Atz Areva
1, 2 & 3 BHK apartments by Atz Properties · Balagere, near Panathur, Bengaluru
Balagere, near Panathur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Jun 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Atz Areva at a glance
- Possession (RERA)Jun 2026 Date passedWas Dec 2023 · Karnataka RERA
- RERA complaints (project)37 complaintsKarnataka RERA · as on 12 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroKodibisanahalli · 3.04 km (under construction)Open now: Nallurahalli, 4.15 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 118 min at peak29.16 km straight line · estimate
- Nearest lakeVarthur Lake · 444 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Atz Areva is a residential project by Atz Properties in Balagere, Bengaluru with 180 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Atz Areva buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Atz Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Atz Areva buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 727 – 978 sq ft
- Towers
- 1
- Floors
- 9
- Total homes
- 180
- Land
- 1.17 acres
- Possession (extended)
- Jun 2026
- Built (RERA update)
- Not found in public records yet: construction progress
Atz Areva RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/210705/004180
- Registered on
- 5 Jul 2021
- Promised completion
- 1 Dec 2023
- Extended to
- 30 Jun 2026
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| ATZ AREVA | 9 | 1 | 90 |
A dash (—) means the filing did not state that value.
Summary in plain English
Atz Areva is a residential project by Atz Properties in Balagere, Bengaluru East, with 180 homes in 1 tower. The project was registered with RERA on 5 July 2021 with a completion date of 30 June 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 55% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Bank of Baroda, Infantry Road
- Project cost declared to RERA
- ₹47 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Atz Areva location and address
- Address
- Khatha No.350, Sy. No.74/2 and Sy. No.75/2, Munciple No.10, , Balagere Village, Varthur Hobli, Bangalore East Taluk
- Village (RERA)
- Balagere
- Locality
- Near Panathur
- PIN code
- 560052
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.93928, 77.72548
Distances to landmarks
Not found in public records yet: landmarksAbout Balagere
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 5.1 km | approx. 21 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 5.54 km | approx. 22 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 11.93 km | approx. 48 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.66 km | approx. 67 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.44 km | approx. 71 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 29.16 km | approx. 118 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 14Schools and colleges12 schools, 0 colleges, 2 kindergartens
- 16Hospitals and clinics3 hospitals, 13 clinics
Nearest schools and colleges
- Sarah Montessori · 0.45 km
- NPS Marathahalli · 1.04 km
- Ekya Nava · 1.08 km
Nearest hospitals and clinics
- Shubham · 0.34 km
- Apollo Clinic · 0.61 km
- Nakkshatra Clinic · 0.92 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction3.04 km
- Marathahalli (ಮಾರತಹಳ್ಳಿ)Blue Line metro, under construction3.34 km
- Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station4.15 km
- Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station1.99 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Varthur Lake, 444 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Varthur Lake on OpenStreetMap (opens in a new tab) (ವರ್ತೂರು ಕೆರೆ)444 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,114 m
- Thubarahalli Lake on OpenStreetMap (opens in a new tab) (ತೂಬರಹಳ್ಳಿ ಕೆರೆ)1,955 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Atz Areva floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans5 pages

Sanctioned floor plansFiled 20 Mar 2021 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 814 sq ft | 1 |
| 2 BHK | 727 – 888 sq ft | 53 |
| 3 BHK | 941 – 978 sq ft | 36 |
| Flats(18 -2 BHK, 36-3 BHK and 36-2.5 BHK) | 804 sq ft | 90 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Atz Areva possession date and construction status
Timeline
- 5 Mar 2021Project start date given to RERA
- 5 Jul 2021Registered with Karnataka RERA
- 1 Dec 2023Completion date given at registration
- 1 Dec 2024Section 6 Extension: completion date moved to this date
- 30 Jun 2026Further Extension: completion date moved to this date
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Atz Areva RERA complaints and orders
37 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
37 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01116/2026 | 10 Sep 2026 | Execute sale deed and delay period compensation and compensation loss of UDS | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01068/2026 | 27 Aug 2026 | Delayed Possession – Flat [Your Flat No], Date Expired on June 2025 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00772/2026 | 2 Jul 2026 | Delay in Possession of Flat 504 and Claim for interest Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00613/2026 | 29 May 2026 | Delay in Possession of Flat 202 and Claim for interest Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00604/2026 | 27 May 2026 | Delay in Possession of Flat 102 and Claim for interest Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00590/2026 | 26 May 2026 | Delay in Possession of Flat 806 and Claim for interest Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00568/2026 | 21 May 2026 | Delay in possession for Flat 408 and Claim for interest compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00513/2026 | 12 May 2026 | Delay in Possession of Flat 207 and Claim for interest Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00504/2026 | 11 May 2026 | Delay in Possession of Flat 307 and Claim for interest Compensation | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00505/2026 | 11 May 2026 | Interest on Delay Period for Delayed Possession of Flat 209 from December 2023 Till Possession