Skip to content
Log in

Assetz 22 & Crest

2 & 3 BHK apartments by Bhairav Holdings Inc · Yeshwanthpur, Bengaluru

Yeshwanthpur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Bhairav Holdings Inc

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Assetz 22 & Crest

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Assetz 22 & Crest is a residential project by Bhairav Holdings Inc in Bengaluru with 197 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Assetz 22 & Crest buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Bhairav Holdings Inc for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Assetz 22 & Crest buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 12 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
925 – 1,262 sq ft
Towers
2
Floors
22
Total homes
197
Land
1.8 acres
Possession (extended)
Dec 2026
Built (RERA update)
82%

Assetz 22 & Crest RERA number and registration details

RERA number
TOR/PRM/KA/RERA/1251/309/PR/220802/000219
Registered on
2 Aug 2022
Promised completion
30 Mar 2022
Extended to
31 Dec 2026
RERA status
Under construction
Homes booked
97 of 197 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
TOWER A22287
TOWER B222110

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Assetz 22 & Crest is a residential project by Bhairav Holdings Inc in Bengaluru North with 197 homes across 2 towers of up to 22 floors. The project has a current completion date of 31 December 2026 and is 82% complete as of Q1 2026-27.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
79.1% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, JAIN HEIGHTS AND STRUCTURES PRIVATE LIMITED
Project cost declared to RERA
₹116 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Assetz 22 & Crest location and address

Address
PID No.10-1-71, Yeshwanthapura, Industrial Sub Urb, , Ward No.10, Mahalakshmipuram, Bangalore
Village (RERA)
Not found in public records yet: village
Locality
YeshwanthpurAlso known as Yeshwantpur, Yeshwanthapura
PIN code
560010
City
Bengaluru
State
Karnataka
Coordinates
13.01713, 77.55024

Distances to landmarks

Not found in public records yet: landmarks

About Yeshwanthpur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)4.81 kmapprox. 19 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)8.29 kmapprox. 34 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)17.59 kmapprox. 71 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)20.58 kmapprox. 83 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)22.39 kmapprox. 91 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)26.37 kmapprox. 107 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 66Schools and colleges27 schools, 29 colleges, 10 kindergartens
  • 63Hospitals and clinics47 hospitals, 16 clinics

Nearest schools and colleges

  • Government School · 0.56 km
  • M.S.Polytechnic · 0.61 km
  • Orchids The International School - Mahalakshmi Layout · 0.71 km

Nearest hospitals and clinics

  • Government Maternity Hospital · 0.6 km
  • NU Hospitals · 0.64 km
  • Narayana Nethralaya · 0.65 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Sandal Soap Factory (ಸಾಂಡಲ್ ಸೋಪ್ ಕಾರ್ಖಾನೆ)Open now — nearest operating metro station0.49 km
  • Yesvantpur Junction (ಯಶವಂತಪುರ ಜಂಕ್ಷನ್)Nearest railway station0.74 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Mathikere Lake, 1,644 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Assetz 22 & Crest home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan2 files

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Assetz 22 & Crest

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK925 – 965 sq ft2
3 BHK952 – 1,262 sq ft195

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz 22 & Crest possession date and construction status

  • Whole project (promoter’s RERA update)82%

    as on · 97 of 197 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.

By tower (Q1 2026-27)

  • TOWER A100%
  • TOWER B100%

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
2 BHK202
3 BHK1959798

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 30 Oct 2016Project start date given to RERA
  2. 30 Mar 2022Completion date given at registration
  3. 2 Aug 2022Registered with Karnataka RERA
  4. 30 Mar 2023Section 6 Extension: completion date moved to this date
  5. 31 Dec 2026Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 14 Jul 2026

At the average pace so far, construction would reach 100% around Aug 2028 — about 19 months after the completion date on RERA (31 Dec 2026).

At the pace between the 3 quarterly filings we have (71% → 82% in 6 months), it would be around Apr 2027 — about 4 months after the RERA date.

