Skip to content
Log in

Axis Amarissa

3 BHK apartments by Axis Concept Construction Pvt Ltd · Badamanavarthe Kaval, Kanakapura Road, Bengaluru

Badamanavarthe Kaval, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Axis Concept Construction Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Axis Amarissa

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Axis Amarissa is a residential project by Axis Concept Construction Pvt Ltd in Badamanavarthe Kaval, Bengaluru with 81 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2029.

Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Axis Amarissa buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Axis Concept Construction Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Axis Amarissa buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 19 Oct 2026
Home types
3 BHK
Carpet area
860 – 1,676 sq ft
Towers
1
Floors
4
Total homes
81
Land
1.36 acres
Possession (RERA)
Dec 2029
Built (RERA update)
25%

Axis Amarissa RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/141125/008255
Registered on
14 Nov 2025
Promised completion
31 Dec 2029
Extended to
No extension recorded
RERA status
New launch
Homes booked
23 of 81 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Tower4181

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Axis Amarissa is a residential project by Axis Concept Construction Pvt Ltd in Badamanavarthe Kaval, Bengaluru South. The project has 81 homes in 1 tower with 4 floors, with completion expected on 31 December 2029. As of Q1 2026-27, construction is 25% complete with 23 homes booked.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
54.3% of land
Water and power
Water source filed with RERA: Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Karnataka Bank Ltd., BTM Layout Bengaluru
Building plan (RERA)
BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority · No. BMICAPA/Building-01/63/2025-26 · dated 13 Oct 2025
Project cost declared to RERA
₹82.53 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Indoor Sports facility
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Axis Amarissa location and address

Address
Sy. No. 288/1 (Old Survey No. 132), Village Panchayath Khatha No. 288/1 , E-Khata No. 150200302202001256, Kanakapura Road, Badamanavarthe Kaval Village (B.M. Kaval) , Bengaluru South , Bengaluru Urban, Karnataka - 560082
Village (RERA)
Badamanavarthe Kaval
Locality
Kanakapura RoadAlso known as Kanakapura Main Road
PIN code
560082
City
Bengaluru
State
Karnataka
Coordinates
12.82970, 77.51347

Distances to landmarks

Not found in public records yet: landmarks

About Kanakapura Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)16.57 kmapprox. 67 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.59 kmapprox. 71 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)20.98 kmapprox. 85 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)26.89 kmapprox. 109 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)29.99 kmapprox. 121 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)46.15 kmapprox. 187 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 5Schools and colleges1 schools, 4 colleges, 0 kindergartens
  • 2Hospitals and clinics2 hospitals, 0 clinics

Nearest schools and colleges

  • Indus Business Academy · 0.41 km
  • Dayananda Sagar Academy of Technology and Management · 0.52 km
  • Sri Sri Institute · 0.88 km

Nearest hospitals and clinics

  • Sri Sri Ayurveda hospital · 1.23 km
  • St. John's Health Centre · 1.82 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station3.98 km
  • Kengeri (ಕೆಂಗೇರಿ)Nearest railway station10.3 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Thathaguni Agara Kere, 1,277 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Axis Amarissa floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans

Approved building plan2 files

Approved layout plan3 files

Home typeCarpet areaHomes
3 BHK860 – 1,676 sq ft81

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Axis Amarissa possession date and construction status

  • Whole project (promoter’s RERA update)25%

    as on · 23 of 81 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
3 BHK812358

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 3 Nov 2025Project start date given to RERA
  2. 14 Nov 2025Registered with Karnataka RERA
  3. 31 Dec 2029Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 14 Jul 2026

At the average pace so far, construction would reach 100% around Jun 2028 — about 18 months before the completion date on RERA (31 Dec 2029).

At the pace between the 3 quarterly filings we have (15% → 25% in 6 months), it would be around Mar 2030 — about 3 months after the RERA date.

