DS Max Sasmara

2 & 3 BHK apartments by DS Max Properties Private Limited · Kodigehalli, Vidyaranyapura–Jalahalli, Bengaluru

Kodigehalli, Vidyaranyapura–Jalahalli, BengaluruOpen on Google Maps (opens in a new tab)

  • Completion filed with RERA
  • RERA registered
  • residential

Ready homes still available: 43 of 88 homes were unsold when the builder filed completion with RERA (2 Feb 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.

by DS-Max Properties

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for DS Max Sasmara

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

DS Max Sasmara is a residential project by DS Max Properties Private Limited in Kodigehalli, Bengaluru with 88 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2024.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

DS Max Sasmara buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the DS Max Sasmara buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 4 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
580 – 996 sq ft
Towers
1
Floors
3
Total homes
88
Land
0.84 acres
Possession (RERA)
Dec 2024
Built (RERA update)
Not found in public records yet: construction progress

DS Max Sasmara RERA number and registration details

RERA number
PRM/KA/RERA/1251/472/PR/221221/004599
Registered on
22 Dec 2021
Promised completion
31 Dec 2024
Extended to
No extension recorded
RERA status
Completed
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
SASMARA3188

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

DS Max Sasmara is a residential project by DS Max Properties Private Limited in Kodigehalli, Yelahanka. It has 88 homes across 1 tower with 3 floors. The project is registered to complete on 31 December 2024.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
40.3% of land
Water and power
Water source filed with RERA: BoreWell,BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Indian Bank, DODDA BANASAWADI
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 21 Jan 2021
Project cost declared to RERA
₹27.65 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Community Hall
  • Outdoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sasmara location and address

Address
SY NO: 97/2 , situated at Kodigehalli village, Yelahanka Hobli, Bangalore North Taluk, Bangalore , Yelahanka , Bengaluru Urban, Karnataka - 560092
Village (RERA)
Kodigehalli
Locality
Vidyaranyapura–JalahalliAlso known as Vidyaranyapura, Jalahalli
PIN code
560092
City
Bengaluru
State
Karnataka
Coordinates
13.05927, 77.57398

Distances to landmarks

Not found in public records yet: landmarks

About Vidyaranyapura–Jalahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)5.12 kmapprox. 21 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)9.03 kmapprox. 37 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)19.03 kmapprox. 77 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)19.45 kmapprox. 79 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)21.14 kmapprox. 86 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)25.31 kmapprox. 102 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 27Schools and colleges20 schools, 4 colleges, 3 kindergartens
  • 24Hospitals and clinics6 hospitals, 18 clinics

Nearest schools and colleges

  • Vyasa International School · 0.8 km
  • Vidyaspoorthi School · 0.86 km
  • Trio World Academy · 0.9 km

Nearest hospitals and clinics

  • MEDSTAR Speciality Hospital · 1.31 km
  • Medical Center · 1.39 km
  • Glow up Skin, Hair & Laser clinic · 1.44 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Blue Line metro, under construction2.15 km
  • Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction2.39 km
  • Hebbal (ಹೆಬ್ಬಾಳ)Blue Line metro, under construction2.69 km
  • Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station4.78 km
  • Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Nearest railway station0.47 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Doddabommasandra Kere, 806 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

DS Max Sasmara home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for DS Max Sasmara

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK580 – 722 sq ft41
3 BHK691 – 996 sq ft47

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sasmara possession date and construction status

Not found in public records yet: construction progress

Timeline

  1. 15 Dec 2021Project start date given to RERA
  2. 22 Dec 2021Registered with Karnataka RERA
  3. 31 Dec 2024Completion date given at registration
  4. 2 Feb 2026Promoter applied to RERA for completion

Approvals and documents checklist

14 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 2021-01-21Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDeputy Commissioner, Bangalore District · No. ALN(NAY)S R 169/2010-11 · dated 2011-02-24Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
District Magistratescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 21 Jan 2021
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

DS Max Sasmara RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About DS-Max Properties

Founded
2007
Headquarters
Bengaluru
Bengaluru projects
44
Delivered on time
17 of 21
RERA complaints
19
Court cases listed
6

DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.

DS-Max Properties’s full record

DS-Max Properties delivery record

As on 22 Oct 2026
  • 24Projects in Bengaluru on RERA24 approved registrations under DS Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 10,303Homes registeredAs stated in each registrations.
  • 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
  • 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
  • 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
  • 6Court cases listedFound in public court records; see the list on the builder’s page.

