Skip to content
Log in

Atz Areva

1, 2 & 3 BHK apartments by Atz Properties · Balagere, near Panathur, Bengaluru

Balagere, near Panathur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Jun 2026; no extension or completion filed
  • residential

by Atz Properties

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Atz Areva

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Atz Areva is a residential project by Atz Properties in Balagere, Bengaluru with 180 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.

Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Atz Areva buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Atz Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Atz Areva buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 12 Oct 2026
Home types
1 BHK, 2 BHK, 2.5 BHK, 3 BHK
Carpet area
727 – 978 sq ft
Towers
1
Floors
9
Total homes
180
Land
1.17 acres
Possession (extended)
Jun 2026
Built (RERA update)
Not found in public records yet: construction progress

Atz Areva RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/210705/004180
Registered on
5 Jul 2021
Promised completion
1 Dec 2023
Extended to
30 Jun 2026
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
ATZ AREVA9190

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Atz Areva is a residential project by Atz Properties in Balagere, Bengaluru East, with 180 homes in 1 tower. The project was registered with RERA on 5 July 2021 with a completion date of 30 June 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
55% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Bank of Baroda, Infantry Road
Project cost declared to RERA
₹47 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Atz Areva location and address

Address
Khatha No.350, Sy. No.74/2 and Sy. No.75/2, Munciple No.10, , Balagere Village, Varthur Hobli, Bangalore East Taluk
Village (RERA)
Balagere
Locality
Near Panathur
PIN code
560052
City
Bengaluru
State
Karnataka
Coordinates
12.93928, 77.72548

Distances to landmarks

Not found in public records yet: landmarks

About Balagere

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)5.1 kmapprox. 21 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)5.54 kmapprox. 22 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)11.93 kmapprox. 48 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16.66 kmapprox. 67 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.44 kmapprox. 71 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)29.16 kmapprox. 118 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 14Schools and colleges12 schools, 0 colleges, 2 kindergartens
  • 16Hospitals and clinics3 hospitals, 13 clinics

Nearest schools and colleges

  • Sarah Montessori · 0.45 km
  • NPS Marathahalli · 1.04 km
  • Ekya Nava · 1.08 km

Nearest hospitals and clinics

  • Shubham · 0.34 km
  • Apollo Clinic · 0.61 km
  • Nakkshatra Clinic · 0.92 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction3.04 km
  • Marathahalli (ಮಾರತಹಳ್ಳಿ)Blue Line metro, under construction3.34 km
  • Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station4.15 km
  • Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station1.99 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Varthur Lake, 444 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Atz Areva floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans5 pages

Home typeCarpet areaHomes
1 BHK814 sq ft1
2 BHK727 – 888 sq ft53
3 BHK941 – 978 sq ft36
Flats(18 -2 BHK, 36-3 BHK and 36-2.5 BHK)804 sq ft90

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Atz Areva possession date and construction status

Not found in public records yet: construction progress

Timeline

  1. 5 Mar 2021Project start date given to RERA
  2. 5 Jul 2021Registered with Karnataka RERA
  3. 1 Dec 2023Completion date given at registration
  4. 1 Dec 2024Section 6 Extension: completion date moved to this date
  5. 30 Jun 2026Further Extension: completion date moved to this date

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 12 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Atz Areva RERA complaints and orders

37 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

37 rows: rera complaints. Scroll inside the table to see them all.

