Assetz Soho & Sky
3 & 4 BHK apartments by APG Imperial Homes Private Limited · Srirampura, Jakkur, Bengaluru
Srirampura, Jakkur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by APG Imperial Homes Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Soho & Sky at a glance
- Possession (RERA)Dec 2027Karnataka RERA
- Construction85% built · on pace for Apr 2027RERA filing to 30 Sep 2026 (Phase 1B); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroJakkur Cross · 2.27 km (under construction)Open now: Yeshwantpur, 8.7 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 71 min at peak17.49 km straight line · estimate
- Nearest lakeRachenahalli Lake · 347 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Soho & Sky is a residential project by APG Imperial Homes Private Limited in Srirampura, Bengaluru with 234 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027. It is registered in 2 phases.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Assetz Soho & Sky buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks APG Imperial Homes Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Soho & Sky buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 1,315 – 1,886 sq ft
- Towers
- 8
- Floors
- 13
- Total homes
- 234
- Land
- 9.03 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Assetz Soho & Sky RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/250322/004785
- Registered on
- 25 Mar 2022
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/472/PR/250322/004785 | 30 Sep 2026 | 114 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 1B | PRM/KA/RERA/1251/309/PR/200524/006910 | 31 Dec 2027 | 120 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| WING A | Main registration | 1 | 1 | 2 |
| WING B | Main registration | 1 | 1 | 4 |
| WING C | Main registration | 1 | 2 | 4 |
| WING D | Main registration | 13 | 2 | 52 |
| WING E | Main registration | 13 | 2 | 52 |
| WING A | Phase 1B | 13 | 1 | 24 |
| WING B | Phase 1B | 13 | 1 | 48 |
| WING C | Phase 1B | 13 | 2 | 48 |
A dash (—) means the filing did not state that value.
Summary in plain English
Assetz Soho & Sky is a residential project by APG Imperial Homes Private Limited in Srirampura, Yelahanka, with 234 homes across two phases. The main registration has 5 towers and Phase 1B has 3 towers. The main phase is scheduled for completion on 30 September 2026, and Phase 1B on 31 December 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- HDFC, Richmond Road
- Escrow bank (RERA) · Phase 1B
- HDFC, RICHMOND ROAD
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Assetz Soho & Sky location and address
- Address
- SY.NO.14/1(P), 14/2(P), 15/1(P), 15/2, 15/3, 15/4, 15/5(P), 16/2(P), 61/1 AND 61/3 , SRIRAMPURA VILLAGE YELAHANKA HOBLI , Yelahanka , Bengaluru Urban, Karnataka - 560064
- Village (RERA)
- Srirampura
- Locality
- Jakkur
- PIN code
- 560064
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.07032, 77.61410
Distances to landmarks
Not found in public records yet: landmarksAbout Jakkur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 2.54 km | approx. 10 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 11.33 km | approx. 46 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 16.25 km | approx. 66 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.49 km | approx. 71 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 17.85 km | approx. 72 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.15 km | approx. 102 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 20Schools and colleges15 schools, 3 colleges, 2 kindergartens
- 12Hospitals and clinics5 hospitals, 7 clinics
Nearest schools and colleges
- Vibgyor · 0.47 km
- GHPS · 0.67 km
- Ashoka Trust for Research in Ecology and Environment · 0.95 km
Nearest hospitals and clinics
- Dr. Shekars Diabetes Speciality Centre · 1.07 km
- Amruth Clinic · 1.17 km
- Axis Hospital · 1.18 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction2.27 km
- Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Blue Line metro, under construction2.68 km
- Kempapura (ಕೆಂಪಾಪುರ)Blue Line metro, under construction3.11 km
- Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station8.7 km
- Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Nearest railway station4.22 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Rachenahalli Lake, 347 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Rachenahalli Lake on OpenStreetMap (opens in a new tab) (ರಾಚೇನಹಳ್ಳಿ ಕೆರೆ)347 m
- Jakkur Lake on OpenStreetMap (opens in a new tab) (ಜಕ್ಕೂರು ಕೆರೆ)1,044 m
- Sampigehalli Lake on OpenStreetMap (opens in a new tab) (ಸಂಪಿಗೆಹಳ್ಳಿ ಕೆರೆ)1,205 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Soho & Sky floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

Phase 1B: BrochureFull PDF on RERA 







Main registration: BrochureFull PDF on RERA 






Approved building plan3 files

Main registration: Approved Building/Plotting PlanFull PDF on RERA 
Phase 1B: Annexure 20-Approved Sanction plan -Lower Basment to Terrace planFiled 17 May 2024 · Full PDF on RERA 
Phase 1B: Annexure 29A-Approved Sanction plan -Lower Basment to Terrace planFiled 17 May 2024 · Full PDF on RERA
Approved layout plan

