DS Max Sasmara
2 & 3 BHK apartments by DS Max Properties Private Limited · Kodigehalli, Vidyaranyapura–Jalahalli, Bengaluru
Kodigehalli, Vidyaranyapura–Jalahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- residential
Ready homes still available: 43 of 88 homes were unsold when the builder filed completion with RERA (2 Feb 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
DS Max Sasmara at a glance
- Possession (RERA)Dec 2024Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Builder on-time record17 of 21 on time Some lateCompleted projects: OC date vs promised date
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroKodigehalli · 2.15 km (under construction)Open now: Yeshwantpur, 4.78 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 86 min at peak21.14 km straight line · estimate
- Nearest lakeDoddabommasandra Kere · 806 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
DS Max Sasmara is a residential project by DS Max Properties Private Limited in Kodigehalli, Bengaluru with 88 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2024.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
DS Max Sasmara buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the DS Max Sasmara buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 580 – 996 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 88
- Land
- 0.84 acres
- Possession (RERA)
- Dec 2024
- Built (RERA update)
- Not found in public records yet: construction progress
DS Max Sasmara RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/221221/004599
- Registered on
- 22 Dec 2021
- Promised completion
- 31 Dec 2024
- Extended to
- No extension recorded
- RERA status
- Completed
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SASMARA | 3 | 1 | 88 |
A dash (—) means the filing did not state that value.
Summary in plain English
DS Max Sasmara is a residential project by DS Max Properties Private Limited in Kodigehalli, Yelahanka. It has 88 homes across 1 tower with 3 floors. The project is registered to complete on 31 December 2024.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 40.3% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Indian Bank, DODDA BANASAWADI
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 21 Jan 2021
- Project cost declared to RERA
- ₹27.65 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Community Hall
- Outdoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
DS Max Sasmara location and address
- Address
- SY NO: 97/2 , situated at Kodigehalli village, Yelahanka Hobli, Bangalore North Taluk, Bangalore , Yelahanka , Bengaluru Urban, Karnataka - 560092
- Village (RERA)
- Kodigehalli
- Locality
- Vidyaranyapura–JalahalliAlso known as Vidyaranyapura, Jalahalli
- PIN code
- 560092
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.05927, 77.57398
Distances to landmarks
Not found in public records yet: landmarksAbout Vidyaranyapura–Jalahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 5.12 km | approx. 21 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 9.03 km | approx. 37 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 19.03 km | approx. 77 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 19.45 km | approx. 79 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 21.14 km | approx. 86 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.31 km | approx. 102 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 27Schools and colleges20 schools, 4 colleges, 3 kindergartens
- 24Hospitals and clinics6 hospitals, 18 clinics
Nearest schools and colleges
- Vyasa International School · 0.8 km
- Vidyaspoorthi School · 0.86 km
- Trio World Academy · 0.9 km
Nearest hospitals and clinics
- MEDSTAR Speciality Hospital · 1.31 km
- Medical Center · 1.39 km
- Glow up Skin, Hair & Laser clinic · 1.44 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Blue Line metro, under construction2.15 km
- Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction2.39 km
- Hebbal (ಹೆಬ್ಬಾಳ)Blue Line metro, under construction2.69 km
- Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station4.78 km
- Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Nearest railway station0.47 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Doddabommasandra Kere, 806 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Doddabommasandra Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಬೊಮ್ಮಸಂದ್ರ ಕೆರೆ)806 m
- BEL Lake on OpenStreetMap (opens in a new tab) 921 m
- Hebbal Lake on OpenStreetMap (opens in a new tab) (ಹೆಬ್ಬಾಳ ಕೆರೆ)1,204 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
DS Max Sasmara home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 580 – 722 sq ft | 41 |
| 3 BHK | 691 – 996 sq ft | 47 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
DS Max Sasmara possession date and construction status
Timeline
- 15 Dec 2021Project start date given to RERA
- 22 Dec 2021Registered with Karnataka RERA
- 31 Dec 2024Completion date given at registration
- 2 Feb 2026Promoter applied to RERA for completion
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 2021-01-21 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner, Bangalore District · No. ALN(NAY)S R 169/2010-11 · dated 2011-02-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/YLK/0470/20-21 · dated 21 Jan 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
DS Max Sasmara RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About DS-Max Properties
- Founded
- 2007
- Headquarters
- Bengaluru
- Bengaluru projects
- 44
- Delivered on time
- 17 of 21
- RERA complaints
- 19
- Court cases listed
- 6
DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.