Date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00503/2026 | 11 May 2026 | Delayed Possession -Flat 707 ,Date expired on December 2023 | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00488/2026 | 7 May 2026 | Delay in Possession of Flat 502 and Claim for interest Compensation | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00784/2025 | 28 May 2025 | Breach of Agreement for my Flat ATZ AREVA -412 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00356/2025 | 1 Mar 2025 | ATZ Areva Project: Delay, Discrepancies, waiver unwarranted penalties and Unauthorised Construction | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00264/2025 | 10 Feb 2025 | Delay Compensasion | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00242/2025 | 4 Feb 2025 | Interest on Delay period, Significant Modifications in the Plan shared while selling and actual approval reveived an year later, No commencement Certificate | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00914/2024 | 21 Sep 2024 | Compensation for delayed possession and Early Handover | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00900/2024 | 17 Sep 2024 | Compensation for delay in possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00902/2024 | 17 Sep 2024 | Compensation for delay in possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00720/2024 | 13 Aug 2024 | Compensation for delayed possession and missing commencement certificate | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00638/2024 | 26 Jun 2024 | Compensation for delayed delivery and possession. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00634/2024 | 25 Jun 2024 | Missing Commencement Certificate, Unauthorized Construction & Multiple deviations from the Project Plan | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00633/2024 | 25 Jun 2024 | No necessary approvals from authorities like BBMP for the revised plan resulting in Delay of project completion | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00623/2024 | 21 Jun 2024 | Interest on delay period- delivery date expired_no commemncement certificate | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00604/2024 | 18 Jun 2024 | Interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00580/2024 | 12 Jun 2024 | Compensation for delayed possession and Injection above 9th Floor | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00557/2024 | 7 Jun 2024 | Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00548/2024 | 6 Jun 2024 | Compensation for delay in construction/possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00546/2024 | 5 Jun 2024 | compensation for delay in construction/possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00545/2024 | 5 Jun 2024 | Need compensation for delay in construction/ possession. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00423/2024 | 4 May 2024 | Delayed Possession Compensation & Unauthorised addition of floors. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00417/2024 | 29 Apr 2024 | Compensation for delay in possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00407/2024 | 23 Apr 2024 | Delayed Possession and multiple deviations in floor plans | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00404/2024 | 22 Apr 2024 | interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00223/2024 | 23 Feb 2024 | Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00213/2024 | 21 Feb 2024 | Violation in the construction agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00112/2024 | 23 Jan 2024 | Delayed possession & Commencement Certificate of my flat ATZ Areva-101 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Atz Properties
- Promoter type
- Proprietorship Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 38
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Atz Properties’s RERA recordAtz Properties delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Atz Properties in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 180Homes registeredAs stated in each registrations.
- 38RERA complaints5 open, 33 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 211.1Complaints per 1,000 homes38 complaints ÷ 180 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
38 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2021
- 10 Sep 2026Complaint 01116/2026 filed with RERA: “Execute sale deed and delay period compensation and compensation loss of UDS” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Aug 2026Complaint 01068/2026 filed with RERA: “Delayed Possession – Flat [Your Flat No], Date Expired on June 2025” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jul 2026Complaint 00772/2026 filed with RERA: “Delay in Possession of Flat 504 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2026Complaint 00613/2026 filed with RERA: “Delay in Possession of Flat 202 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 May 2026Complaint 00604/2026 filed with RERA: “Delay in Possession of Flat 102 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 May 2026Complaint 00590/2026 filed with RERA: “Delay in Possession of Flat 806 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2026Complaint 00568/2026 filed with RERA: “Delay in possession for Flat 408 and Claim for interest compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 May 2026Complaint 00513/2026 filed with RERA: “Delay in Possession of Flat 207 and Claim for interest Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00504/2026 filed with RERA: “Delay in Possession of Flat 307 and Claim for interest Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00505/2026 filed with RERA: “Interest on Delay Period for Delayed Possession of Flat 209 from December 2023 Till Possession Date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00503/2026 filed with RERA: “Delayed Possession -Flat 707 ,Date expired on December 2023” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 May 2026Complaint 00488/2026 filed with RERA: “Delay in Possession of Flat 502 and Claim for interest Compensation” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 