0%25%50%75%100%201720192021202320252027RERA date71%74%82%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q1 2026-27to 30 Jun 202614 Jul 202682%97 of 197
Q4 2025-26to 31 Mar 202615 Apr 202674%96 of 197
Q3 2025-26to 31 Dec 202516 Feb 202671%87 of 197
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 82% ÷ 116 months (30 Oct 2016 to 30 Jun 2026) = 0.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 18 ÷ 0.7 = 25.5 months → Aug 2028. This is an estimate, not a date from the builder or RERA.

Pace between filings = (82% − 71%) ÷ 5.9 months = 1.8% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 12 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Assetz 22 & Crest RERA complaints and orders

4 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
00734/202513 May 2025Delay in handing over the possession and seeking revision of the project completion date.Disposed aoSource (rera.karnataka.gov.in) (opens in a new tab)
00606/20257 Apr 2025Delay in handing over the appartment and seeking revision of project compleation dateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00077/202317 Jan 2023Refund with InterestDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00076/202317 Jan 2023Refund with InterestDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Bhairav Holdings Inc

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
4
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Bhairav Holdings Inc’s RERA record

Bhairav Holdings Inc delivery record

As on 12 Oct 2026

What the complaints are about

  • Refund of booking or other money2
  • Delay in possession or delay interest2

4 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Oct 2016

As on 12 Oct 2026
  1. 31 Dec 2026Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Jul 2026Quarterly update filed for Q1 2026-27: 82% built, 97 of 197 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 74% built, 96 of 197 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 16 Feb 2026Quarterly update filed for Q3 2025-26: 71% built, 87 of 197 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 13 May 2025Complaint 00734/2025 filed with RERA: “Delay in handing over the possession and seeking revision of the project completion date.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 7 Apr 2025Complaint 00606/2025 filed with RERA: “Delay in handing over the appartment and seeking revision of project compleation date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 17 Jan 2023Complaint 00077/2023 filed with RERA: “Refund with Interest” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 17 Jan 2023Complaint 00076/2023 filed with RERA: “Refund with Interest” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 2 Aug 2022Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/309/PR/220802/000219); completion date 30 Mar 2022 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 30 Oct 2016Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Assetz 22 & Crest FAQs

What is the completion date for Assetz 22 & Crest?

The current completion date on RERA is 31 December 2026. The original registered date was 30 March 2022, extended to 30 March 2023, then further extended to 31 December 2026.

How many homes are in Assetz 22 & Crest?

The project has 197 homes across 2 towers with a maximum of 22 floors.

What home types are available in Assetz 22 & Crest?

The project offers 2 BHK homes with carpet area from 925 to 965 sq ft and 3 BHK homes with carpet area from 952 to 1,262 sq ft.

What is the construction progress on Assetz 22 & Crest?

As of Q1 2026-27, the project is 82% complete with 97 homes booked out of 197 total homes.

Where is Assetz 22 & Crest located?

The project is in Bengaluru North taluk, Bengaluru Urban district, PIN code 560010.

Who is the builder of Assetz 22 & Crest?

The builder is Bhairav Holdings Inc, registered as a partnership firm.

How many RERA complaints have been filed on Assetz 22 & Crest?

There are 4 complaints on this project registration.

What is the builder's record with RERA?

There are 4 complaints against Bhairav Holdings Inc across all projects, and this is the only project by this builder in the Bengaluru RERA records.

What is the land area of Assetz 22 & Crest?

The land area is 7,275 sq m.

Which bank holds the escrow for Assetz 22 & Crest?

HDFC holds the escrow account for this project.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Assetz 22 & Crest

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Bhairav Holdings Inc? Review the builder.

Reviews of Bhairav Holdings Inc by verified buyers

No verified reviews of Bhairav Holdings Inc yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Durga SamrudhiSree Shivadurga Builders4.5 km79Dec 202698%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/309/PR/220802/000219.

  • RERA record last checked: 12 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 14 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Yeshwanthpur

  • Durga Samrudhi: Site photo filed with Karnataka RERAJarakabandekaval, Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group open

    Durga Samrudhi

    by Sree Shivadurga Builders

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK
    • 765 – 1,384 sq ft
    • Dec 2026

    79 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Durga Samrudhi
  • Srirampura, JakkurUnder constructionRERA registeredBuyers’ group open

    Mane-Bs49

    by Eternity Structures

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK, 3.5 BHK
    • 701 – 1,149 sq ft
    • Apr 2028

    114 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Mane-Bs49