DS-Max Properties’s full recordDS-Max Properties delivery record
- 24Projects in Bengaluru on RERA24 approved registrations under DS Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 10,303Homes registeredAs stated in each registrations.
- 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
- 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
- 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 6Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| DS Max ShrestaOC on RERA | 31 Jul 2026 | 25 Sep 2026 | 2 months after |
| DS Max Sky ShubhamOC on RERA | 31 Mar 2027 | 11 May 2026 | By the date |
| DS Max SenateOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS Max Stavam NestOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS-Max Sky SupremeOC on RERA | 31 Dec 2023extended to 30 Sep 2024 | 2 Feb 2026 | 25 months after |
| DS Max Sonata NestOC on RERA | 30 Jun 2024 | 2 Feb 2026 | 19 months after |
| DS Max SasmaraOC on RERA | 31 Dec 2024 | 2 Feb 2026 | 13 months after |
| Sky GrandOC on RERA | 31 Mar 2023extended to 30 Dec 2024 | 31 Jan 2026 | 34 months after |
| DS Max StavamOC on RERA | 31 Mar 2025 | 31 Jan 2026 | 10 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
21 rows: handovers. Scroll inside the table to see them all.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
What’s changed since Jan 2021
- 2 Feb 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Dec 2021Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/221221/004599); completion date 31 Dec 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Dec 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Jan 2021Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/AD.COM/YLK/0470/20-21) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
DS Max Sasmara FAQs
What is DS Max Sasmara?
DS Max Sasmara is a residential project in Kodigehalli, Yelahanka, with 88 homes in 1 tower.
How many homes are in DS Max Sasmara?
The project has 88 homes: 41 two-bedroom and 47 three-bedroom units.
What are the home sizes in DS Max Sasmara?
2 BHK homes range from 580 to 722 sq ft carpet area, and 3 BHK homes range from 691 to 996 sq ft carpet area.
What is the RERA registration number for DS Max Sasmara?
The RERA registration number is PRM/KA/RERA/1251/472/PR/221221/004599, registered on 22 December 2021.
When is DS Max Sasmara scheduled to complete?
The project is registered to complete on 31 December 2024, with an applied extension to 2 February 2026.
How many complaints are there against DS Max Sasmara?
There are no RERA complaints on this project.
What is the location of DS Max Sasmara?
The project is in Kodigehalli, Yelahanka taluk, Bengaluru Urban district, PIN 560092.
What is the land area of DS Max Sasmara?
The land area is 3,399 sq m.
How many towers does DS Max Sasmara have?
The project has 1 tower with a maximum of 3 floors.
What bank holds the escrow for DS Max Sasmara?
Indian Bank holds the escrow account for this project.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about DS Max Sasmara
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from DS-Max Properties? Review the builder.
Reviews of DS-Max Properties by verified buyers
No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sri Rama EnclaveMega Infra | 1.1 km | 64 | Sep 2026 | 100% | 0 | Not collected |
| HRS Sai Guru Bliss AvenueHRS Sai Guru Developers LLP | 1.6 km | 45 | Feb 2027 | 100% | 0 | Not collected |
| Olivia At Raintree Boulevard Cluster 7L and T Realty Developers Limited | 2.1 km | 480 | Mar 2026 | 100% | 1 | Not collected |
| Elara CelestiaL&T Realty Developers Limited | 2.3 km | 634 | Mar 2030 | 23% | 1 | Not collected |
| Kay Arr MaverickKay Arr & Co | 2.5 km | 4 | Jan 2022extended | — | 0 | Not collected |
| Sankalp Windsor HouseSankalp Constructions Private Limited | 2.8 km | 8 | Dec 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/221221/004599.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Dec 2021
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Vidyaranyapura–Jalahalli
Kodigehalli, Vidyaranyapura–JalahalliReady to moveRERA registeredBuyers’ group openSri Rama Enclave
by Mega Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 805 – 1,110 sq ft
- Sep 2026
64 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Rama Enclave
Jarakabandekaval, Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group openDurga Samrudhi
by Sree Shivadurga Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 765 – 1,384 sq ft
- Dec 2026
79 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Durga Samrudhi
Jarakabandekaval, Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group openSumuk Square-2
by sumuk
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 692 – 1,156 sq ft
- Apr 2029
79 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sumuk Square-2