0%25%50%75%100%20262027202820292030RERA date15%20%25%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q1 2026-27to 30 Jun 202614 Jul 202625%23 of 81
Q4 2025-26to 31 Mar 202614 Apr 202620%12 of 81
Q3 2025-26to 31 Dec 202513 Jan 202615%9 of 81
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 25% ÷ 7.9 months (3 Nov 2025 to 30 Jun 2026) = 3.2% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 75 ÷ 3.2 = 23.6 months → Jun 2028. This is an estimate, not a date from the builder or RERA.

Pace between filings = (25% − 15%) ÷ 5.9 months = 1.7% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority · No. BMICAPA/Building-01/63/2025-26 · dated 2025-10-13Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDC Office Bengaluru · No. 35940 · dated 2025-06-25Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 19 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority · No. BMICAPA/Building-01/63/2025-26 · dated 13 Oct 2025
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Axis Amarissa RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Axis Concept Construction Pvt Ltd

Promoter type
Company
Projects on this site
3
RERA complaints against promoter
0
Company number (CIN)
U45201KA2007PTC043841

From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Axis Concept Construction Pvt Ltd’s RERA record

Axis Concept Construction Pvt Ltd delivery record

As on 19 Oct 2026
  • 3Projects in Bengaluru on RERA3 approved registrations under Axis Concept Construction Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 186Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 186 homes in its 3 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Axis OaklynOC on RERA31 Mar 20273 Oct 2026By the date

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Oct 2025

As on 19 Oct 2026
  1. 14 Jul 2026Quarterly update filed for Q1 2026-27: 25% built, 23 of 81 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Apr 2026Quarterly update filed for Q4 2025-26: 20% built, 12 of 81 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 13 Jan 2026Quarterly update filed for Q3 2025-26: 15% built, 9 of 81 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 14 Nov 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/141125/008255); completion date 31 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 3 Nov 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 13 Oct 2025Building plan approved by BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority (No. BMICAPA/Building-01/63/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Axis Amarissa FAQs

What is Axis Amarissa?

Axis Amarissa is a residential project by Axis Concept Construction Pvt Ltd with 81 homes located in Badamanavarthe Kaval, Bengaluru South.

When will Axis Amarissa be completed?

The completion date on the RERA record is 31 December 2029.

What home types are available in Axis Amarissa?

The project has 3 BHK homes. Carpet areas range from 860 sq ft to 1,676 sq ft.

How many homes are in Axis Amarissa?

Axis Amarissa has 81 homes in total.

What is the construction progress of Axis Amarissa?

As of Q1 2026-27 (quarter ended 30 June 2026), construction is 25% complete with 23 homes booked.

What is the RERA registration number for Axis Amarissa?

The RERA registration number is PRM/KA/RERA/1251/310/PR/141125/008255, registered on 14 November 2025.

Where is Axis Amarissa located?

Axis Amarissa is located in Badamanavarthe Kaval, Bengaluru South taluk, Bengaluru Urban district, PIN code 560082.

Are there any RERA complaints on Axis Amarissa?

There are no RERA complaints on this project.

What is the builder's track record?

Axis Concept Construction Pvt Ltd has 6 projects in the RERA record for Bengaluru with no complaints against the builder.

Which bank is managing the escrow account for Axis Amarissa?

Karnataka Bank Ltd. is the escrow bank for Axis Amarissa.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Axis Amarissa

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Axis Concept Construction Pvt Ltd? Review the builder.

Reviews of Axis Concept Construction Pvt Ltd by verified buyers

No verified reviews of Axis Concept Construction Pvt Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Bren AnantaBren Corporation Private Limited1.3 km217Aug 20279%0Not collected
Sattva SpringsSattva Resi Private Limited1.4 km66Sep 202742%0Not collected
Primus DarpanAmeliorate Realtors Private Limited1.4 km173Dec 202963%0Not collected
Aarohana AlterraAarohana Projects1.5 km518Aug 20332%0Not collected
Bren AvaanaBren Corporation Private Limited1.6 km327Feb 202820%0Not collected
Sri Sri SattvaSri Sumeru Realty Private Limited1.8 km418Mar 203327%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/141125/008255.

  • RERA record last checked: 19 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 14 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Kanakapura Road