May 2025Complaint 00784/2025 filed with RERA: “Breach of Agreement for my Flat ATZ AREVA -412” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2025Complaint 00356/2025 filed with RERA: “ATZ Areva Project: Delay, Discrepancies, waiver unwarranted penalties and Unauthorised Construction” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Feb 2025Complaint 00264/2025 filed with RERA: “Delay Compensasion” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Feb 2025Complaint 00242/2025 filed with RERA: “Interest on Delay period, Significant Modifications in the Plan shared while selling and actual approval reveived an year later, No commencement Certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Sep 2024Complaint 00914/2024 filed with RERA: “Compensation for delayed possession and Early Handover” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Sep 2024Complaint 00900/2024 filed with RERA: “Compensation for delay in possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Sep 2024Complaint 00902/2024 filed with RERA: “Compensation for delay in possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Aug 2024Complaint 00720/2024 filed with RERA: “Compensation for delayed possession and missing commencement certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Jun 2024Complaint 00638/2024 filed with RERA: “Compensation for delayed delivery and possession.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jun 2024Complaint 00634/2024 filed with RERA: “Missing Commencement Certificate, Unauthorized Construction & Multiple deviations from the Project Plan” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jun 2024Complaint 00633/2024 filed with RERA: “No necessary approvals from authorities like BBMP for the revised plan resulting in Delay of project completion” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Jun 2024Complaint 00623/2024 filed with RERA: “Interest on delay period- delivery date expired_no commemncement certificate” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Jun 2024Complaint 00604/2024 filed with RERA: “Interest on delay period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jun 2024Complaint 00580/2024 filed with RERA: “Compensation for delayed possession and Injection above 9th Floor” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Jun 2024Complaint 00557/2024 filed with RERA: “Delay of flat handover and multiple deviations from the project plan. Registered with RERA. Do not allow to construct above 10th floor.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jun 2024Complaint 00548/2024 filed with RERA: “Compensation for delay in construction/possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Jun 2024Complaint 00546/2024 filed with RERA: “compensation for delay in construction/possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. Showing the latest 30 of 40 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Atz Areva FAQs
What is the completion date for Atz Areva?
The current completion date on RERA is 30 June 2026. The project has had two extensions: the first to 1 December 2024 under Section 6, and a further extension to 30 June 2026.
What home types are available in Atz Areva?
The project offers 1 BHK (1 home), 2 BHK (53 homes), 3 BHK (36 homes), and flats including 18 2 BHK, 36 3 BHK and 36 2.5 BHK units (90 homes).
What are the carpet areas for homes in Atz Areva?
Carpet areas range from 727 sq ft to 978 sq ft depending on home type, with most 1 and 2 BHK units around 804-814 sq ft.
How many homes are there in Atz Areva?
The project has 180 homes in total.
What is the RERA registration number for Atz Areva?
The RERA registration number is PRM/KA/RERA/1251/446/PR/210705/004180, registered on 5 July 2021.
How many RERA complaints are there against Atz Areva?
There are 37 RERA complaints on this project registration.
Where is Atz Areva located?
Atz Areva is located in Balagere, Bengaluru East taluk, Bengaluru Urban district, PIN code 560052.
How many floors does Atz Areva have?
The single tower in Atz Areva has a maximum of 9 floors.
How many other projects does Atz Properties have on record?
Atz Properties has 2 projects in the Bengaluru RERA records, with 38 complaints against the builder across all projects.
Which bank is the escrow bank for Atz Areva?
The escrow bank for Atz Areva is Bank of Baroda.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Atz Areva
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Atz Properties? Review the builder.
Reviews of Atz Properties by verified buyers
No verified reviews of Atz Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Udbhav GokulamUdbhav Builders And Developers | 0.1 km | 179 | Mar 2027 | 86% | 0 | Not collected |
| Nirmaanika AdvaitaDaksha Home Developers | 0.4 km | 116 | Dec 2025 | — | 0 | Not collected |
| Orchid BloomsberryGoyal Hariyana Developers | 0.5 km | 417 | Mar 2028 | 88% | 1 | Not collected |
| Sonestaa MelodyM/s. BSS Builders and Promoters | 0.6 km | 136 | Dec 2025 | — | 0 | Not collected |
| AuraBlue Sky Properties | 0.7 km | 154 | Apr 2030 | 9% | 0 | Not collected |
| Purvi ArvindamSai Purvi Infrastructures | 0.7 km | 76 | May 2027 | 94% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/210705/004180.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 12 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Balagere, near VarthurUnder constructionRERA registeredBuyers’ group openUdbhav Gokulam
by Udbhav Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 723 – 1,112 sq ft
- Mar 2027
179 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Udbhav Gokulam
Balagere, near GunjurReady to moveRERA registeredBuyers’ group openNirmaanika Advaita
by Daksha Home
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 377 – 942 sq ft
- Dec 2025
116 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Nirmaanika Advaita
Balagere, PanathurUnder constructionRERA registeredBuyers’ group openOrchid Bloomsberry
by Goyal Hariyana
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 761 – 1,021 sq ft
- Mar 2028
417 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Orchid Bloomsberry