Phase 1B: Annexure 112-Demarcation Drawing.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,315 – 1,659 sq ft | 195 |
| 4 BHK | 1,886 sq ft | 39 |
| Apartments | 1,544 sq ft | 114 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Assetz Soho & Sky possession date and construction status
Timeline
- 25 Mar 2022Main registration: Registered with Karnataka RERA
- 1 Apr 2022Main registration: Project start date given to RERA
- 1 Oct 2023Phase 1B: Project start date given to RERA
- 20 May 2024Phase 1B: Registered with Karnataka RERA
- 30 Sep 2026Main registration: Completion date given at registration
- 31 Dec 2027Phase 1B: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 1B)
At the average pace so far, construction would reach 100% around Apr 2027 — about 9 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (74% → 85% in 9 months), it would be around Oct 2027 — about 3 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 1B, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 85% | 120 of 120 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 81% | 120 of 120 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 78% | 118 of 120 |
| Q3 2025-26to 31 Dec 2025 | 10 Mar 2026 | 74% | 110 of 120 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 85% ÷ 36 months (1 Oct 2023 to 30 Sep 2026) = 2.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 15 ÷ 2.4 = 6.3 months → Apr 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (85% − 74%) ÷ 9 months = 1.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
26 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/8451/21-22 · dated 2022-02-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (10 orders) (Main registration) | Special Deputy Commissioner · No. 14-1 - ALN SR (NA) 56/2002-03 and 9 more · dated 2002-08-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 1B) | BBMP - Bruhat Bengaluru Mahanagara Palike · dated 2024-04-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (10 orders) (Phase 1B) | Special Deputy Commissioner · No. ALN SR (NA) 56/2002-03 and 9 more · dated 2002-08-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1B) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Main registration)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/CC/8451/21-22 · dated 11 Feb 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Assetz Soho & Sky RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About APG Imperial Homes Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45209KA2015PTC084242
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
APG Imperial Homes Private Limited’s RERA recordAPG Imperial Homes Private Limited delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under APG Imperial Homes Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 234Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 234 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2022
- 15 Oct 2026Phase 1B: Quarterly update filed for Q2 2026-27: 85% built, 120 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Main registration: Quarterly update filed for Q1 2026-27: 93% built, 114 of 114 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1B: Quarterly update filed for Q1 2026-27: 81% built, 120 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Main registration: Quarterly update filed for Q4 2025-26: 91% built, 111 of 114 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1B: Quarterly update filed for Q4 2025-26: 78% built, 118 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2026Main registration: Quarterly update filed for Q3 2025-26: 90% built, 110 of 114 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2026Phase 1B: Quarterly update filed for Q3 2025-26: 74% built, 110 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 May 2024Phase 1B: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/200524/006910); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Apr 2024Phase 1B: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Phase 1B: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2022Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Mar 2022Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/250322/004785); completion date 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Feb 2022Main registration: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/CC/8451/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Assetz Soho & Sky FAQs
What is the RERA registration number for Assetz Soho & Sky?
The project has two RERA registrations: PRM/KA/RERA/1251/472/PR/250322/004785 for the main registration (registered 25 March 2022) and PRM/KA/RERA/1251/309/PR/200524/006910 for Phase 1B (registered 20 May 2024).
How many homes are in Assetz Soho & Sky?
The project has 234 homes in total: 114 homes in the main registration and 120 homes in Phase 1B.
What home types are available in Assetz Soho & Sky?
The main registration offers 3 BHK homes with carpet area between 1,315 to 1,659 sq ft (87 homes) and 4 BHK homes with 1,886 sq ft (27 homes), plus 114 apartments with 1,544 sq ft. Phase 1B offers 3 BHK homes with carpet area between 1,315 to 1,659 sq ft (108 homes) and 4 BHK homes with 1,886 sq ft (12 homes).
When will Assetz Soho & Sky be completed?
The main registration is scheduled for completion on 30 September 2026, and Phase 1B on 31 December 2027.
What is the construction progress of Assetz Soho & Sky?
As of Q1 2026-27 (ended 30 June 2026), the main registration is 93% complete. As of Q2 2026-27 (ended 30 September 2026), Phase 1B is 85% complete.
How many homes are booked in Assetz Soho & Sky?
As of the latest quarterly updates, 114 homes are booked in the main registration (Q1 2026-27) and 120 homes are booked in Phase 1B (Q2 2026-27).
What is the location and PIN code of Assetz Soho & Sky?
The project is located in Srirampura, Yelahanka taluk, Bengaluru Urban district, with PIN code 560064.
Are there any RERA complaints on Assetz Soho & Sky?
There are no RERA complaints on this project.
How many towers are in Assetz Soho & Sky?
The main registration has 5 towers with a maximum of 13 floors, and Phase 1B has 3 towers with a maximum of 13 floors.
What is the builder's record on other projects?
APG Imperial Homes Private Limited has 1 project in the Karnataka RERA records and no complaints against the builder across all projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Assetz Soho & Sky
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from APG Imperial Homes Private Limited? Review the builder.
Reviews of APG Imperial Homes Private Limited by verified buyers
No verified reviews of APG Imperial Homes Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Alpine Pyramid - IrisAlpine Housing Development Corporation Limited | 0.2 km | 109 | Apr 2028 | 42% | 0 | Not collected |
| Unishire PremiaUnishire Skyscapes LLP | 0.5 km | 77 | Dec 2026extended | — | 17 | Not collected |
| Pramodh Fort HouseThipparthi Constructions And Housing Pvt Ltd | 0.7 km | 20 | Dec 2027 | 28% | 0 | Not collected |
| Cumins SanctumCumins Sanctum LLP | 0.7 km | 112 | Dec 2031 | 22% | 0 | Not collected |
| Elegant AuraElegant Builders And Developers | 1 km | 86 | Jun 2027 | 58% | 0 | Not collected |
| SNN Estates FelicitySNN Builders Private Limited | 1 km | 580 | Dec 2028 | 58% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/472/PR/250322/004785, PRM/KA/RERA/1251/309/PR/200524/006910.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Jakkur
Kodigehalli, JakkurUnder constructionRERA registeredBuyers’ group openAlpine Pyramid - Iris
by Alpine Housing Development Corporation
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 704 – 1,028 sq ft
- Apr 2028
109 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Alpine Pyramid - Iris- Srirampura, Jakkur© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Unishire Premia
by Unishire Skyscapes
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,083 – 1,901 sq ft
- Dec 2026 (extended)
77 homes · 17 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Unishire Premia
Srirampura, near ThanisandraUnder constructionRERA registeredBuyers’ group openPramodh Fort House
by Thipparthi Constructions And Housing
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 695 – 996 sq ft
- Dec 2027
20 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pramodh Fort House