rural |
| 63/5 | Residential | No. 416180, 23 Nov 2022 | DC Office Bangalore rural |
| 63/6 | Residential | No. 416178, 23 Nov 2022 | DC Office Bangalore rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Arvind The Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/050325/007549
- Registered on
- 5 Mar 2025
- Promised completion
- 31 Dec 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Arvind The Park is a plotted layout by Arvind Plots Private Limited in Devanahalli, Bengaluru Rural. The project has 340 plots across multiple sizes, approved by BIAAPA. The layout completion date on RERA is 31 December 2029.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, BANGALORE-YELAHANKA
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/89/2024-25 · dated 31 Jan 2025
- Project cost declared to RERA
- ₹86.7 Cr
Amenities
Arvind The Park location and address
- Address
- Sy no 16/1,16/3,34/1,34/2,34/3,34/4,34/5,34/6,40/1,40/3,40/4,41,42,43/2,43/3,43/4,44/2,44/3,45,46,59/2,60/2, , 62/1,62/2,62/4,62/5,62/6,63/1,63/3,63/4,63/5,63/6 of lingadeeragollahalli, village, kundana hobli, , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Not found in public records yet: village
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.25469, 77.60425
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 12.39 km | approx. 50 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.03 km | approx. 93 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.98 km | approx. 125 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 33.03 km | approx. 134 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 37.74 km | approx. 153 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 45.51 km | approx. 184 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 4Schools and colleges3 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Cambridge Institute of Technology North Campus · 1.16 km
- Moraji Desai Residential School · 1.64 km
- MVM Central School · 1.93 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction8.57 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction10.93 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction13.34 km
- Dasarahalli (ದಾಸರಹಳ್ಳಿ)Open now — nearest operating metro station25.52 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station6.45 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 886 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 886 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,646 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Arvind The Park layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.15 m × 12.20 m | — | 146 |
| Plot 9.15 m × 13.15 m | — | 7 |
| Plot 9.15 m × 13.80 m | — | 2 |
| Plot 9.15 m × 15.25 m | — | 42 |
| Plot 9.15 m × 18.30 m | — | 4 |
| Plot 12.75 m × 12.20 m | — | 2 |
| Plot 14.70 m × 12.20 m | — | 5 |
| Commercial | — | 1 |
| Odd plots | — | 131 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Arvind The Park completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Timeline
- 31 Jan 2025Project start date given to RERA
- 5 Mar 2025Registered with Karnataka RERA
- 31 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2026 — about 37 months before the completion date on RERA (31 Dec 2029).
At the pace between the 4 quarterly filings we have (7% → 90% in 9 months), it would be around Nov 2026 — about 38 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 90% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 84% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 62% | — |
| Q3 2025-26to 31 Dec 2025 | 15 Jan 2026 | 7% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 90% ÷ 19.9 months (31 Jan 2025 to 30 Sep 2026) = 4.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 10 ÷ 4.5 = 2.2 months → Dec 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (90% − 7%) ÷ 9 months = 9.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/89/2024-25 · dated 2025-01-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (32 orders) | DC Office Bangalore rural · No. 416182 and 31 more · dated 2024-11-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (If Applicable) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/89/2024-25 · dated 31 Jan 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Arvind The Park RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00408/2026 | 16 Apr 2026 | Request for full refund due to misrepresentation, contradictory communication, and non-disclosure by promoter | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Arvind Homes Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- U70104GJ2019PTC108188
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Arvind Homes Private Limited’s RERA recordArvind Homes Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Arvind Homes Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 340Plots registeredAs stated in each registrations.
- 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.9Complaints per 1,000 plots1 complaints ÷ 340 plots in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2025
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 90% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 84% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Apr 2026Complaint 00408/2026 filed with RERA: “Request for full refund due to misrepresentation, contradictory communication, and non-disclosure by promoter” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 62% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Quarterly update filed for Q3 2025-26: 7% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Mar 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/050325/007549); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2025Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/LAO/89/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Arvind The Park FAQs
What plot sizes are available at Arvind The Park?
The project has 7 standard plot sizes: 30×40 feet (1,200 sq ft, 146 plots), 30×50 feet (1,500 sq ft, 42 plots), 30×43 feet (1,290 sq ft, 7 plots), 40×48 feet (1,920 sq ft, 5 plots), 30×60 feet (1,800 sq ft, 4 plots), 30×45 feet (1,350 sq ft, 2 plots), and 40×42 feet (1,680 sq ft, 2 plots). There are also 131 odd-sized plots and 1 commercial plot.
How many total plots does Arvind The Park have?
The project has 340 plots in total.
Who approved the layout for Arvind The Park?
The layout was approved by BIAAPA (Bangalore International Airport Area Planning Authority).
How many land conversion orders are in place for Arvind The Park?
There are 32 land conversion orders for the project.
What is the RERA registration number for Arvind The Park?
The RERA registration number is PRM/KA/RERA/1250/303/PR/050325/007549, registered on 5 March 2025.
When will Arvind The Park be completed?
The completion date on RERA is 31 December 2029.
What is the current development status of Arvind The Park?
As of Q2 2026-27 (ended 30 September 2026), the layout is 90% developed.
How many complaints has Arvind The Park received on RERA?
There is 1 complaint on this project on RERA.
What is the developer's RERA record?
Arvind Plots Private Limited has 1 complaint against it across all projects on RERA and 2 projects in the Bengaluru record.
Where is Arvind The Park located?
The project is in Devanahalli taluk, Bengaluru Rural district, with PIN code 562110.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Arvind The Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Arvind Homes Private Limited? Review the developer.
Reviews of Arvind Homes Private Limited by verified buyers
No verified reviews of Arvind Homes Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Assetz City of PalmsAssetz Investments And Holdings Private Limited | 1.2 km | 620 | Feb 2029 | 86% | 0 | Not collected |
| HighgroveSamanvi Estates LLP | 1.4 km | 153 | Mar 2028 | 80% | 0 | Not collected |
| Northern BoulevardNimishamba Developers | 2.5 km | 269 | Dec 2025extended | 100% | 0 | Not collected |
| G K Hill ViewG K Builders & Developers | 2.7 km | 267 | Jun 2025 | — | 0 | Not collected |
| Make BoroughIron Kore Private Limited | 3 km | 35 | Mar 2027 | 100% | 0 | Not collected |
| Prestige GreenbrookPrestige Estates Projects Ltd | 3.1 km | 324 | Mar 2027 | 30% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/050325/007549.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Doddacheemanahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openAssetz City of Palms
by Assetz Investments And Holdings
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 1,117 – 21,323 sq ft plots
- Approved by BIAAPA
- Feb 2029
620 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz City of Palms
Guntas Dyavarahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openHighgrove
by Samanvi Estates
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60
- 546 – 3,373 sq ft plots
- Approved by BIAAPA
- Mar 2028
153 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Highgrove- Aluru Duddanahalli, DevanahalliReady to moveRERA registeredBuyers’ group open
Northern Boulevard
by Nimishamba
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60
- 12,400 – 37,437 sq ft plots
- Approved by Local Planning Authority
- Dec 2025 (extended)
269 plots