What the complaints are about

  • Delay in possession or delay interest6
  • Refund of booking or other money5
  • Construction quality, size or inspection2
  • Registration, sale deed or agreement2
  • Other4

19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
DS Max ShrestaOC on RERA31 Jul 202625 Sep 20262 months after
DS Max Sky ShubhamOC on RERA31 Mar 202711 May 2026By the date
DS Max SenateOC on RERA30 Jun 202611 May 2026By the date
DS Max Stavam NestOC on RERA30 Jun 202611 May 2026By the date
DS-Max Sky SupremeOC on RERA31 Dec 2023extended to 30 Sep 20242 Feb 202625 months after
DS Max Sonata NestOC on RERA30 Jun 20242 Feb 202619 months after
DS Max SasmaraOC on RERA31 Dec 20242 Feb 202613 months after
Sky GrandOC on RERA31 Mar 2023extended to 30 Dec 202431 Jan 202634 months after
DS Max StavamOC on RERA31 Mar 202531 Jan 202610 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Handovers we checked by hand

21 rows: handovers. Scroll inside the table to see them all.

ProjectPromised (at registration)OCResultSource
DS MAX SHRESTA31 Jul 202627 May 2026On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SENATE30 Jun 202621 Jan 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SKY GRAND31 Mar 20231 Jan 202521 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SKY SHUBHAM31 Mar 202716 Nov 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SASMARA31 Dec 202429 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX STAVAM NEST30 Jun 202629 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS-MAX SKY SUPREME31 Dec 202329 Nov 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
SANGAM GRAND31 Mar 202331 May 20232 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX STAVAM31 Mar 202525 Apr 2023On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SKY CLASSIC31 Dec 20226 Jan 20231 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SONATA NEST30 Jun 202420 Jul 2021On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SONATA31 Dec 20202 Jun 20215 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SYNERGY31 Dec 20223 Apr 2021On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Sankalp Manor30 Jun 202229 Oct 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SATELLITE31 Dec 202024 Apr 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS-MAX STAR LINE31 Dec 202020 Apr 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SPLENDID31 Mar 201920 Dec 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX SAVERA30 Jun 201911 Jul 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS MAX Silver Oak11 Dec 201828 May 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS - Max Sparkle Nest14 Jun 201917 May 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
DS Max Silverwood1 May 201921 Nov 2017On timeSource (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this

What’s changed since Jan 2021

As on 4 Oct 2026
  1. 2 Feb 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 22 Dec 2021Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/221221/004599); completion date 31 Dec 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Dec 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 21 Jan 2021Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/AD.COM/YLK/0470/20-21) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

DS Max Sasmara FAQs

What is DS Max Sasmara?

DS Max Sasmara is a residential project in Kodigehalli, Yelahanka, with 88 homes in 1 tower.

How many homes are in DS Max Sasmara?

The project has 88 homes: 41 two-bedroom and 47 three-bedroom units.

What are the home sizes in DS Max Sasmara?

2 BHK homes range from 580 to 722 sq ft carpet area, and 3 BHK homes range from 691 to 996 sq ft carpet area.

What is the RERA registration number for DS Max Sasmara?

The RERA registration number is PRM/KA/RERA/1251/472/PR/221221/004599, registered on 22 December 2021.

When is DS Max Sasmara scheduled to complete?

The project is registered to complete on 31 December 2024, with an applied extension to 2 February 2026.

How many complaints are there against DS Max Sasmara?

There are no RERA complaints on this project.

What is the location of DS Max Sasmara?

The project is in Kodigehalli, Yelahanka taluk, Bengaluru Urban district, PIN 560092.

What is the land area of DS Max Sasmara?

The land area is 3,399 sq m.

How many towers does DS Max Sasmara have?

The project has 1 tower with a maximum of 3 floors.

What bank holds the escrow for DS Max Sasmara?

Indian Bank holds the escrow account for this project.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about DS Max Sasmara

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from DS-Max Properties? Review the builder.

Reviews of DS-Max Properties by verified buyers

No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Sri Rama EnclaveMega Infra1.1 km64Sep 2026100%0Not collected
HRS Sai Guru Bliss AvenueHRS Sai Guru Developers LLP1.6 km45Feb 2027100%0Not collected
Olivia At Raintree Boulevard Cluster 7L and T Realty Developers Limited2.1 km480Mar 2026100%1Not collected
Elara CelestiaL&T Realty Developers Limited2.3 km634Mar 203023%1Not collected
Kay Arr MaverickKay Arr & Co2.5 km4Jan 2022extended—0Not collected
Sankalp Windsor HouseSankalp Constructions Private Limited2.8 km8Dec 2025—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/221221/004599.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Dec 2021

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Vidyaranyapura–Jalahalli