Complaint refFiledSubjectStatusSource
01116/202610 Sep 2026Execute sale deed and delay period compensation and compensation loss of UDSUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
01068/202627 Aug 2026Delayed Possession – Flat [Your Flat No], Date Expired on June 2025Under enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00772/20262 Jul 2026Delay in Possession of Flat 504 and Claim for interest CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00613/202629 May 2026Delay in Possession of Flat 202 and Claim for interest CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00604/202627 May 2026Delay in Possession of Flat 102 and Claim for interest CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00590/202626 May 2026Delay in Possession of Flat 806 and Claim for interest CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00568/202621 May 2026Delay in possession for Flat 408 and Claim for interest compensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00513/202612 May 2026Delay in Possession of Flat 207 and Claim for interest CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00504/202611 May 2026Delay in Possession of Flat 307 and Claim for interest CompensationPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00505/202611 May 2026Interest on Delay Period for Delayed Possession of Flat 209 from December 2023 Till Possession DateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00503/202611 May 2026Delayed Possession -Flat 707 ,Date expired on December 2023Posted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00488/20267 May 2026Delay in Possession of Flat 502 and Claim for interest CompensationPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00784/202528 May 2025Breach of Agreement for my Flat ATZ AREVA -412DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00356/20251 Mar 2025ATZ Areva Project: Delay, Discrepancies, waiver unwarranted penalties and Unauthorised ConstructionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00264/202510 Feb 2025Delay CompensasionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00242/20254 Feb 2025Interest on Delay period, Significant Modifications in the Plan shared while selling and actual approval reveived an year later, No commencement CertificateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00914/202421 Sep 2024Compensation for delayed possession and Early HandoverDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00900/202417 Sep 2024Compensation for delay in possessionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00902/202417 Sep 2024Compensation for delay in possessionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00720/202413 Aug 2024Compensation for delayed possession and missing commencement certificateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00638/202426 Jun 2024Compensation for delayed delivery and possession.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00634/202425 Jun 2024Missing Commencement Certificate, Unauthorized Construction & Multiple deviations from the Project PlanDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00633/202425 Jun 2024No necessary approvals from authorities like BBMP for the revised plan resulting in Delay of project completionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00623/202421 Jun 2024Interest on delay period- delivery date expired_no commemncement certificateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00604/202418 Jun 2024Interest on delay periodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00580/202412 Jun 2024Compensation for delayed possession and Injection above 9th FloorDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00557/20247 Jun 2024Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00548/20246 Jun 2024Compensation for delay in construction/possessionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00546/20245 Jun 2024compensation for delay in construction/possessionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00545/20245 Jun 2024Need compensation for delay in construction/ possession.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00423/20244 May 2024Delayed Possession Compensation & Unauthorised addition of floors.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00417/202429 Apr 2024Compensation for delay in possessionDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00407/202423 Apr 2024Delayed Possession and multiple deviations in floor plansDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00404/202422 Apr 2024interest on delay periodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00223/202423 Feb 2024Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00213/202421 Feb 2024Violation in the construction agreementDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00112/202423 Jan 2024Delayed possession & Commencement Certificate of my flat ATZ Areva-101DisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Atz Properties

Promoter type
Proprietorship Firm
Projects on this site
1
RERA complaints against promoter
38
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Atz Properties’s RERA record

Atz Properties delivery record

As on 14 Oct 2026

What the complaints are about

  • Delay in possession or delay interest34
  • Registration, sale deed or agreement2
  • Construction quality, size or inspection1
  • Litigation or title disclosure1

38 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2021

As on 12 Oct 2026
  1. 10 Sep 2026Complaint 01116/2026 filed with RERA: “Execute sale deed and delay period compensation and compensation loss of UDS” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 27 Aug 2026Complaint 01068/2026 filed with RERA: “Delayed Possession – Flat [Your Flat No], Date Expired on June 2025” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 2 Jul 2026Complaint 00772/2026 filed with RERA: “Delay in Possession of Flat 504 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 29 May 2026Complaint 00613/2026 filed with RERA: “Delay in Possession of Flat 202 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 27 May 2026Complaint 00604/2026 filed with RERA: “Delay in Possession of Flat 102 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 26 May 2026Complaint 00590/2026 filed with RERA: “Delay in Possession of Flat 806 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 21 May 2026Complaint 00568/2026 filed with RERA: “Delay in possession for Flat 408 and Claim for interest compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 12 May 2026Complaint 00513/2026 filed with RERA: “Delay in Possession of Flat 207 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 11 May 2026Complaint 00504/2026 filed with RERA: “Delay in Possession of Flat 307 and Claim for interest Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 11 May 2026Complaint 00505/2026 filed with RERA: “Interest on Delay Period for Delayed Possession of Flat 209 from December 2023 Till Possession Date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 11 May 2026Complaint 00503/2026 filed with RERA: “Delayed Possession -Flat 707 ,Date expired on December 2023” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 7 May 2026Complaint 00488/2026 filed with RERA: “Delay in Possession of Flat 502 and Claim for interest Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 28 May 2025Complaint 00784/2025 filed with RERA: “Breach of Agreement for my Flat ATZ AREVA -412” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 1 Mar 2025Complaint 00356/2025 filed with RERA: “ATZ Areva Project: Delay, Discrepancies, waiver unwarranted penalties and Unauthorised Construction” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 10 Feb 2025Complaint 00264/2025 filed with RERA: “Delay Compensasion” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 4 Feb 2025Complaint 00242/2025 filed with RERA: “Interest on Delay period, Significant Modifications in the Plan shared while selling and actual approval reveived an year later, No commencement Certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 21 Sep 2024Complaint 00914/2024 filed with RERA: “Compensation for delayed possession and Early Handover” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 17 Sep 2024Complaint 00900/2024 filed with RERA: “Compensation for delay in possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 17 Sep 2024Complaint 00902/2024 filed with RERA: “Compensation for delay in possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 13 Aug 2024Complaint 00720/2024 filed with RERA: “Compensation for delayed possession and missing commencement certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 26 Jun 2024Complaint 00638/2024 filed with RERA: “Compensation for delayed delivery and possession.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 25 Jun 2024Complaint 00634/2024 filed with RERA: “Missing Commencement Certificate, Unauthorized Construction & Multiple deviations from the Project Plan” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 25 Jun 2024Complaint 00633/2024 filed with RERA: “No necessary approvals from authorities like BBMP for the revised plan resulting in Delay of project completion” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  25. 21 Jun 2024Complaint 00623/2024 filed with RERA: “Interest on delay period- delivery date expired_no commemncement certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  26. 18 Jun 2024Complaint 00604/2024 filed with RERA: “Interest on delay period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  27. 12 Jun 2024Complaint 00580/2024 filed with RERA: “Compensation for delayed possession and Injection above 9th Floor” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  28. 7 Jun 2024Complaint 00557/2024 filed with RERA: “Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  29. 6 Jun 2024Complaint 00548/2024 filed with RERA: “Compensation for delay in construction/possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  30. 5 Jun 2024Complaint 00546/2024 filed with RERA: “compensation for delay in construction/possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. Showing the latest 30 of 40 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Atz Areva FAQs

What is the completion date for Atz Areva?

The current completion date on RERA is 30 June 2026. The project has had two extensions: the first to 1 December 2024 under Section 6, and a further extension to 30 June 2026.

What home types are available in Atz Areva?

The project offers 1 BHK (1 home), 2 BHK (53 homes), 3 BHK (36 homes), and flats including 18 2 BHK, 36 3 BHK and 36 2.5 BHK units (90 homes).

What are the carpet areas for homes in Atz Areva?

Carpet areas range from 727 sq ft to 978 sq ft depending on home type, with most 1 and 2 BHK units around 804-814 sq ft.

How many homes are there in Atz Areva?

The project has 180 homes in total.

What is the RERA registration number for Atz Areva?

The RERA registration number is PRM/KA/RERA/1251/446/PR/210705/004180, registered on 5 July 2021.

How many RERA complaints are there against Atz Areva?

There are 37 RERA complaints on this project registration.

Where is Atz Areva located?

Atz Areva is located in Balagere, Bengaluru East taluk, Bengaluru Urban district, PIN code 560052.

How many floors does Atz Areva have?

The single tower in Atz Areva has a maximum of 9 floors.

How many other projects does Atz Properties have on record?

Atz Properties has 2 projects in the Bengaluru RERA records, with 38 complaints against the builder across all projects.

Which bank is the escrow bank for Atz Areva?

The escrow bank for Atz Areva is Bank of Baroda.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Atz Areva

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Atz Properties? Review the builder.

Reviews of Atz Properties by verified buyers

No verified reviews of Atz Properties yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Udbhav GokulamUdbhav Builders And Developers0.1 km179Mar 202786%0Not collected
Nirmaanika AdvaitaDaksha Home Developers0.4 km116Dec 2025—0Not collected
Orchid BloomsberryGoyal Hariyana Developers0.5 km417Mar 202888%1Not collected
Sonestaa MelodyM/s. BSS Builders and Promoters0.6 km136Dec 2025—0Not collected
AuraBlue Sky Properties0.7 km154Apr 20309%0Not collected
Purvi ArvindamSai Purvi Infrastructures0.7 km76May 202794%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/210705/004180.

  • RERA record last checked: 12 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 12 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby